Common brand inverter modification power method - Senlan inverter

Create Date: 2024-8-30 12:03:23|Source: Hope Sunland

What are the advantages of inverter power correction? Many brands of inverter power boards, driver boards, and motherboards can be universal, as long as the type, volume, and hardware are the same, and the desired power and voltage value can be obtained by correcting the manufacturer's parameters.

                              Common brand inverter modification power method - Senlan inverter

1. Yaskawa inverter G5-G7 power correction

Enter the menu, A01=4, and then return to 02-04, which is the power data, and the factory voltage of rehabilitation has also changed after the change.

2. Schneider inverter power correction

After the Schneider inverter replaces the motherboard, it will alarm the CFF when it is powered on, and then press the ENT button 3 times in succession to recover and leave the factory, and the power and voltage will be automatically matched.

3. Siemens 420-430-440 inverter power correction

After changing the motherboard, the power-on appears normal, but many parameters are gone, at this time, enter the No. 3 menu, change the value inside to 3 and then confirm, find the P0201 parameter, and then change the value inside to 0 After the power is off and does not appear, it is powered on again, you will find that the display is displayed ---- stay for about 5 seconds to recover normally. At this time, you will find that all the parameters are there, and the power voltage is completely matched to the machine.

4. Emerson inverter EV2000 power correction

Enter the menu, find FU-000 and correct the value inside to FA58, and then change the code in FUW04, 11=7.5KW12=11KW13=15KW21=90KW

5. Delta's inverter power correction method

Enter in the parameter 00-07 (old variety 57522, new 33582), and then find the 00-02 parameter and change it to 2 to show err, and then change the value in 00-00 to correspond to the power code on the clarification book.

6: ABB inverter ACS800RDCU-02C board power parameter correction method

Enter 9903 and change to YES to enter 1603 to 564 to enter 11206 to pick XXNONE

Then power off and then power on, enter 1603 to change to 564, enter 11206 to select the required power (such as 170-3), initialize the parameters, power off and then power on, the above method is suitable for the version alias 7200 before all the RDCU boards with different power are corrected to each other.

RDCU power change process for 7200 and later variety:

Enter 9903 to change to YES, enter 1603 to change to 564, enter 11221 to select the required power (such as 170-3), enter 9903 to change to YES, power off and power on.

Note that 11219 to 11223 are different power levels, please note that for the normal use of ABB inverters, please do not operate and correct them casually, otherwise it will lead to the loss of normal operating parameters.

7: How to correct the power of Fujifilm G11 motherboard?

Double-key operation STOP+RESET stop key plus key or down key, press the PRG key first, enter the menu, and then press the >> and PRG keys together to enter the U parameter group, find U50, so that you can correct the power you want. The replacement of the driver board with the motherboard

(1) 7.5G11 - 18.5G11 power level series, the capacity of the P-type inverter and the capacity of the G-type inverter with a small capacity can be exchanged;

(2) When replacing the motherboard of E-type inverter with different power, first enter the F00 function code, press and hold the Stop, Run and Pro keys together to enter the U parameter (THR and CM terminals must be short-circuited and FWD and CM are disconnected), and select the main control program parameter setting with the same capacity as the main body of the inverter; Secondly, the parameters of F01-F06 should also be revised or recognized as required, and the process is the same as that of F00; When the U-parameter is corrected, be sure to re-fix the factory settings to save the corrected U-parameter.

(3) G/P motherboards of different capacities can be exchanged within a certain capacity range (more than 30KW is the same standard scale), and the C parameters, processes, and processes in the correction master control program are very different from those of the E-type machine.

8: Fujifilm P9/G9 correction power, type, voltage level method

Press the reset key + PRG key, when the C parameter appears, press the up arrow key or the down arrow key to find C08 = capacity or >> key + PRG key U00, first correct 131 = 0.4G132 = 0.75G...... 136=5.5G/7.5P…… 141=22G/30P… Press the data key to store after the correction and use the >> key + up arrow key to correct C05=G/P type G=0, P=1 after the correction and press the data key to store

9: PI2000 refresh the setting method

(1) Set C01 to 222 to enter P14

(2) Set P14 to 3 pairs of CPU refresh, then PI2000 is displayed, C01 is set to 222 to enter P14 parameter setting, P14 is set to 2, P01 is set to model G, F, P02 is set to inverter voltage 380V, P03 is set to inverter rated current, P04 set voltage is displayed, P05 set current is displayed.

