Steps to replace a KVGA graphics card with a KUKA robot

Create Date: 2024-8-30 12:03:23|Source: KUKA

1. Before replacing the KVGA, the following preparations must be made:

1. The robot control system must be permanently shut down and protected against unauthorized accidental restarts.

2. The buffer is closed.

3. Put the feeder cable in a powerless condition.

4. Work in accordance with ESD principles.

5. Do not operate alone, and need to be carried out by more than two people together to prevent accidents.

                               Steps to replace a KVGA graphics card with a KUKA robot

2. After the above operations are completed, you can enter the operation process of replacing the KVGA graphics card.

1. Open the door of the cabinet controlled by the KUKA robot.

2. Flip open the PC case.

3. Unplug the KVGA card.

4. Loosen the card's fixture and pull it out of the slot.

5. Check the new card for mechanical damage, pierce it into the slot and secure it.

6. Plug in the plug wiring of the connection card.

7. The KVGA graphics card replacement is over.

3. The setup process of the KVGA graphics card.

1. Enter the *** user group, and then enter the windows level (CTRL-ESC).

2. Select the menu order The system controls > displays > features> sets > expands > chips.

3. There are the following options to choose from in the teach pendant display window:

CRT (External Display)

LCD (KUKA Control Panel KCP Operation)

OBTH (both are displayed)

The graphics driver file name is "Chips XPm.sys"

4. The above options can be selected according to our own needs.

5. The KVGA graphics card setup ends.

More on that
The main parameter of the industrial robot is the KUKA robot The main parameter of the industrial robot is the KUKA robot

The main technical parameters of the robot are freedom, resolution, working space, working speed, working load, etc. The comfort of the robot refers to the number of independent motion parameters required to determine the orientation and posture of the robot's hand in space. The degree of freedom of the robot is generally equal to ...

Features of submerged arc welding of welding robots – KUKA robots Features of submerged arc welding of welding robots – KUKA robots

1. High production efficiency This is because the extension length of the wire is small when KUKA robots perform submerged arc welding, so a large welding current can be selected. For example, when electrode arc welding uses electrode welding, the current range is 250 - 350A, while submerged arc welding is usually 600? 850A, ...

Advantages of the KUKA robot KMR iiwa Advantages of the KUKA robot KMR iiwa

Able to combine: Design your individual total solution. The modular system KMR iiwa offers numerous combinations of robotic skills, mobile channels and industrial components. Sensitive: LBR iiwa light machine ...

Procedure for TCP correction of KUKA robots Procedure for TCP correction of KUKA robots

1. In the main menu, select the > Measure > Thing > XYZ 4 points. 2. Give a number and a name for the thing to be measured. I admit it with a persistent key. 3. Use TCP to move to a reference point at will. Click Measure. Click Yes to reply to the security question ...

Things to check before the KUKA robot is put into operation Things to check before the KUKA robot is put into operation

Before the KUKA robot is put into operation for the first time, it is necessary to carry out a review to ensure that the equipment and equipment are intact and functional, that they can operate safely and that faults can be identified. It is necessary for us to comply with the labor protection regulations of the country and region to check, and it is also necessary to test all safety ...

Automatic assembly of high-precision transmissions – KUKA robots Automatic assembly of high-precision transmissions – KUKA robots

Each sensor on the seven axes of the KUKA robot LBR IIWA records everything that touches with the partner to ensure safety when assembling the DQ 200 automatic transmission, which requires several high-precision tasks in the manufacture of the transmission. This is not news for Škoda Auto. ŠkodaAuto ...

KUKA force sensors correct the position of the robot KUKA force sensors correct the position of the robot

The force sensor is used to detect the external force information, and the force signal is converted into the azimuth of the robot. Compliance exercises are implemented in a five-joint robot. Robot teach pendant repair advocates the use of real-time gravity and clash compensation to complete direct education without torque sensors. A method of free force manipulation is proposed ...

How KUKA robots perform load tests How KUKA robots perform load tests

Load Test Method: 1. Install the Load data determination load test software, change the teach pendant language to English, and only recognize English, German and Japanese during the load test, not Chinese. 2. ...

How to set the load of the KUKA robot How to set the load of the KUKA robot

1. Problems in the load setting of KUKA robots In fact, there is only one intention, a suitable load, under the appropriate driving force, the manipulator can withstand enough moment of inertia regardless of static or dynamic to ensure that the electrical control system controls the manipulator. and other machines ...

