Preparation steps for the installation of PLC - Mitsubishi

Create Date: 2024-8-30 12:03:23|Source: Mitsubishi Electric/Mitsubishi Electric

Installation and commissioning of the system

Reasonable arrangement of system installation and commissioning procedures is the key to ensure that the installation and commissioning mission is completed efficiently and with high quality.

1. Preliminary skill preparation

The more abundant the skills to prepare for the commissioning of the system device, the smoother the installation and commissioning will be. The Pre-Skills Preparation assignment consists of the following:

(1) Understand the PC random skill materials and original materials, deepen the understanding of its functions, functions and various operation requirements, and formulate operating procedures.

(2) Deepen the understanding of planning materials, have a comprehensive understanding of the system process flow, especially the control requirements of the process for each production equipment, and on this basis, make the process flow according to the subsystem. Cheng interlocking diagram, system function diagram, system operation logic block diagram, which will help to have a deep understanding of the system operation logic, is an important part of the early skill preparation.

(3) Understand the function, planning and device status of each process equipment, especially the control and power wiring diagram of each equipment, and compare it with the real thing, so as to find faults and correct them in time.

(4) On the basis of a comprehensive understanding of the planning plan and PC skill materials, list the PC input and output point number list (including the list of internal coils, the location of I/O, the corresponding equipment and the function of each I/O point).

(5) Study the program of planning and supply, make a sequence diagram of some input and output points with complex logic, and some logical errors in the plan can be found when making a sequence diagram.

(6) The molecular system is prepared and debugged, and then summarized into the whole system debugging plan on the basis of collective discussion.

                               Preparation steps for the installation of PLC - Mitsubishi

2. PLC commodity inspection

Commodity inspection should be carried out together with both sides of A and B, and the type, quantity, and standard of equipment and spare parts, spare parts, technical materials, accessories, etc., should be recognized, and whether their functions are intact will be verified in the laboratory and on-site commissioning. As a result of the commodity inspection, both sides should sign the exchange list.

3. Laboratory debugging

(1) The laboratory device of PLC is registered to make metal brackets, the input and output modules of each operation station are fixed on it, and each station is connected with the host, programmer, printer, etc. with coaxial cable according to the device summary, check that the wiring is correct, and the power supply level is consistent with the PLC voltage selection, send power according to the start-up program, load the system configuration belt, recognize the system configuration, load the programmer loading belt, programming belt, etc., and register the system according to the operating procedures, and then carry out various operation experiments.

(2) Type in the job procedure

(3) Imitate I/O input and output, check the correction program, the intention of this process is to verify the correctness of the input operating program, whether the interlocking relationship of the process equipment expressed by the logic of the program is consistent with the planned process control requirements, and whether the program is dredged. If it does not conform or cannot be operated to complete the whole process, it means that the procedure is wrong and should be corrected. In this process, the understanding of the program will gradually be deepened, ready for on-site commissioning, and at the same time, it will be possible to identify unreasonable and imperfect parts of the program for further optimization.

There are two debugging methods: (1) imitation method: make a debugging board according to the plan, imitate the input node with the toggle switch, imitate the relay and contactor of the production process equipment with a small relay, and the auxiliary contact imitates the return signal node when the equipment is running. The advantage is that it has the authenticity of imitation, and it can reflect whether logical malfunctions can occur when the mechanical contacts in the field and the electronic contacts in the PLC are connected to each other, which have large switching speeds. The disadvantage is that you need to add debugging costs and part of the debugging workload. (2) Forced method: The PLC is used to force the mechanical contacts (switches) involved in the program to make them "on" and "off" by forcing the program to operate. Its advantages are that the amount of debugging work is small, it is simple, and there is no additional cost. The disadvantage is that the logic verification is not comprehensive, and the artificial imitation of the on-site node "on" and "off" will form the program operation can not be continuous, and can only be carried out in sections.

According to our experience of on-site commissioning, the imitation method is adopted for some important field nodes, and the forced method is used for the rest, so as to complement each other's strengths.

In the logic verification stage, it is necessary to focus on filling in the debugging operation log day by day, including debugging personnel, time, debugging content, correction records, faults and processing, handover and acceptance signatures, so as to establish a debugging operation responsibility system and leave first-hand materials for debugging. Amendments to the planning process should be noted on the planning plan, and the opinions of planners should be sought in a timely manner to accurately reflect the planning requirements.

