How to deal with Mitsubishi PLC failures
01. Base system problem
In Mitsubishi PLC, there are binary, octal, decimal, 10, 2-10 (BCD), etc., we need to master the conversion of 2-8 base.
2-8, remember the binary number from the back, divide every 3 into a group, and each group is converted into octal respectively, such as 1 ...
|