KUKA robot control cabinet fault analysis and solutions KUKA robot control cabinet fault analysis and solutions

One: The switch jumps often and may not be able to close? 1. Aging of switches 2. The switch selection is incorrect 3. The pump is stuck or the motor is short-circuited 4. The line is aging, short circuit, and the line is too small or lacks phase. Solution: Turn off the power of the control system...

Introduction to KUKA welding robots Introduction to KUKA welding robots

KUKA welding robot has stable performance, large working space, fast moving speed, strong load capacity, and the welding quality is significantly better than manual welding, which greatly improves the production efficiency of spot welding operations. Spot welding machine is mainly used for spot welding of automobiles.   With the development of the automobile industry, butt welding ...

KUKA industrial robots change the maximum speed KUKA industrial robots change the maximum speed

1. Do a load test and use it correctly in the program. 2. Replace all LIN and CIRC commands with SLIN and SCIRC 3. Delete the PTP movement instructions that are repeated at the point, and try to have as few transition points as possible 4. Can be used with the imminent ...

Obstacle avoidance control of the manipulator – KUKA robots Obstacle avoidance control of the manipulator – KUKA robots

The kinematic redundancy of freedom of the manipulator means that the manipulator has more degrees of freedom than is required at the end of the manipulator. Kinematic manipulators with redundant degrees of freedom have better functions than manipulators with non-redundant degrees of freedom. For example, a manipulator with non-redundant degrees of freedom has obstacles in the external environment.

The reason why the MOS tube was burned by a servo motor drive is a KUKA robot The reason why the MOS tube was burned by a servo motor drive is a KUKA robot

Once the phenomenon of the robot servo motor drive burning MOS tube is started, the external stable wire of the drive will be burned, and the equipment cannot be operated. When the repairer checked, he found that a power tube had been damaged, but because there was no material, he couldn't figure out the effect of the tube.

KUKA robot zero point correction step KUKA robot zero point correction step

1: T1 mode, no program selection, the program start button is normal, and each axis of the robot reaches the position near the zero point; 2: Connect the EMD, the robot is X32; 3: Unscrew the lid with the tail of the device, and set the ...

KUKA robot external axis motor grouping KUKA robot external axis motor grouping

In order to improve the welding attainability, the arc welding workstation usually uses a variety of positioners, and the common formforms of positioners include L-shaped positioners, tipping positioners, headstock positioners, etc. In the meantime, the L-type positioner and the tilting positioner have two external shafts, and some special working conditions require ...

KUKA landed at the Industry Fair to lead industrial intelligence KUKA landed at the Industry Fair to lead industrial intelligence

The 21st China International Industry Fair (CIIF) will be held at the National Convention and Exhibition Center (Shanghai) from September 17 to 21, 2019. At booth E025 in hall 8.1H, KUKA will bring a series of digital and intelligent robot products and application processing plans to the show! All along, KU ...

Execution of the CELL.src program of the KUKA robot Execution of the CELL.src program of the KUKA robot

1) Run the CELL.src program in T1 or T2 form, perform part (1) in the figure, the KUKA robot performs back to the HOME point, performs the BCO operation, the window displays "BCO has been reached", and the BCO operation makes the KUKA robot run to the track. ...

KUKA Robot Teach Pendant KRC4 Troubleshooting KUKA Robot Teach Pendant KRC4 Troubleshooting

1. Fault phenomenon: KUKA Robot Teach Pendant KRC4 The screen is out of order, and the mouse arrows do not move when touching the screen, and there is no change in orientation. 2. Causes: There are many reasons for the formation of this phenomenon.

KUKA robots are used for outbreak detection KUKA robots are used for outbreak detection

According to the information recently released by China's National Health Commission, as of May 19, the country has announced that 449.511 million doses of new crown vaccines have been administered, of which more than 100 million doses have been administered in the last eight days. With the change of the global epidemic situation, although the virus is constantly mutating, it has not yet completely escaped the role of vaccines.

CATEGORIES BYPASS
Customer Service Center

Online Consultation:QQ


ContactContact

Contact: Manager Huang

Contact QQ: 3271883383

Contact number: 13522565663


Scan the code to add WeChat (please save the picture first on the mobile phone)

working hoursworking hours

Weekdays: 9:00-17:00

Holidays: Only emergencies are handled

Contact us

Contact us

Contact number QQ consultation
QQ consultation

3271883383

Company address
Back to top