4. On-site installation and viewing of PLC

After the laboratory commissioning is completed, the equipment will be moved to the field installation when the conditions are ripe. The device should meet the requirements, the plug-in insertion should be reliable, and fastened with bolts; Communication cables should be of the same type, can not be mixed, if necessary, use instruments to check the line signal attenuation, and its attenuation value does not exceed the indicators proposed by technical materials; Measure the insulation resistance of the host, I/O cabinet, connection cable, etc.; Grounding resistance for measuring the special grounding of the system; Check the power supply, etc., and make a record, and wait until all items are in line with the requirements before turning on the power.

More on that
Mitsubishi inverter fault judgment method Mitsubishi inverter fault judgment method

1. UVT problem UVT is an under-voltage problem, and I believe that many customers will still encounter such problems in use. The common undervoltage detection point of Mitsubishi inverter is the voltage on the DC bus side, and a low voltage value is sampled after the voltage division of the large resistance resistor, which is compared with the standard voltage value ...

MITSUBISHI MELFA ASSISTA COLLABORATIVE ROBOT MITSUBISHI MELFA ASSISTA COLLABORATIVE ROBOT

With the spread of industrial robots in the production site, more and more on-site issues need to be solved, such as the need for more robot programming engineers, which increases the human cost; The teaching is complicated, which increases a lot of non-production time; Set up guardrails to increase the cost of space and installations; Robot...

Mitsubishi servo motor is now commonly used Mitsubishi servo motor is now commonly used

Torque control: Torque control is based on external simulation imitation typing or direct address assignment to set the output torque of the motor shaft. For example, 10V matches 5Nm. When the external simulation simulation is set to 5V, the output of the motor shaft is 2.5Nm. If the load of the motor shaft is less than 2.5Nm, then when ...

The difference between Mitsubishi PLC and Siemens PLC The difference between Mitsubishi PLC and Siemens PLC

The programming philosophy is different Mitsubishi PLC is a Japanese brand, programming is intuitive and easy to understand, and it will be easier to learn, while Siemens PLC is a Germany brand, the instructions are more general, it is more difficult to learn, but there are fewer instructions, and Mitsubishi has more instructions, so learn Mitsubishi and learn Siemens' week ...

Introduction to Mitsubishi PLC Modbus communication and address allocation Introduction to Mitsubishi PLC Modbus communication and address allocation

When using Modbus communication in Mitsubishi PLCs, it is necessary to understand the address allocation of different register types. The following are the common types of Mitsubishi PLC Modbus addresses and their corresponding functions: 1. Coil Register: ...

Mitsubishi FR-A840 series inverter is coming "strong". Mitsubishi FR-A840 series inverter is coming "strong".

Mitsubishi Electric Automation Corporation has launched the A800 Series Integrated Inverter Drive (VFD) for fast, reliable, easy-to-use, and easy integration and installation for occupational demand drives. The A800 series variable frequency drive combines traditional induction and permanent magnet vehicles into a single solution that supplies ...

Low-voltage electrical faults and maintenance methods - Mitsubishi Low-voltage electrical faults and maintenance methods - Mitsubishi

In the process of operation, low-voltage electrical appliances will present problems due to improper use or long-term operation of aging components, and there are many kinds of problems, and the common problems are analyzed and dealt with. 1. Contact problems and repairs The contact is the primary component of the low-voltage switching coupon, ...

Performance comparison of Mitsubishi servo motors Performance comparison of Mitsubishi servo motors

First, the control accuracy is different The step angle of the two-phase hybrid Mitsubishi servo motor is generally 1.8 ° and 0.9 °, and the step angle of the five-phase hybrid Mitsubishi servo motor is generally 0.72 ° and 0.36 °. Mitsubishi servo motors are also smaller in some functions according to the segmentation. Such as Sanyo ...

Features of Mitsubishi PLC commonly used models Features of Mitsubishi PLC commonly used models

FX Series PLC: FX3G PLC has a built-in large-capacity program memory, 32K steps, and the basic instruction processing speed can reach 0.21μs in specification mode. In the meantime, the FX series 5U is suitable for any industry, and is used by small and medium-sized enterprises. For example, this year's very popular mask machine is suitable for FX5U, and he can ...

