1. The equipment must be checked before starting, and the operation can only be started after the equipment is in good condition
2. Check and sort out the operation place to ensure that there are no flammable materials (such as oil rags, waste oil gloves, paint, perfume, etc.) and no air leakage, water leakage;
3. Ensure that the temperature of the operating room shall not exceed 25
4. Ensure that there is no magnetic field (such as magnets) within the working range of the welding robot, and the source of sensation.
5. Check whether the mold (tooling) selection is correct and whether the mold (tooling) equipment is in place;
6. Check the operation session to ensure that the shading equipment is in good condition and in place, and whether the vacuum collection equipment is operating normally
|
More on that
|
Steps to replace the battery of the KUKA robot
Precautions for replacing the battery:
It is necessary for the robot control system to be shut down and have protection measures against accidental restarts;
The power cord is de-energized;
It is necessary to wear gloves when disassembling.
...
|
|
Industrial robot coordinate system and its characteristics - KUKA robot
1. Cartesian coordinate type
(1) Advantages: This kind of operator has a simple structure, strong intuitive movement, and is convenient to achieve high precision.
(2) Disadvantages: It occupies a large space and has a small working range.
2. Cylindrical coordinate type
(1) Strengths: Same Cartesian coordinate type ...
|
|
Introduction to the logic functions of the KUKA robot program
Introduction to logic programming, the input and output terminals are used in logic programming, and in order to communicate with the peripheral devices of the robot control system, digital and analog input and output terminals can be used.
TO THE KUKA MACHINE ...
|
|
Features of submerged arc welding of welding robots – KUKA robots
1. High production efficiency
This is because the extension length of the wire is small when KUKA robots perform submerged arc welding, so a large welding current can be selected. For example, when electrode arc welding uses electrode welding, the current range is 250 - 350A, while submerged arc welding is usually 600? 850A, ...
|
|
KUKA robot application examples
Berthold Hermle AG is one of the world's leading manufacturers of milling machines and machining centers. When it comes to the automation of its machining centers, Hermle relies on the expertise of KUKA Roboter GmbH from Augsburg. In the new production system RS 4, the company ...
|
|
Handling robot classification - KUKA robots
The transfer robot is a manipulator in practical work, and the manipulator is developed because its positive role is increasingly known:
First, it can partially replace manual operation;
Second, it can follow the requirements of the production process, follow the certain procedures, time...
|
|
How to change the oil of the KUKA robot
1. Preparation tools: refueling ***, ratchet wrench, plum blossom hexagon, open movable wrench, ratchet set, multimeter, Japan Sanjian sealant.
2. Preparation materials: refueling barrels, waste cloths, oil drums, air pipes, rust removers, thread glue.
3. Adjust the posture of the robot ...
|
|
KUKA Robotics Knowledge Points
1. The KUKA robotic arm body is composed of 1) base 2) turntable 3) balance cylinder 4) big arm 5) small arm 6) central shaft. In the meantime, not every robot has a balance cylinder, and robots with larger loads will be equipped with a balance tank.
...
|
|
Quadrilateral programming for KUKA robot programming
In the KUKA robot quadrilateral program, an accounting reference point is set, and other points of the quadrilateral are calculated with the reference point, and then the robot TCP is used to take a quadrilateral trajectory using the movement command. This program is for reference only, basic programming program.
...
|
|
Steps to replace the external fan of the KUKA robot
1. Unplug the fan from the control panel.
2. Loosen the 4 screws and remove the back plate.
3. Remove the set screws from the socket.
4. Fold the piercing sleeve and pull out the connecting wire.
5. Take the fan bracket with the fan...
|
|
Top 10 Faults and Solutions for KUKA Robots
In the process of long-term use of KUKA robots, with the increase of operation time, various parts and parts will present various problems due to the influence of many factors such as friction, corrosion, vibration, impact, bumps, etc., so only by dealing with these problems and insisting on the normal operation of the robot can ...
|
|
How to use welding robots for a long time – KUKA
First, welding robot inspection and protection
1. Wire feeding arrangement. Including whether the wire feeding force is normal, whether the wire feeding tube is damaged, and whether there is an abnormal alarm.
2. Is the airflow normal?
3. Is the torch safety protection system normal? (It is forbidden to close the welding torch safety protection ...
|
|
KUKA palletizing robots
KUKA palletizing robots are widely used to move goods to or from pallets (unloading palletizing) and to lift, palletize, pack, transport, sort and mark. This process is not only closely related to the wooden furniture industry, the food logistics sector, but also ...
|
|
KUKA robot power-on explanation
Commentary: After the arrival of the KUKA robot, the customer can complete the initial power-on and normal operation of the robot according to the explanation process.
First, electrical connection
Second, the initial power-on
Third, safety equipment
Fourth, the robot zero-point proofreading
Fifth, IO equipment
...
|
|
KUKA teach pendant programming
(1) Teach: P6, P7, P8, P9, HOME
Refer to P4 and teach P6 with LIN command: P3, P2 and Pl respectively, and teach P7, P8 and pg with PTP command; Return to the HOME point with the PTP command as shown, the end of the machine ...
|
|
The structure of the KUKA robot
The structure of the robot with a straight tandem structure is simplified, as shown in the figure below. The six-axis straight tandem robot has six joint axes from A1 to A6, during which A1, A4, and A6 are rotary axes, and other A2, A3, and A5 are swing axes.
The robot motion system attaches great importance to the end node of the robot motion chain.
|
|
KUKA KR 210 R2700-2 maintenance precautions
1. Power supply in front of the device
The problem rate of the power supply is very high in the programming of the KUKA robot in the whole problematic device, so it is easy to overhaul the power supply first.
2. First the general and then the special
Faults caused by the quality of assemblies or other equipment faults generally account for the common ...
|
|
KUKA robot protective clothing role
KUKA robot protective clothing is divided into a variety of types, different types have different functions, anti-static, dustproof, waterproof, etc. Here is a detailed introduction to the different types of robot protective clothing, different characteristics and protective functions provided by Hongsheng Decheng.
...
|
|
Areas where KUKA robots can be used
KUKA robots can be used for material handling, processing, stacking, spot welding, and arc welding in occupations such as automation, metalworking, food, and plastics. Users of KUKA industrial robots include: General Motors, Chrysler, Ford, Porsche, BMW, Audi, Run, Volkswagen...
|
|
The robot is running a jitter cause check – the KUKA robot
1. Is it that the load data you entered is incorrect?
If the load data is too high or too low, and the difference between the load and the practice load is too large, it will cause flutter!
2. Whether there is a large range of turning or posture changes in the running trajectory of the robot ...
|
|