Specifications for the use of Yaskawa welding robots.
Before the experiment.
When experimenters enter the laboratory, they should wear tools and take protective measures.
Prepare experiment-related equipment (welding masks, etc.) and consumables in advance.
Before the start of the experiment, check whether the shielding gas has gas and whether the power supply is normal.
Check whether the positive and negative electrodes of the weld are connected normally.
Turn on the Yaskawa robot chassis switch (from green area to red area) and turn on the welder. (The steering wheel can be reset incorrectly, and the welding machine is the same, check whether the connection has a spit line or air supply)
Check that the welding wire is working properly and that it can breathe normally.
When preparing for the experiment, please keep a distance of 3 meters from the robot to ensure safety.
Experiments.
Prepare the welding parameters (such as current), save the JOB model under the welding machine interface after the power is turned on, enter the interface in the parameter area on the left, enter the JOB project on the right, and make JOB corrections.
On the robot handle, click on the main menu, select other items under welding conditions, and check the JOB, corresponding to the JOB model.
Go back to the main menu, click on Programs, select Programs (to enter the programmed program), select New Programs, click on New Programs to enter the name, and click on the screen to execute to enter the new programs.
The compiler needs to turn on the servo and press the button on the back (tap to connect, press again to disconnect)
Select the coordinate system to adjust the pose joint coordinate system, Cartesian coordinate system).
The compiler must select the supplementary method, the safety point must select MOVJ, and the welding process must choose other supplementary methods such as MOVL.
After the experiment.
At the end of the experiment, the robot is returned to the origin or second origin.
Turn off the welding and robot motors, and turn off the power.
Keep a record of the experiment, lose used consumables and scrap, and remove the welded products.
Clean up the garbage around and keep the lab clean.
Clean the ground and clean up the welding waste residue.
When using Yaskawa welding robots, they must be used in accordance with the specifications. Otherwise, unpredictable hazards occur.
|
More on that
|
Yaskawa inverter - the selection of high-voltage inverter precautions
1 Disadvantages of choosing too high a voltage level
Choosing too high a voltage level results in too high an investment and a long payback period. With the increase of the voltage level, the insulation of the motor must be improved, so that the price of the motor increases. The increase of the voltage level increases the number of series connections of power semiconductor devices in the inverter, ...
|
|
A brief introduction to Yaskawa teach pendant programming
The display of the teach-in programmer is a 5.7-inch color display. The available characters are English letters, numbers, symbols, katakana, hiragana, and kanji. In addition, when entering Japanese, you can also convert it to kana kanji by entering romaji.
Rotate [REMOTE] to enter the remote ...
|
|
Yaskawa servo drive fault code and handling method
1. If the fault code on the Yaskawa servo drive is UV1, it means that the low voltage of the main circuit is lower than the low voltage standard of 200V, at this time, we need to check whether there is a problem with the wiring of the power supply;
2. If the ...
|
|
Yaskawa inverter common fault--GF-ground fault
In addition to eliminating the cause of the problem of motor grounding, the most likely part of the failure is the Hall sensor, which is affected by environmental factors such as temperature and humidity, and the working point is easy to drift, resulting in GF alarm.
Produce...
|
|
Summary of common faults and solutions of Yaskawa robots and accessories (1-8)
01. The robot switch often jumps or can't close?
Cause:
1. Aging of switches;
2. The switch selection is wrong;
3. The pump is stuck or the motor is short-circuited;
4. The line is aging, short circuit, the line is too small or the phase is missing.
Solution: Convert the control ...
|
|
How to deal with the occurrence of OL2 in Yaskawa inverter
OL2 is the inverter overload alarm, check whether it is a real overload or a false overload.
1. Test whether the output current of the inverter exceeds the rated current of the inverter, if it exceeds it, it may be the mechanical reason, if it does not exceed the inverter detection circuit is broken, and the false overload is reported.
...
|
|
Common faults and solutions of Yaskawa inverter
(1) Overcurrent, display character: OC. The reason for tripping is the short circuit of UVW at the output end, the load is too large, the acceleration/deceleration time is set incorrectly or the torque is unreasonable, resulting in overcurrent or overheating of the main circuit module. Check whether there is a short circuit in the motor junction box, whether the motor winding is to the ground, phase to phase ...
|
|
Yaskawa servo motor - common faults and maintenance methods of servo drives
1. The LED light is green, but the motor does not move
(1) Cause of failure: The motor in one or more directions is prohibited from operating.