Mitsubishi drive functions and functions Mitsubishi drive functions and functions

1. Control the start, stop, speed and so on of the servo motor; 2. Carry out various maintenance on the motor (overload, short circuit, undervoltage, etc.) 3. React to external signals and control servo motors (position, speed, torque) through internal PID conditioning; ...

Mitsubishi drive fault codes Mitsubishi drive fault codes

1. If the problem code E.OC1 is displayed on the screen of the Mitsubishi inverter, it means that the overcurrent may speed up the operation when the inverter is accelerating. We need to check whether the output of the inverter is short-circuited and whether the main power supply is operating normally; ...

Characteristics of servos and advantages of Mitsubishi servos Characteristics of servos and advantages of Mitsubishi servos

The servo system is an automatic control system that enables the output of the object's orientation, direction, and state to change with the arbitrary change of the input quantity (or given value). In the automatic control system, the system that can echo the control signal with a certain degree of accuracy is called the follow-up system, also known as the servo system.

Functional characteristics of Mitsubishi's various series of servo motors Functional characteristics of Mitsubishi's various series of servo motors

Mitsubishi servo motor system series: MR-J2S series, MR-J3 series, MR-ES series, MR-E series. Mitsubishi servo motor MR-J2S series 1. The product also has RS-232 and RS-422 serial communication functions, which can be used by a personal computer equipped with servo setting software.

Pay attention to the wiring of the Mitsubishi PLCI/O terminal Pay attention to the wiring of the Mitsubishi PLCI/O terminal

1. Enter the wiring (1) The input wiring should generally not exceed 30 meters. However, if the environmental disturbance is small and the voltage drop is not large, the input wiring can be appropriately longer. (2) The input/output lines cannot be separated by the same cable, and the input/output lines should be separated. (3) As far as possible, choose normally open ...

Differences in the output form of Mitsubishi PLC Differences in the output form of Mitsubishi PLC

Generally, there are three types of Mitsubishi PLC output circuit methods, namely: relay output type, transistor output type and thyristor output type. So what are the characteristics of each of them? First, the relay output circuit Use of relays ...

Mitsubishi FX3u interrupts the location command Mitsubishi FX3u interrupts the location command

The main effect of aborting the positioning instruction is that in some machine tools, when we give the abort signal and can walk to the distance we set, for example, if the mechanical structure needs to use the sensor to determine the position to go, you can use the abort positioning instruction to do, when the induction gives the abort.

Mitsubishi PLC Programming FAQs Mitsubishi PLC Programming FAQs

1. Can the PLC of FX1N be extended to connect with FX2N's input and output modules, positioning modules, analog modules, etc.? The PLC of the FX1N is fully capable of expanding the expansion modules connected to the FX2N. Such as FX2N-16EX, FX2N-16EYR, FX2N-4A...

Mitsubishi PLC programming cable communication port setting method Mitsubishi PLC programming cable communication port setting method

1. Plug the programming cable into the USB port of the computer. 2. On the desktop, place the mouse on the "My Computer" icon, and then right-click. 3. In the pop-up menu, select "Device Manager". ...

Mitsubishi PLC encryption process Mitsubishi PLC encryption process

The encryption process is as follows: ** Open the serial port for the first time [00000000] IOCTL_SERIAL_SET_BAUD_RATE Baud Rate: 9600 (Set baud rate here) [00000000] IOCTL_SERIAL_SET_LIN ...

OC troubleshooting method reported during inverter operation OC troubleshooting method reported during inverter operation

1. For the test of the power output capacity of the driving circuit, to detect the pulse terminal signal such as GU\EU, it is not possible to have voltage (or pulse waveform) alone, and the current output capacity should be detected, and then admit whether it is normal; 2. Admit the defects of the current transformer. My solution is to use the ...

CATEGORIES BYPASS
Customer Service Center

Online Consultation:QQ


ContactContact

Contact: Manager Huang

Contact QQ: 3271883383

Contact number: 13522565663


Scan the code to add WeChat (please save the picture first on the mobile phone)

working hoursworking hours

Weekdays: 9:00-17:00

Holidays: Only emergencies are handled

Contact us

Contact us

Contact number QQ consultation
QQ consultation

3271883383

Company address
Back to top