Classification of Schneider molded case circuit breakers

Create Date: 2024-8-30 12:03:23|Source: Schneider/Schneider

1. According to the device method, it is divided into: vertical installation and horizontal installation.

  2. According to the use of circuit breakers: power distribution maintenance type, motor maintenance type.


                               Classification of Schneider molded case circuit breakers


  3. According to the wiring method: board front wiring, board back wiring, plug-in wiring.

  4. According to the operation method, it is divided into: direct operation of the handle, operation of the external rolling handle, and electric operation.

  5. According to the type of tripper: only instantaneous action tripper (electromagnetic tripper), thermal + electromagnetic tripper (duplex), and electronic tripper.

  6. According to the number of poles: two poles, three poles, four poles; In the four-pole circuit breaker, there are four types of neutral pole (N-pole):

  Type A: The N pole is not equipped with an overcurrent tripper, and the N pole is directly connected and not divided with the other three poles.

  Type B: The N pole is not equipped with an overcurrent tripper, and the N pole is divided together with the other three poles.

  Type C: The N-pole is equipped with an overcurrent tripper, and the N-pole is divided together with the other three poles.

  Type D; The N-pole is equipped with an overcurrent tripper, and the N-pole is directly connected and does not merge with the other three poles.
More on that
Is there a restriction on the installation direction when Schneider installs the inverter? Is there a restriction on the installation direction when Schneider installs the inverter?

It should be basically stored in the plate, the problem is that the plate with a fully enclosed structure is large in size, takes up a lot of space, and the cost is higher. This can be done by: (1) The planning of the disc should be based on the heat dissipation required by the actual device; (2) Profit ...

Inverter maintenance mantra method - Schneider Inverter maintenance mantra method - Schneider

Don't worry about the damage of the frequency conversion, disassemble the machine after the discharge; It is indispensable to ask for a diagnosis and clarify the problem at the beginning of the test; Input and output PN junction, three-phase balance and then unshelling; Look at the nameplate before powering on, the wrong voltage will blow up; The bus has no electricity to see that it is safe, and the rectifier filter is wrong ...

Precautions for Schneider motors when operating above 60Hz Precautions for Schneider motors when operating above 60Hz

When operating beyond 60Hz, the following precautions should be taken (1) 1 Machinery and devices should be able to operate at this speed (mechanical strength, noise, oscillation, etc.). (2) The motor enters the constant power output range, and its output ...

The contents of the daily inspection of Schneider inverters The contents of the daily inspection of Schneider inverters

1) Whether the ambient temperature is normal or not, it is required to be in the range of -10-+40 °C, and it is better to be about 25 °C. whether the humidity meets the requirements, and whether the ventilation and heat dissipation of doors and windows are outstanding; Whether the lower air inlet and upper air outlet of the inverter are dusty or blocked due to excessive dust. ...

Frequency converter control motor leakage solution - Schneider Frequency converter control motor leakage solution - Schneider

Because the current at the input and output ends of the inverter contains high-frequency components, the leakage current formed by the high-frequency components when the inverter is driven is greater than that when the grid power supply is supplied. Because there are many varieties of circuit breakers, in some cases, even the inverter wires and motors ...

How long does a UPS power supply last after a power outage – Schneider How long does a UPS power supply last after a power outage – Schneider

The UPS power supply can supply power for a period of time after the power is cut off, but how long can the UPS power supply be powered after the power outage? UPS power supply manufacturers said that the power supply time of UPS power supply is inconsistent according to the load power, the number of batteries and other factors. ...

Dynamic phase angle tuning of inverter motors – Schneider Dynamic phase angle tuning of inverter motors – Schneider

1. The control cabinet, the main engine, and the brake connection line are correct, and the voltage is correct; 2. Safety circuit, door lock circuit is normal, limit switch, speed change switch and close; 3. The connection cable from the encoder to the PG card must be reliable and accurate; ...

Precautions for setting parameters of Schneider inverter Precautions for setting parameters of Schneider inverter

 Debugging parameters: ​ 1. Acceleration and deceleration time Speed up the time setting requirements: the acceleration current is constrained below the overcurrent capacity of the inverter, so that the overflow will not cause the inverter to trip; Deceleration time setting key ...

Schneider Electric Innovation Summit "The future is digital" Schneider Electric Innovation Summit "The future is digital"

The name of a company's product was mentioned more than anyone could remember, but on the first day of the Schneider Electric North America Innovation Summit in Atlanta on Tuesday, another word appeared even more often ...

