Installation of industrial robots – KUKA robots

Create Date: 2024-8-30 12:03:23|Source: KUKA

In the field of industrial production, the device of industrial robot is very important, if the device presents a problem, it will not only affect the performance of robot equipment, but also lead to the reduction of the service life of industrial robots, and will affect the safety of industrial production, and damage to the economic benefits of enterprises, so it is very important to do a good job in the device operation of industrial robots, combined with previous operating experience, in the process of industrial robot devices, it is necessary to do a good job in the following three aspects.

                            Installation of industrial robots – KUKA robots

1. Understand the procedure

Before the actual installation, the relevant personnel should have a specific understanding of the operating procedures of the industrial robot, and be clear about the connection between the parts and components of the industrial robot equipment, and the scale and position between the equipment should be exactly the same, and which can appropriately relax the standards. In addition, it is necessary to conduct a detailed analysis of the device drawings, grasp the operating principle and functional structure of the industrial robot, and find appropriate tools and equipment before the device, so as to better provide guarantee for the function of the device.

2. Make a plan

Combined with the actual production situation on the site, a specific plan should be drawn up for each industrial robot device, and relevant emergency plans should be drawn up to ensure that all aspects are comprehensive and targeted. In addition, before the actual installation, relevant work instructions should also be formulated, and the specific operating procedures, operation points, required personnel and self-inspection requirements should be clear in the work instructions, and then provide a consistent basis for the safety of industrial robot equipment. Multiple copies of the work instructions, such as the production company, the supervision part, the device commissioning part, the on-site device part, etc., should be kept separately, so that if the relevant problems are presented in the future, the talents can be traced back and avoid the problems of each other.

3. Cognitive execution

It mainly refers to the specific review of each installation of an industrial robot equipment, such as the installation of the connected equipment of the industrial robot, the need to carry out a specific review of the critical scale of the parts that have been installed, so as to avoid the problem of overall rework due to scale changes.

After all the industrial robot equipment is installed, a comprehensive self-inspection should be carried out, and the problems should be found in time before the later commissioning, and targeted treatment, and then reach the high standard of one-time qualification of the device inspection, and then provide guarantee for the progress of the industrial robot equipment to ensure that the industrial robot equipment and equipment can be completed within the specified construction period.

More on that
The KUKA robot performs the arc welding command operation The KUKA robot performs the arc welding command operation

In Arc StartV, the A directive is a condition for arc welding, i.e., after the tp program directly specifies the welding current and voltage or the delivery speed of the metal wire, the end welding is started. According to the setting of the equipment variety, imitation input and output ...

Precautions for commissioning and maintenance of palletizing robots – KUKA Precautions for commissioning and maintenance of palletizing robots – KUKA

The palletizing robot is a device that actively stacks the bags, cartons or other packaging materials conveyed by the conveyor according to the working method required by the customer's process, and conveys the stacked materials. Here are a few things to keep in mind when it is being debugged and repaired: ...

Battery replacement in the KUKA robot body and controller Battery replacement in the KUKA robot body and controller

The data stored in the robot arm is important to protect the encoder pulse values for each axis in the robot. This will manipulate the robot's orientation data. If the battery in the manipulator fails, then if the main power supply is lost, the manipulator needs to be re-operated. Annual Replacement (for ...

Maintenance work on KUKA robots Maintenance work on KUKA robots

KUKA robot maintenance is to ensure the normal operation of KUKA robots to the greatest extent, and the maintenance of KUKA KUKA robots generally needs to be carried out after 10,000 hours of operation, especially for KUKA robots that work at the load limit or operating limit for a long time under harsh conditions.

Robot welding speed – KUKA robots Robot welding speed – KUKA robots

1. Robot welding can improve the output power The six-axis welding robot has a short response time and fast action. The welding speed is 50-160cm/min, which is much higher than that of manual welding (40-60cm/min). The bot does not abort during operation. As long as external hydroelectric conditions are ensured, ...

What does the KUKA robot preventive maintenance cover? What does the KUKA robot preventive maintenance cover?

What does a routine preventive maintenance check for a KUKA robot consist of? back-up controller memory; Monitor the robot at regular intervals, inspect the robot, wires and cables; check the brake equipment; Check the machine ...

KUKA Robot General Safety Measures KUKA Robot General Safety Measures

KUKA Robotics only promises to use industrial robots in accordance with regulations and in a safety-conscious manner when the machine is equipped with perfect skills. Improper use can result in injury and property damage. Not all types of bots have this option. Letters about specific types of bots ...