10: Delta's A-series inverter

The keyboard of the correction parameters is determined, and most of the parameters cannot be corrected, and the clarification book does not clearly explain how to unlock the keypad lock, press MODE and RESET together to display P256 (P256 does not clarify what it means in the clarification book), press ENTER to correct this parameter, change 00 to 01, and press ENTER to exit to correct all parameters.

More on that
Selection and capacity matching of inverter - Senlan Selection and capacity matching of inverter - Senlan

1. Select the inverter according to the load characteristics Second, when selecting the inverter, the actual motor current value should be used as the basis for the selection of the inverter, and the extra power of the motor can only be used as a reference. Secondly, it should be fully considered that the output of the inverter contains higher harmonics, which will form the power factor of the motor.

Sunland inverters are designed for environmental requirements Sunland inverters are designed for environmental requirements

1. The ambient temperature ---- is generally "-10-+40°C"; Derating between 40 and 50°C, the additional output current must be reduced by 1% for every 1°C increase. If the ambient temperature is too high and the temperature changes greatly, the insulation of the inverter will be greatly reduced, which will affect the life of the inverter. ...

Inverter braking resistance connection method - Senlan inverter Inverter braking resistance connection method - Senlan inverter

If the drive has a built-in braking unit and additional braking resistors, it is important to pay attention to the correct wiring of the braking resistors. The braking resistor should be connected between the P terminal and the DB terminal, but not between the P terminal and the N terminal, otherwise the three-phase rectifier bridge will operate at full load when it is not running, resulting in the equipment can not be ...

The manufacturing standard of Sunland inverter cabinet The manufacturing standard of Sunland inverter cabinet

Planning specifications: The planning of inverter cabinets should conform to relevant national norms and industry norms, such as GB/T15576-2018 "Low-voltage Distribution Cabinet", GB7251.1-2017 "Low-voltage Complete Switchgear and Control Equipment", etc. Material specifications: The materials of the control cabinet should conform to the relevant codes and regulations.

Precautions for the selection of exhaust fan inverter - Senlan Precautions for the selection of exhaust fan inverter - Senlan

1. Whether it has perfect maintenance function There will be many problems in the production process of the equipment, and if you want to prevent accidents, the equipment must have a perfect maintenance function, so as to prevent the loss of the enterprise. Therefore, when buying an exhaust fan inverter, you need to understand the safety function of the equipment first.

Motor encoder and rotor pole phase zero alignment repair - Sunland Motor encoder and rotor pole phase zero alignment repair - Sunland

1. Phase alignment method of incremental encoder The alignment between the phase of the UVW electronic transmutation signal and the phase of the rotor pole, or the phase of the TV spot, of the incremental encoder with the signal exchange is as follows: 1) Use a DC power supply to pass the UV winding of the motor to less than the amount of ...

Sunland inverter overcurrent fault maintenance method Sunland inverter overcurrent fault maintenance method

When the inverter current is too large, exceeding the limit value of the inverter, the maintenance circuit will produce action, so that the inverter trips and stops, and the phenomenon of repairing such inverter can be divided into energized ...

Inverter maintenance method - hope sunland Inverter maintenance method - hope sunland

1. Look After taking over a faulty inverter, remove the inverter shell and clean it up, and carefully investigate the appearance, shape, and integrity of the relevant components on the circuit board with both eyes according to the type of inverter fault. This method is about charging resistors, filter electrolytic capacitors, IG ...

Practical installation precautions for frequency converters Practical installation precautions for frequency converters

When the line power supply exceeds the driver's kV-A rating by 10 times, add a line reactor. A 3% impedance line reactor should be used to reduce power line transient voltages caused by capacitor switching, line notching, DC bus overvoltage tripping, and inverter overcurrent and overvoltage conditions. Line...

