KUKA KR 210 R2700-2 maintenance precautions

Create Date: 2024-8-30 12:03:23|Source: KUKA

1. Power supply in front of the device

The problem rate of the power supply is very high in the programming of the KUKA robot in the whole problematic device, so it is easy to overhaul the power supply first.

2. First the general and then the special

Faults caused by assembly quality or other equipment faults generally account for about 50% of common faults. The special faults of electrical equipment are mostly soft faults, which need to be measured and repaired through experience and instruments. For example, because a 0.5 kW motor cannot move the load, some people think that it is a load problem. According to our experience, we should give priority to wearing thick gloves and grabbing along the direction of rotation of the motor, and as a result, we were caught, which is the problem of the motor itself.

3. First outside and then inside

Do not rush to replace the damaged electrical components, and consider replacing the damaged electrical components of the KUKA robotic arm after acknowledging that the peripheral circuits are normal.

                               KUKA KR 210 R2700-2 maintenance precautions

4. DC first and then communication

During maintenance, it is necessary to check the static operation point of the DC circuit first, and then check the dynamic operation point of the communication loop.

5. Debugging after failure.

For the electrical equipment that coexists with debugging and faults, the faults should be removed first, and then the debugging should be carried out under the premise that the circuit is normal.

6. Move your mouth before you start

For faulty electrical equipment, we should not rush to start, we should first ask the cause of the fault and the reason is not an obstacle. For unfamiliar equipment, you should be familiar with the circuit principle and structural characteristics, and abide by the corresponding rules. Before disassembling and unloading the truck, you should be fully familiar with the function, orientation, connection method and connection with other surrounding devices of KUKA robotic arm, if there is no assembly drawing, sketches and symbols should be made when dismantling.

7. First outside and then inside

See if the device has significant cracks and shortcomings, learn about its repair history and service life, and then look at the equipment to see inside the machine. Before dismantling, sweep away the surrounding faults, admit that it is an internal problem and then disassemble it, if you blindly disassemble the equipment, the situation will get worse and worse.

8. Mechanical first and then electrical

Only after acknowledging that there is no problem with the mechanical parts should an electrical inspection be carried out. When checking for faults in the circuit, it is necessary to use the detector to find out the fault, and then check the connection between the circuit and the mechanical operation after acknowledging that there is no defective contact problem, so as to avoid misjudging the programming of the KUKA robot.

9. Static first and then dynamic

When the equipment is not powered on, check whether the buttons, contactors, thermal relays, and fuses of the electrical equipment are in good condition to confirm the fault. Energize the test, listen to the sound, measure the parameters, identify the fault, and carry out repairs. For example, when the motor is out of phase, if the measured three-phase voltage cannot be distinguished, the sound of the KUKA robotic arm should be listened to, and each phase should be measured separately Only when the voltage is applied to the ground, can we determine which phase has shortcomings.

10. Clean before repair

For the electrical equipment with severe pollution, the buttons, wiring points, and contact points should be cleaned first, and the external environment control keys should be checked to see if they are out of order. Many problems are caused by dust and conductive dust. Once cleaned, the problem is often wiped out.

More on that
Automatic assembly of high-precision transmissions – KUKA robots Automatic assembly of high-precision transmissions – KUKA robots

Each sensor on the seven axes of the KUKA robot LBR IIWA records everything that touches with the partner to ensure safety when assembling the DQ 200 automatic transmission, which requires several high-precision tasks in the manufacture of the transmission. This is not news for Škoda Auto. ŠkodaAuto ...

KUKA welding robot servo motor squeak processing KUKA welding robot servo motor squeak processing

The main effect of the KUKA welding robot servo motor is to convert the signal (control voltage or phase) into mechanical displacement, in the production and use of KUKA robot has the characteristics of high precision, good low frequency characteristics, high additional speed, short speed response time, etc., therefore, the KUKA robot servo electric ...

KUKA won the Red Dot Award for Design Concept 2021 KUKA won the Red Dot Award for Design Concept 2021

Continuously digitizing construction sites: this is the goal behind the "KUKA NOX" concept study, which was developed by KUKA Corporate Research in collaboration with a Switzerland planning student. Mobile construction robots help to measure and draw on the construction site, making everything important.

Analysis of the abnormal noise of the KUKA robot reducer Analysis of the abnormal noise of the KUKA robot reducer

Planning reasons and countermeasures 1. Japan RV reducer internal gear accuracy level planning Japan RV reducer planners often consider economic factors as much as possible to confirm the gear accuracy level negligence accuracy level is the gear noise and backlash mark. United States Gear Manufacturers Association ...

Procedure for KUKA to repair and replace the main unit of the control system Procedure for KUKA to repair and replace the main unit of the control system

KUKA robot repair and replacement of the main engine of the control system: It is necessary to keep the KUKA robot control system shut down and power-off, and do a good job of relevant inspection and personal maintenance operations, in case the robot is restarted without permission, and the robot's buffer must be sure to ...

How the KUKA bot program works How the KUKA bot program works

The KUKA robot program is operated in several different ways and can be selected on the teach pendant. 1. By clicking on the "Program Operation Method" icon, you can check and select different methods Second, the program operator ...

