1. Check the surrounding situation - carefully check the ventilation and lighting of the inverter and the surrounding environment. It is necessary to ensure that the ventilation equipment is functioning properly and that the lighting equipment is in working order.
2. Check the internal cables - open the inverter cabinet door to check whether the internal cables are damaged, whether the connection between the cables is correct and reliable, whether all grounding wires are firm and reliable, and whether there is rust at the grounding point. All bolts and nuts in the inverter should be tightened every six months to ensure a reliable connection.
3. Check the tightness of all electrical connections - check whether all circuits in the inverter have abnormal discharge traces, whether there are strange smells, discoloration, cracks, breakage and other phenomena. Check that the fibers of all power units are not damaged or loose, and that each one is plugged in tightly.
4. Measure the insulation of the inverter - after each shutdown to resume operation for a long time, the 2500V megohmmeter should be used to test the insulation of the main circuit of the inverter and the bypass cabinet to ensure that the test can be started only after passing the test.
5. Carefully check the remains - after each maintenance of the inverter, carefully check whether there are missing screws, spring sheets, bolts and metal wires inside and outside the inverter cabinet to prevent small metal objects from being sucked into the inverter after the fan is started, resulting in a short circuit accident of the inverter.
6. Thorough cleaning - use a vacuum cleaner or air compressor with a plastic nozzle to thoroughly clean the inside and outside of the inverter and the power distribution room to ensure that there is no excessive dust around the equipment and ensure that the operating environment is clean.
7. Pre-start inspection - especially after major changes to the electrical circuit, check whether all electrical connections are correct and firm to prevent the occurrence of "reverse power transmission" accidents.
|
More on that
|
Megmeet PLC – How does PLC communicate with computers?
1. In this computer, right-click, manage, check to find the device manager, plug in the USB-PPI cable (one end is connected to the computer, the other end is connected to the PLC), the computer device manager will pop up the port USB-SERLAL CH304 (com3), the number in parentheses may change, indicating that you have found the cable. This...
|
|
Megmeet drives – the design essentials of the drive control cabinet
The inverter should be installed inside the control cabinet, and the design of the control cabinet should pay attention to the following issues:
1. Wiring specification of inverter
The signal line and the power line must be separated: When using an analog signal to remotely control the inverter, in order to reduce the interference of the analog signal to equipment such as the inverter, ...
|
|
The cause and treatment method of the fault code Eroc1 of Megmeet inverter
1. Overcurrent fault of inverter
Fault Code: OCF.
(1) Fault name: inverter overcurrent fault
(2) The cause of the failure: the motor nameplate data input is incorrect: the load dragged by the motor is too heavy: the machinery is stuck; Motor stalled.
(3) ...
|
|
Features of Megmeet CO2/MAG all-digital heavy-duty welder
1. The arc is stable in the field of full current, the spatter is small, and the same welding machine is not only suitable for small current base welding, but also suitable for high current and high deposition rate work
2. Arc concentration and strong penetration. With the same penetration depth, the heat input is reduced by more than 20% compared with other gas shielded welding machines, and the thermal deformation ...
|
|
Megmeet PLC - the characteristics of the working process of PLC
1. The PLC adopts the mode of centralized sampling and centralized output, which can reduce the influence of external interference.
2. The working process of PLC is the process of cyclic scanning. The duration of the cyclic scan depends on the speed of execution of the instructions and the length of the user's program.
3. Output to input ...
|
|
Megmeet PLC – the application of PLC
Open-loop control
Open-loop control of switching quantity is the most basic control function of PLC. The instruction system of PLC has powerful logic operation ability, and it is easy to realize various logic control methods such as timing, counting, and sequential (stepping). Most PLCs are used to replace traditional relay contactors...
|
|
Maintenance inspection of Megmeet inverters
1. The Megmeet rectifier module is damaged
It is usually caused by grid voltage or internal short circuit. In the case of sweeping the internal short circuit, the rectifier bridge is replaced. When dealing with faults on site, we should focus on checking the status of the user's power grid.
Such as the power grid voltage, whether there is an electric welding machine, etc.
|
|
Megmeet Inverter - Precautions for the Use of Inverter (11-21)
11. For the occasion when the inverter drives the ordinary motor for constant torque operation, long-term low-speed operation should be avoided as much as possible, otherwise the heat dissipation effect of the motor will become worse and the heating will be serious. If long-term operation at low speed constant torque is required, a variable frequency motor must be selected.
