Schneider inverter ATV32 acceleration and deceleration operation method

Create Date: 2024-8-30 12:03:23|Source: Schneider/Schneider

1. Use the operation method of clicking the button:

In addition to the direction of travel, 2 logic inputs are required to add a speed given, e.g. LI5 is assigned the acceleration function, and LI6 is assigned the deceleration function. Then pressing LI5 will add the given velocity, and pressing LI6 will decrease the given velocity.

2. Use the operation method of double-clicking the button:

Only one logical input is required to be assigned to "+speed", e.g. LI5. Use the double-click button to add and detract the speed, take the forward direction as an example, when LI1 is closed, after the Schonei inverter is running, then turn on the "+ speed", for example, LI5, the speed will be added when the speed is given, after disconnecting LI5, insist that LI1 is turned on, and the speed value will be adhered to. If LI1 is disconnected for a period of time and then turned on, the given value of the speed and the practical speed will also decrease.

                              Schneider inverter ATV32 acceleration and deceleration operation method

More on that
Inverter power-saving method - Schneider Inverter power-saving method - Schneider

First, it is a fan/pump load Second, the device itself has a power-saving function (software support) Third, we need to work for a long time The above are the three conditions that reflect the results of power saving. If it is said that the power frequency of the inverter is energy-saving without conditions, it is ...

Schneider power supply configuration UPS backup battery method Schneider power supply configuration UPS backup battery method

In order to ensure that the APCUPS power supply can continue to provide high-quality power to the computer in the event of a power outage, it is particularly important to equip the battery backup battery. When the frequency load does not agree to be supplied with power, the backup time of the UPS battery in the communication room should be greater than the time from the suspension of the mains power to the recovery or until the generator set is normal.

Schneider disconnector operation inspection contents Schneider disconnector operation inspection contents

(1) Whether the closing condition of the isolation switch is not defective, and whether there is any failure or dislocation; (2) The porcelain insulation of the isolation switch should be free of defects, no cracks, no discharge phenomena and flashover traces; (3) Contact inspection: a. Check the contact ...

Schneider Vijeo-Designer compilation error factor Schneider Vijeo-Designer compilation error factor

Q1833: Because you are using an older version of Runtime, the download does not last. Please use the Runtime Device program on the Vijeo Designer CD to upgrade the runtime. When you download to an older runtime ...

Inverter selection and capacity matching - Schneider Inverter selection and capacity matching - Schneider

In addition, it is unscientific to select the inverter body alone, without considering whether the inverter selection and capacity matching are appropriate. ...

Schneider inverter Eplan file download Schneider inverter Eplan file download

Product line: Frequency converters and soft starters Solution(s): All Eplan software users can visit the Eplan website (directly from the Eplan software). The EPLAN database includes ...

The upper and lower frequency parameters of the inverter - Schneider The upper and lower frequency parameters of the inverter - Schneider

The output frequency of the inverter set by the user according to the needs of the production process. For example: the original power frequency power supply of the fan motor is now transformed into frequency conversion speed regulation, you can set the given frequency to 50 Hz, and there are two ways to set it: one is to use the operation panel of the inverter to input the digital quantity of the frequency 5 ...

How to choose the Schneider ATV71 and the meaning of the letter How to choose the Schneider ATV71 and the meaning of the letter

The Schneider inverter model generally reflects the rated voltage, rated power, and load requirements of the inverter (heavy load is still light load type). Here are 2 examples: Example 1: Schneider inverter model: ATV71HD11 ...

Common analysis method for electrical control line faults - Schneider Common analysis method for electrical control line faults - Schneider

1) Survey and research method. The investigation and research method is to understand the obvious problem phenomena through "seeing", "listening", "smelling", "touching" and "asking"; After visiting the operator, understand the cause of the failure; A common way to help find the fault point after asking others or consulting information ...

Schneider PLC failure steps Schneider PLC failure steps

(1) If the signal is controlled on a counter, first look at the logic that controls the reset, then the counter signal. Follow steps 2 to 5 above. (2) If Schneider PLC aborts in some places where the output is encouraged, generally in the middle of the situation, then look for the next step ...