Frequently asked questions about KUKA robot motors Frequently asked questions about KUKA robot motors

1. KUKA robot motor coil repair, leakage, burning, overcurrent, overvoltage, heating, hot starting, alarm, tripping, and weak work; 2. The servo motor is weak in magnetism repair work, and the low-speed (no-load) can be alarmed at high speed (operation); 3. The repair of the external shaft motor of the robot is encountered.

The role of KUKA robot protective clothing The role of KUKA robot protective clothing

KUKA robot protective clothing is divided into a variety of types, different types have different functions, anti-static, dustproof, waterproof, etc. Here is a detailed introduction to the different types of robot protective clothing provided by Hongsheng Decheng, different characteristics and protective functions. ...

KUKA robot instructions and syntax KUKA robot instructions and syntax

Instructions and grammar · Program structure o Modules § Global § Local § Modules without data lists o Function blocks § Global § Local § With parameter passing § The function blocks of the system preset ...

KUKA robots and CNC machines perform stamping methods KUKA robots and CNC machines perform stamping methods

First, a single robot stamping and unloading: the robot will transfer the plate data from the palletizing table to the positioning table, and then transfer it to the stamping die for stamping after positioning, and after the stamping is completed, the data will be brought into the palletizing table through the robot, and the single pressure robot will be automatically loaded and unloaded. Second, robot stamping ...

KUKA robot KSS drive module upgrade operation KUKA robot KSS drive module upgrade operation

This function can be used to install KSS updates, e.g. from KSS 8.3.0 to KSS 8.3.1. After installing or updating the KUKA system software, the robot control system always performs an initial cold start. We believe that all relevant data should be archived prior to software updates. If you want, you can ...

Maintenance of the control cabinet of KUKA robot systems Maintenance of the control cabinet of KUKA robot systems

1. Protect content 1. Check the heat dissipation of the controller It is forbidden to cover the manipulator with plastic or other materials; Leave a satisfying distance between the rear and side of the controller (>120mm); It is forbidden to place the controller close to the heat source; It is forbidden to put debris on the top of the controller; Prevent the controller from being too dirty; ...

The reason why the robot jitters during operation is the KUKA robot The reason why the robot jitters during operation is the KUKA robot

Why does the robot flutter when it is running? Please do the following: 1. Is it that the load data you entered is incorrect? If the load data is too high or too low, and the difference between the load and the practice load is too large, it will cause flutter! 2、 ...

How KUKA robots implement the KRL variable How KUKA robots implement the KRL variable

KRL is KUKA's programming language, and when programming a robot, variables are memory of various calculated values presented during the operation of the robot program. Each variable belongs to a specific data type, and it is necessary to declare the data type before using it; Variables can be divided into local ...

KUKA robots are processed in the form of motion axes KUKA robots are processed in the form of motion axes

The boundary of robot operation is to move parts and things in space through a certain organization, and the needs naturally represent the position and posture of the parts, things, and the organization itself. In order to delimit and apply the mathematical quantities that represent potentials, it is necessary to delimit the coordinate system and give the rules of representation. ...

KUKA robot oil seal position replacement KUKA robot oil seal position replacement

In the foreign capital to speed up the layout of China's parallel robot shopping mall, the domestic market is not to be outdone, with the advantage of cost performance and the development of new use areas, domestic parallel robots or will take the lead in opening the game with foreign capital. Now, most of the world's domestic parallel robots ...

KUKA teach-in Smart Welding KUKA teach-in Smart Welding

In order to solve the pain points of welding professions, such as high variety, small batch, poor team consistency, harsh working environment, long commissioning time, and difficult changeover, KUKA Industry has launched a new treatment solution, Smart Welding. Smart Welding is developed in depth according to kuka.SimPro, offline programming without teaching, no ...

Steps to replace a KVGA graphics card with a KUKA robot Steps to replace a KVGA graphics card with a KUKA robot

1. Before replacing the KVGA, the following preparations must be made: 1. The robot control system must be in a shutdown state and maintained to avoid unauthorized accidental restart. 2. The buffer is turned off. 3. Put the feeder cable in a powerless state. ...

Top 10 Faults and Solutions for KUKA Robots Top 10 Faults and Solutions for KUKA Robots

In the process of long-term use of KUKA robots, with the increase of operation time, various parts and parts will present various problems due to the influence of many factors such as friction, corrosion, vibration, impact, bumps, etc., so only by dealing with these problems and insisting on the normal operation of the robot can ...

Classification of industrial robots – KUKA robots Classification of industrial robots – KUKA robots

1. According to the coordinate method of the operating machine, it can be divided into: (1) Cartesian coordinate industrial robots Its moving part is composed of three straight lines moving (i.e., PPP) in a straight line with each other, and its working space is rectangular. Its movement interval in each axis can be carried out in all axes.

CATEGORIES BYPASS
Customer Service Center

Online Consultation:QQ


ContactContact

Contact: Manager Huang

Contact QQ: 3271883383

Contact number: 13522565663


Scan the code to add WeChat (please save the picture first on the mobile phone)

working hoursworking hours

Weekdays: 9:00-17:00

Holidays: Only emergencies are handled

Contact us

Contact us

Contact number QQ consultation
QQ consultation

3271883383

Company address
Back to top