12. For the promotion of negative ...
|
|
Megmeet welding machine - the working principle of the spot welding machine and its advantages and disadvantages are introduced
Safety operation procedures for spot welding machines:
1. Before operation, the oil stain of the upper and lower electrodes should be removed. After power-on, the body shell should be free of leakage.
2. Before starting, the steering switch of the control line and the small switch of welding current should be connected, the number of poles should be adjusted, and then the water source and gas source should be connected.
|
|
Megmeet drives – safety precautions for the installation of drives
When the inverter is installed and wired;
Note: When more than two inverters are installed in the same cabinet, please pay attention to the installation position and spacing to ensure the heat dissipation effect.
Dangerous:
1. It should be operated by professional electrical engineering personnel, otherwise there is a risk of electric shock.
2. Please make sure before wiring...
|
|
Megmeet inverter - inverter braking mode and advantages and disadvantages introduction
What are the braking methods of the inverter? Generally speaking, braking refers to the technical measures taken during the operation of the motor due to fault protection or man-made active shutdown, and the commonly used inverter braking methods include energy consumption braking, feedback braking, DC braking and DC feedback braking. ...
|
|
Hollysys edge intelligent controller and edge intelligent all-in-one machine launched new products
Transportation power, urban rail responsibility. With the vigorous development of emerging technologies such as 5G, cloud computing, big data, and artificial intelligence, more innovative technologies are accelerating the empowerment of urban rail transit, and smart urban rail is ushering in a "golden age" of development. As a deep cultivator in the field of smart urban rail, Hollysys adheres to technological innovation.
|
|
Megmeet drives – what are the basic requirements for regular replacement of drive components?
1. It is necessary to figure out the basic parameters and shape of the device that needs to be replaced. The basic parameters include the rated operating current, the capacitance of the capacitor, the resistance value of the resistor, the value of the GTR Darlington device (current amplification factor), the switching characteristics of the IGBT (including IPM) device, and the saturation voltage ...
|
|
Megmeet PLC - What places should be avoided when installing PLC control?
(1) The ambient temperature exceeds the range of 0-50 °C;
(2) The relative humidity exceeds 85% or there is dew condensation (caused by sudden temperature changes or other factors);
(3) direct sunlight;
(4) There are corrosive and flammable gases, such as hydrogen chloride, ...
|
|
Megmeet Inverter - Summary of Common Faults of High Voltage Inverter (21-32)
21。 The unit is overheating
The radiator in the unit is equipped with a temperature switch (normally closed point), and when the temperature exceeds 85°C, the normally closed point of the temperature relay is disconnected, and the unit is overheated and faulty.
Check whether the cabinet top fan is working properly, whether the unit cabinet fan switch is tripped, and whether the filter screen is blocked.
|
|
Megmeet PLC - What is the difference between PLC and MCU?
1. PLC is a relatively mature control system composed of single-chip microcomputer, which is the product of a mature and stable single-chip microcomputer application system that has been debugged. It is highly versatile.
2. The single-chip microcomputer can form a variety of application systems, and the application range is wider. In the case of a single "microcontroller", it ...
|
|
Megmeet drive common fault repair methods
When the oscilloscope looks at the current monitoring output of the driver, it is all noisy and cannot be read
Cause: The current monitoring output is not blocked from the AC power supply (transformer).
Solution: You can use a DC voltmeter to detect and investigate.
Servo motor high-speed rotation ...
|
|
Maintenance method of Megmeet PLC
1. The electrical control cabinet installed with PLC should have a clean and dry environment. Moisture-absorbing dry materials should be placed inside, and the splashing of coolant and oil mist should be prevented.
2. Regardless of the system working or shutdown, the electrical cabinet door should always be closed, and the electrical components should be kept in a good state.
|
|
Megmeet PLC - Comparison of the advantages of PLC and DDC in building automation systems
1. Application field: The initial design goal of PLC is only to replace complex relay circuits, and DDC is originally only used in industrial automation instruments: PLC emphasizes versatility, DDC emphasizes specificity: PLC is used in the field of industrial control, and DDC is used in professional building systems.
2. Structural differences ...
|
|
Megmeet inverter - what are the main aspects of the development of inverter in the future?
1. Intelligent network
The intelligent inverter does not need to set a lot of parameters when it is used, and it has the function of fault self-diagnosis, which has high stability, high reliability and practicability. The Internet can be used to realize the linkage of multiple inverters, and even the inverter complex in the factory.
|
|