I/O (Input/Output) Selection – Senland I/O (Input/Output) Selection – Senland

In the 90s of the 20th century, PLC has formed a variety of PLCs: micro, small, medium, large and giant. According to the number of I/O points, it can be divided into five types: micro PLC (32 I/O), small PLC (256 I/O), medium PLC (1024 I/O), large PLC (4.69 I/O), and giant PLC (8195 I/O). ...

The connection method of three-phase isolation transformer - Senland The connection method of three-phase isolation transformer - Senland

The three-phase barrier transformer adopts a three-phase double-winding structure, which has the characteristics of lightning protection and anti-disturbance. Each winding on the primary and secondary sides is divided into two coils, which are wound from two layers of metal foil insulated from each other. So there is capacitance C (capacitance barrier transformer) between the two coils. Then, being able to ...

What should I do if I forget the password? What should I do if I forget the password?

With the passing of time, the inverter has now fully penetrated into the work of major industries. In our daily use, we will inevitably encounter all kinds of problems. For example, I forgot the cipher code of the inverter. See here ...

Energy-saving operation method of air compressor inverter - Senland Energy-saving operation method of air compressor inverter - Senland

At present, the domestic air compressor market takes the goal of energy saving, environmental protection and cost reduction as the primary demand, and the new products developed are very popular. However, economically speaking, it cannot completely replace the conventional screw air compressor with large area and large capacity in use. Therefore, the use of inverter technology to ...

Hope the advantages of Sunland inverter soft start Hope the advantages of Sunland inverter soft start

It is hoped that Sunland inverter and soft start is a first-class, reliable and reliable motor control system, which can meet the needs of various applications. The advantages of Hope Sunland inverter and soft start are: 1. **Sex: I hope that Sunland inverter and ...

Causes and treatment methods of inverter inverter module damage - Senlan Causes and treatment methods of inverter inverter module damage - Senlan

Most of the damage of the inverter module is due to the damage of the driving electric, which causes the two switching devices on one bridge arm to be turned on at the same time. Inverter inverter power module damage is a common problem in other inverter equipment such as vector inverter or energy-saving inverter.

A contactor is used between the inverter and the motor - Senlan inverter A contactor is used between the inverter and the motor - Senlan inverter

Whether a contactor is used between the inverter (VFD) and the motor depends on the specific situation. When the contactor is on and off when the motor is running, the operating overvoltage is easy to cause VFD damage. Therefore, whether to use the contactor, it must be based on the actual situation to make the correct ...

PLC control belt conveyor soft start method PLC control belt conveyor soft start method

Belt conveyor is a kind of continuous conveyor, which is one of the main types of fixed or escorted cranes. Belt conveyor is the use of friction to convey the dynamic, with belts, steel belts, steel fiber belts and chemical fiber belts as a kind of compliance with the transmission of materials and traction operations.

The harm of low temperature to the inverter - Senlan The harm of low temperature to the inverter - Senlan

Most VFDs are suitable for -10°C-50°C, and if the temperature is too low, the VFD will be affected. Precautions for low-temperature operation of VFD: 1. VFD should be operated in an environment above minus 10°C as much as possible, preferably indoors.

Motor starting mode - Senlan inverter Motor starting mode - Senlan inverter

The inverter is a motor control (speed regulation) device that uses the on-off effect of power semiconductor devices to convert the power frequency power supply to another frequency. Composition 1: 1. Rectifier unit: convert the communication electricity with fixed operating frequency into DC ...

I hope that Senlan will make a wonderful appearance at the 22nd (Shanghai) Industry Fair I hope that Senlan will make a wonderful appearance at the 22nd (Shanghai) Industry Fair

From September 15th to 19th, the 22nd China International Industry Fair was held at the National Convention and Exhibition Center (Shanghai). As the first national industrial exhibition held under the normalization of epidemic prevention and control this year, the theme of this expo is "Intelligence, Interconnection: Enabling the New Development of Industries".

CATEGORIES BYPASS
Customer Service Center

Online Consultation:QQ


ContactContact

Contact: Manager Huang

Contact QQ: 3271883383

Contact number: 13522565663


Scan the code to add WeChat (please save the picture first on the mobile phone)

working hoursworking hours

Weekdays: 9:00-17:00

Holidays: Only emergencies are handled

Contact us

Contact us

Contact number QQ consultation
QQ consultation

3271883383

Company address
Back to top