Solution: Check the +INHIBIT and –INHIBIT ports.
(2) Cause of failure: The command signal is not to the driver signal.
...
|
|
The operation steps of the Yaskawa robot
1. Turn on the power switch and compressed air switch of Yaskawa robot.
2. Turn on the main power switch on the Yaskawa robot control cabinet. After the robot completes the self-test, press the servo power button to turn on the servo power supply of the motor. Press the teach-in button (TEACH) on the control cabinet to make the machine ...
|
|
Fault codes for Yaskawa servo drives
1. If the fault code on the Yaskawa servo drive is UV1, it means that the low voltage of the main circuit is lower than the low voltage standard of 200V, at this time, we need to check whether there is a problem with the wiring of the power supply;
2. If the ...
|
|
Yaskawa Robotics - the main functions and components of industrial robot controllers
The main functions of the industrial robot controller
The controller mainly solves the forward kinematics and inverse kinematics of the robot to help the robot complete the trajectory planning. The controller of the industrial robot is composed of controller hardware and controller software.
|
|
Yaskawa EPX2050 customization of robotic spraying protective clothing
Yaskawa EPX2050 robots are often used in the automotive and other industrial painting fields to complete a variety of spraying operations, but long-term operations require the use of robot protective clothing to protect them. The following is a brief introduction to how Yaskawa EPX2050 spraying protective clothing is customized.
Yaskawa EPX205 ...
|
|
Yaskawa escorts new energy with ultra-fine technology to create a 95kw motor
When it comes to electric motors, many people feel that they are more ambiguous, in fact, with the beginning of the entire automobile industry to the new energy technology level, this year in China will produce an annual output of two million new energy vehicles of a great business scale, but although the current policy and development trend of the natural environment ...
|
|
Yaskawa inverter fault display Ou how to deal with the fault when running at high speed
1. The cause of the failure may be that the power plug is not plugged in properly.
Solution: Check and plug in the power plug.
2. The sensor is damaged and the resistance value is wrong.
Solution: Replace the sensor.
3. The fuse is blown out.
Solution: Repair and replace the fuse ...
|
|
How to choose a Yaskawa inverter model
1. Specifications and parameters of the motor
The inverter drives the motor during use, so the inverter can be selected from the perspective of the motor to select the model and specification. First of all, we must first understand the specifications and parameters of the motor. You can use Yaskawa inverter ...
|
|
Common fault analysis and treatment methods of Yaskawa inverter
1. OC1 and OC3 are faulty
In many cases, the occurrence of OC (overcurrent fault) in Yaskawa inverter will be caused by the following reasons (now take A500 series inverter as an example):
(1) Caused by improper parameter setting, such as time setting is too short;
(2) Internal ...
|
|
Yaskawa Robotics - the main technology of the robot control system
(1) Open modular control system architecture: using distributed CPU computer structure, divided into robot controller (RC), motion controller (MC), optoelectronic isolation I/O control board, sensor processing board and programming teaching box, etc. The Robot Controller (RC) and the programmed teaching pendant are connected via a string...
|
|
Yaskawa servo drive parameters
PN000 function selection N.0010 (setting value) 0th position: set the direction of rotation of the motor; Set "1" to change the rotation of the motor in reverse. 1st position: Set the control mode to: "1" position control mode.
PN200 Command Pulse Input Mode Function Selection N.0101 (Set Value) "1" Positive ...
|
|
Yaskawa servo drive maintenance alarm C90, AC9 fault handling method
1. Analysis of the causes of Yaskawa servo alarm C90 (AC9):
1. The encoder cable is broken or the encoder plug is made in poor process (there are also wiring errors in the alarm of the new machine);
2. The servo drive itself is faulty;
3. Environmental interference, caused by poor connection: ...
|
|
Yaskawa has actively fought the epidemic and gradually and steadily recovered its industry
On July 10 this year, Yaskawa Electric announced the announcement of the consolidated accounting liquidation report for the period of March ~ May this year (according to the international accounting standards for business enterprises). Of this amount, the total profit was $620,000, down 22% from the same period last year. Main electric ...
|
|