|
Manual operation of industrial robots – KUKA robots
The linear motion of an industrial robot refers to the linear motion of the tool TCP mounted on the flange of the sixth axis of the robot in space. The coordinate linear motion should specify the coordinate system, tool coordinates, and workpiece coordinates. Coordinate systems include earth coordinates, datum coordinates, tool coordinates, and workpiece coordinates. Specified ...
|
|
Introduction to the IF logic of the KUKA robot
1. Enter the program in the form of the teach pendant T1, click on the lower left corner: Instruction - Logic, and you will see the commonly used logic instructions such as WAIT, WAITFOR, and OUT.
2. Select WAIT. The lower end of the interface *** presents the WAIT Time port sec .
|
|
Steps to replace the battery of the KUKA robot
Precautions for replacing the battery:
It is necessary for the robot control system to be shut down and have protection measures against accidental restarts;
The power cord is de-energized;
It is necessary to wear gloves when disassembling.
...
|
|
KUKA robot collision recognition settings
If a robot collides with an object, the robot control system will increase the axis torque in order to overcome the resistance. This can cause damage to robots, tools, or other components. Bump recognition will reduce the risk of such damage. The bump recognition system monitors the shaft torque. If the ...
|
|
How KUKA robots perform load tests
Load Test Method:
1. Install the Load data determination load test software, change the teach pendant language to English, and only recognize English, German and Japanese during the load test, not Chinese.
2. ...
|
|
KUKA welding robots ensure the quality of welding
In the domestic welding robot equipment career development speed is fast, from the past individual enterprise use, to the current most of the professional production welding is inseparable from KUKA robot equipment, the application field is more and more extensive.
The most important thing in welding work is to ensure the quality of welding, welding quality ...
|
|
Common problems and solutions of KUKA robots
1. The boot coordinate system is invalid
The international coordinate system is based on the gun head, in this coordinate system, all the actions of the robot are completed in accordance with the gun head as the vertex to complete the movement, the XYZ direction to cut the gun direction does not change, if the machine ...
|
|
KUKA robot teach pendant panel
1. Hot-swap button for the cable of the robot teach pendant (after pressing this button, the control cabinet can unplug the teach pendant without shutting down).
2. Connect the manager key switch; Switch the mode of movement, T1: manual low speed (as long as the manual mobile robot is capable in this form, * high speed 250mm/s), T2: manual ...
|
|
TCP correction steps for KUKA robots
1. Select Put into operation > Measure > Stuff > XYZ 4 points from the main menu.
2. Give a number and a name for the thing to be measured. I admit it with the continuation key.
3. Use TCP to move to any reference point. Click Measure. Click Yes to reply to the security question ...
|
|
Enjoy a drink at the fully automated robot bar – the KUKA robot
KR CYBERTECH IS THE WORLD'S FIRST ROBOT BAR
BAIER Engineering GmbH has developed the world's first fully automated bar with the help of a bar robot, which is in collaboration with the University of Aalen (Hochschule Aalen) and the beverage industry.
|
|
KUKA robot reports KSS15101 fault maintenance analysis
Fault Symptom:
After the robot is turned on, the teach pendant shows KSS15101 fault code (the safety device is wrong in 5 safety nodes from 0 to 4 channels), and the robot cannot be put into operation normally.
Fault Detection:
First inspect the site ...
|
|
3D Sensors AI&Co sees KUKA robots stacking kiln bricks
The need to look at robots, i.e., the need to use camera skills on industrial robots, is increasing. The camera makes the robot sensitive. As a result, the customer will be able to cope with many variations in the production process. "There are up to 100 different varieties of kiln bricks," said Kautenburger GmbH ...
|
|
The Kuka robot sets up a network connection
How do I set up a network connection for my Kuka robot? No matter what method you choose to set up your network connection, the first few steps are the same, so how do we do it?
1. Fulfill the X-start ...
|
|
KUKA robots are programmed to implement the KRL variable method
Variable naming conventions
KRL is KUKA's programming language, and when programming a robot, variables are memory of various calculated values presented during the operation of the robot program. Each variable belongs to a specialized data type, and it is necessary to declare the data type before applying it; Variables are selected according to ...
|
|
Industrial robot coordinate system and its characteristics - KUKA robot
1. Cartesian coordinate type
(1) Advantages: This kind of operator has a simple structure, strong intuitive movement, and is convenient to achieve high precision.
(2) Disadvantages: It occupies a large space and has a small working range.
2. Cylindrical coordinate type
(1) Strengths: Same Cartesian coordinate type ...
|
|
KUKA faulty robot start-up check steps
Step 1: View the environment
1. Recognize the ambient temperature: the ambient temperature of the KUKA control cabinet is required to be between 5°C-45°C, the operating environment temperature of the robot body is 10°C-55°C, and the operating temperature of some new models is 0°C-55°C (see the robot skills manual for details).
|
|
KUKA teach pendant programming
(1) Teach: P6, P7, P8, P9, HOME
Refer to P4 and teach P6 with LIN command: P3, P2 and Pl respectively, and teach P7, P8 and pg with PTP command; Return to the HOME point with the PTP command as shown, the end of the machine ...
|
|
Start the robot after external stop and stop – the KUKA robot
Abort the robot: Cut off the signal $drivers_Off, this abort is to break the robot servo.
Continue to start the robot after abort: Repeat the previous article "KUKA Robot External Active Start Equipment Method 1" process 4 and 5 to start the robot.
...
|
|
Introduction to the principle of KUKA robots
description
1 Robots
2 Control cabinet
3 Motor cable X30
4 Data cable X31
5 Motor cable X20
6 Data Cable X21
7 Grounding cable 16 mm²
8 Power supply 400 V 3 - X1
...
|
|
KUKA robot system backup and restoration
1. Archiving Channels:
During each archiving process, a ZIP file is generated on the corresponding policy media
Same name as the robot. The file name can be changed individually under the robot data.
Storage Orientation: There are three different storage orientations to choose from:
...
|