Schneider ATV71 selection and letter meaning Schneider ATV71 selection and letter meaning

The type of Schneider inverter generally reflects the rated voltage, rated power, and load requirements of the inverter (heavy or light load). Here are two examples: Example 1: Schneider Inverter Type: ATV71HD11N ...

Schneider power supply configuration UPS backup battery method Schneider power supply configuration UPS backup battery method

In order to ensure that the APCUPS power supply can continue to provide high-quality power to the computer in the event of a power outage, it is particularly important to equip the battery backup battery. When the frequency load does not agree to be supplied with power, the backup time of the UPS battery in the communication room should be greater than the time from the suspension of the mains power to the recovery or until the generator set is normal.

Instrumentation mechanical equipment system - Schneider Instrumentation mechanical equipment system - Schneider

1. Power system: The wire and cable products selected in the power system mainly include overhead bare wires, busbars (busbars), power cables (plastic cables, oil-paper power cables (fundamentally replaced by plastic power cables), rubber cables, overhead insulated cables), branch cables (replacing part of the busbars), ...

Schneider miniature circuit breaker problem analysis and answer Schneider miniature circuit breaker problem analysis and answer

Fault 1: The shell of Schneider MCB product is yellowed or burned. Reason 1: It is very likely that the magnetic coil inside the circuit breaker is burned out because of harmonics or high-frequency signals. Method 1: * The good thing is that the filtering can be satisfied with the use of 50Hz/60Hz power frequency. ...

Schneider inverter maintenance precautions Schneider inverter maintenance precautions

Schneider Electric intelligent special effect inverter maintenance, the daily maintenance of the inverter mainly depends on your use environment, such as moisture-proof, dust-proof, anti-foreign body ingress, pay attention to whether there is any abnormal sound when usually protecting. Attention to the needs of inverter protection ...

Schneider PLC intelligent parameter features Schneider PLC intelligent parameter features

Characteristic: 1. NEZA PLC (TSX08 series) EZA series is a small PLC with rich functions, high performance-to-price ratio, small size and strong versatility. A new generation of handheld programmer - Chinese PDA PL707WinCE, supports Chinese interface, whether it is programming, ...

Schneider medium-voltage inverters focus on energy saving Schneider medium-voltage inverters focus on energy saving

Because the impact of foreign electrical products on domestic electrical equipment is relatively large, now Schneider inverter equipment occupation is facing a big technical promotion, taking inverter as an example, the national connotation of inverter shopping mall domestic brand and foreign brand, regardless of technology, processing and manufacturing, industrial design and other aspects are still ...

The inverter controls the speed of the AC motor – Schneider The inverter controls the speed of the AC motor – Schneider

Most of the motors used in the industry are of this type. The rotational speed of an induction AC motor (henceforth referred to as a motor) is approximately determined by the number of poles and frequency of the motor. The number of poles of the motor is fixed by the working principle of the motor. Since the pole ...

Calculation method of inverter capacity - Schneider Calculation method of inverter capacity - Schneider

1. Accounting of inverter capacity when the load is continuously changed periodically In many cases, the load of the motor changes periodically. Obviously, in this case, picking the capacity of the inverter according to the minimum load will be overloaded, and it will be uneconomical to select according to the maximum load.

Schneider inverter enters the parameter setting method Schneider inverter enters the parameter setting method

1. The first step is to check whether the inverter is connected to the line, and whether the wiring of the control line and the power circuit is correct 2. Next, turn on the power of the inverter, enter the motor parameters, and perform motor identification 3. Next, set the function parameters to launch the ...

Schneider instrumentation maintenance precautions Schneider instrumentation maintenance precautions

1. When installing and adjusting the appearance, the original status should be recorded for rehabilitation. 2. When repairing the appearance of fine instruments, if you accidentally bounce small parts away, you should first determine the direction where you can fly.

CATEGORIES BYPASS
Customer Service Center

Online Consultation:QQ


ContactContact

Contact: Manager Huang

Contact QQ: 3271883383

Contact number: 13522565663


Scan the code to add WeChat (please save the picture first on the mobile phone)

working hoursworking hours

Weekdays: 9:00-17:00

Holidays: Only emergencies are handled

Contact us

Contact us

Contact number QQ consultation
QQ consultation

3271883383

Company address
Back to top