How KUKA Robot BCO works How KUKA Robot BCO works

1. The initial operation of the KUKA robot is called BCO operation. BCO is an abbreviation for B lock coincidence. Coincidence means "consistency" and "convergence of time/space events". BCO operations are to be carried out in the following cases.

The KUKA robot restart program shows a problem The KUKA robot restart program shows a problem

There is no program display when the KUKA robot is restarted, that is, the gun cleaning program has been deleted, maybe the name of the program has been changed. Of course, KUKA robots have programs, KUKA robot bodies, handheld teaching programmers and control cabinets, there are all kinds of circuit boards, circuit boards are required to program ...

KUKA robot instructions and syntax KUKA robot instructions and syntax

Instructions and grammar · Program structure o Modules § Global § Local § Modules without data lists o Function blocks § Global § Local § With parameter passing § The function blocks of the system preset ...

Structural features of industrial robots - KUKA robots Structural features of industrial robots - KUKA robots

1. Programming More advanced automation is sensitive from the start. Industrial robots can be programmed to respond to changes in the environment. As a result, they can play a very good role in small groups, in different parts of the production system, in equal and efficient processes. ...

KUKA robot dresspack selection concept KUKA robot dresspack selection concept

In recent years, KUKA has made a qualitative leap forward in robot skills, and the robot's performance has been continuously improved and adaptable. In order to ensure the service life of KUKA robots, KUKA robot dresspacks are widely used. With the continuous improvement of the robot system, the variety of pipeline packs is also increasing.

How to quickly stop the operation of a KUKA robot in an emergency How to quickly stop the operation of a KUKA robot in an emergency

During the operation of the robot, if there is an urgent accident, the operation of the machine can be forcibly interrupted by stopping the equipment by external vertical stopping. 1. External emergency stop In case of emergency, how to quickly and accurately shut down the warehouse ...

KUKA robot motor knowledge KUKA robot motor knowledge

1. The current of the single-phase transformer at no load is different from the main magnetic flux, and there is a phase parity aFe, due to the presence of iron current. The no-load current is a spire waveform due to the large third harmonic in it. 2. The flow in the armature winding of the DC motor is also the communication current. But its ...

KUKA robot after-sales service KUKA robot after-sales service

KUKA after-sales service provides complete after-sales maintenance, cycle maintenance and spare parts sales services for industrial robots.   Services provided by the KUKA service network. Experts are on call in more than 30 countries day and night to quickly reach your robots, work orders and ...

Precautions for the selection parameters of industrial robots - KUKA robots Precautions for the selection parameters of industrial robots - KUKA robots

1. Number of robot axes. The number of axes of the robot affects the degree of freedom, if it is for a simple straight to go occasion, for example, a belt line from one side to the other, choose a simple four-axis robot; If the robot does not have much room to move, but the demand machine ...

Procedure for KUKA to repair and replace the main unit of the control system Procedure for KUKA to repair and replace the main unit of the control system

KUKA robot repair and replacement of the main engine of the control system: It is necessary to keep the KUKA robot control system shut down and power-off, and do a good job of relevant inspection and personal maintenance operations, in case the robot is restarted without permission, and the robot's buffer must be sure to ...

Advantages of KUKA Robot's standard four-axis industrial handling robot Advantages of KUKA Robot's standard four-axis industrial handling robot

Advantage: Reasonable mechanical structure and compact design 4 degrees of freedom AC servo motors Absolute position encoders All shafts are equipped with holding brakes Specific loads and inertia are designed to optimize speed and motion characteristics The arm of the ...

KUKA'S KR 3 AGILUS Fast Food Robot KUKA'S KR 3 AGILUS Fast Food Robot

KUKA's KR 3 AGILUS conquers Brazil's Bionicook to serve snacks, drinks and desserts in the world's first fully active fast food vending machine. Industrial enterprises have long begun to adopt the ...

Introduction to tool payload data – KUKA robots Introduction to tool payload data – KUKA robots

In industrial robots, what is stuff load data? Stuff load data refers to the load of everything that is mounted on the flange of the robot. It is additionally mounted on the robot and moved by the robot along with the mass. Need to lose ...

CATEGORIES BYPASS
Customer Service Center

Online Consultation:QQ


ContactContact

Contact: Manager Huang

Contact QQ: 3271883383

Contact number: 13522565663


Scan the code to add WeChat (please save the picture first on the mobile phone)

working hoursworking hours

Weekdays: 9:00-17:00

Holidays: Only emergencies are handled

Contact us

Contact us

Contact number QQ consultation
QQ consultation

3271883383

Company address
Back to top