Advantages and disadvantages of closed busbars compared with open busbars - Schneider Advantages and disadvantages of closed busbars compared with open busbars - Schneider

The advantages of closed busbars over open busbars are: 1) Closing the bus duct can reduce the grounding fault, avoid the short circuit between phases, basically eliminate the grounding defect caused by external moisture, dust and foreign objects, and improve the continuity of generator operation. 2) Eliminate ...

Input/output pins P0, P1, P2, P3 functions Input/output pins P0, P1, P2, P3 functions

P0.0——P0. 7 : Port P0 is an 8-bit open-drain bidirectional I/O port. When visiting off-chip memory, it is time-shared for a low-8-bit address and an 8-bit bidirectional data bus. When EPROM is programmed, the instruction byte is input by P0, and when the program is verified, it outputs ...

The contents of the daily inspection of Schneider inverters The contents of the daily inspection of Schneider inverters

1) Whether the ambient temperature is normal or not, it is required to be in the range of -10-+40 °C, and it is better to be about 25 °C. whether the humidity meets the requirements, and whether the ventilation and heat dissipation of doors and windows are outstanding; Whether the lower air inlet and upper air outlet of the inverter are dusty or blocked due to excessive dust. ...

Schneider inverter disturbance and treatment method Schneider inverter disturbance and treatment method

A. Methods of Communication: (1) Radiation disturbance (2) Conduction disturbance B. Immunity Methods With regard to nuisance signals transmitted by radiation methods, they are primarily weakened by wiring and shielding the radioactive source and the disturbed lines. About Tong ...

Schneider electrical circuit control fault range Schneider electrical circuit control fault range

In general, depending on the phenomenon of equipment problems, the scope of the problem can be roughly confirmed as follows: 1) All button functions fail, and there is a high possibility of power supply or fuse problems. 2) Some buttons are invalid, and some of the buttons are functioning normally ...

NSX molded case circuit breaker selection - Schneider NSX molded case circuit breaker selection - Schneider

The Schneider NSX molded case circuit breaker has a double rotary contact construction for maintenance, and the high-end electronic trip unit allows for accurate measurement and easy communication. Schneider NSX molded case circuit breaker conforms to IEC60947-2, GB14048.2, China's CCC certification and multinational classification certification...

The operation essentials of Schneider disconnectors The operation essentials of Schneider disconnectors

Schneider Barrier Features: First of all, Schneider Barrier Switch can be used to block the power supply, it is able to disconnect the live equipment from the high-voltage maintenance equipment, and it can also see a significant disconnection point on it. Secondly, the Schneider barrier switch can be used with the circuit breaker to change the operation of the system.

Schneider inverter ATV61 OPF failure analysis Schneider inverter ATV61 OPF failure analysis

Q: 250KW ATV61 with 250KW fan, when decelerating to low speed, OPF (motor missing three-phase) problem will be reported occasionally. There are no contactors or switches between the inverter and the motor. Answer: This situation seems to be a problem with the inverter, which is a false alarm. Not really! The fan is decelerating ...

Schneider inverter and PLC connection problems Schneider inverter and PLC connection problems

When the inverter is used to form an automatic control system for control, in many cases, PLC and inverter are used together, and how to correctly connect the PLC and inverter together has become the key to the success of the system. 1.PLC switch ...

The difference between Schneider verification and calibration The difference between Schneider verification and calibration

(1) The intent is different The intent of the verification is to carry out a mandatory comprehensive appraisal of the measuring equipment. This comprehensive identification of areas attributed to the value of the same value is a top-down process of value transfer. The verification shall identify whether the measuring equipment meets the specified requirements. This kind of regulation requires ...

CATEGORIES BYPASS
Customer Service Center

Online Consultation:QQ


ContactContact

Contact: Manager Huang

Contact QQ: 3271883383

Contact number: 13522565663


Scan the code to add WeChat (please save the picture first on the mobile phone)

working hoursworking hours

Weekdays: 9:00-17:00

Holidays: Only emergencies are handled

Contact us

Contact us

Contact number QQ consultation
QQ consultation

3271883383

Company address
Back to top