Schneider UPS power supply installation steps

Create Date: 2024-8-30 12:03:23|Source: Schneider/Schneider

UPS power supply is widely used in shopping malls, supermarkets, banks and other enterprises and institutions, the primary effect of the power supply is to provide continuous power supply for the unit in the state of power failure, so as to ensure the normal operation of the computer network system and other application systems, and effectively avoid data loss. Before using the power supply, how to use the UPS power supply device well? Trust in the UPS installation process plagues most engineering technicians. The following is a detailed explanation of the "UPS Power Supply Device Process Standard" from several aspects, such as device precautions, device process, and application precautions.

                              Schneider UPS power supply installation steps

1. Precautions for installation

The quality of UPS power supply devices directly affects the long-term operation of the UPS system in the future, especially the large and medium-sized UPS power supplies, so the large and medium-sized UPS power supplies should be standard in the process of planning to the device.

Generally speaking, the following elements should be considered in the installation of UPS power supply:

Grid conditions, load capacity, characteristics, operating environment, grounding conditions, wiring, switching capacity, etc.

1. The status of the power grid

First of all, it includes the scale of grid voltage fluctuations, the frequency of shutdown, etc., to determine the backup time of UPS uninterruptible power supply. If necessary, other protective measures can be added in front of the UPS power supply.

2. Use the environment

Temperature: 0°C-40°C;

Humidity: 10%-90%;

Dust: The surrounding environment of UPS power supply equipment should be kept clean, which can reduce the corrosion of harmful dust on the internal circuit of UPS;

Structure: When the UPS power supply is configured with a long delay, the battery may be heavier, and the load-bearing problem of the floor should be considered at this time;

Space size: It should be ensured that when the UPS uninterruptible power supply is maintained, the engineering personnel have a certain room to play.

3. Grounding condition

In order to ensure the stable and reliable operation of the computer system, avoid parasitic capacitive coupling disturbance, and protect the safety of equipment and personnel, it is necessary to have a good grounding system. In the grounding system, the grounding resistance is used to represent the quality of the grounding, and the general grounding resistance is less than 5Ω is ideal.

Second, the device process

First, it is necessary to clarify the operating environment before proceeding with the installation. When selecting the location of the device, it is best to be free of conductive impurities and equipped with air conditioning in a separate room, the operating environment should be clean and dry, and corresponding protective measures should be taken. At the same time, the air should be free of dust and free of corrosive gases. Of course, in the normal operation of the system, it is also necessary to maintain air circulation. Therefore, when carrying out the installation, the installation environment should meet the following conditions. The operating relative humidity does not condense and the operating temperature is in the range of 0 to 40 degrees Celsius.

Second, the cabinet should be unpacked and installed, and the damage should be checked at this time. When inspecting the packaging, it should be checked for damage, perhaps misfitting. If it is damaged, it should be replaced. And when unboxing, you should look at the model on the front door to match the model you ordered. In addition, it is necessary to record the model data so that it can be used in the future.

Third, you should also plan the specific path, and all the passages should be able to withstand the weight of the cabinet passing. Therefore, in this process, it is necessary to look at corridors, elevators, slopes, etc., to see if there are any dead corners. At the same time, once the power supply is in place, you should also check to see if there are other items in the cabinet.

Fourth, after the UPS battery system device is completed, the total voltage of the battery system and the open circuit voltage of the single battery should be carefully checked, and the positive and negative polarity should be carefully checked.

Fifth, when the battery is connected with the charging device or load, the circuit switch is located in the disconnection direction to ensure that the positive and negative electrodes are connected correctly.

Sixth, check the battery handling parameters in the switching power supply monitoring unit, and whether the relevant parameters are consistent with those in this manual.

3. Precautions for use

1. Do not use UPS uninterruptible power supply over the rated load;

2. The UPS power supply equipment is equipped with a large-capacity battery, and non-professionals should not open the case, otherwise there will be a risk of electric shock;

3. If the machine is smoking, please block the power supply quickly;

4. In case of fire around, please use a dry powder fire extinguisher, as there is a risk of electric shock when using a liquid fire extinguisher;

5. Please place the UPS mains input socket near the UPS uninterruptible power supply equipment, so that you can unplug the mains input plug and block the power supply in case of emergency.

The use of UPS power supply in the device is also a science, in the case of incorrect operation, it may form UPS power supply problems and even personal safety, so you should follow the guidance of relevant operators to use the device.

More on that
Schneider ATV71 inverter installation and modulation setting steps Schneider ATV71 inverter installation and modulation setting steps

1. Schneider inverter menu: (1) Simple start: Self-tuning: If the manifestation is "unfinished", then select "supplication self-tuning" until the manifestation is "finished", i.e., the completion of self-tuning; Acceleration moment: a ...

The role of Schneider thermal relays The role of Schneider thermal relays

The effect of the thermal relay is mainly used to carry out overload maintenance on the asynchronous motor, his operating principle is that after the overload current passes through the thermal element, the bimetal sheet is heated and bent to advance the action mechanism to drive the contact action, so as to disconnect the motor control circuit to complete the motor power-off thermal relay ...

Pay attention to the problem of false load connection method in inverter debugging - Schneider Pay attention to the problem of false load connection method in inverter debugging - Schneider

There are many novices who are not familiar with the fake load when repairing the inverter, and the repair of the inverter saves many of their modules with the false load, because the novice repairer generally does not know how to do this, and now the light is on to make it clear that the module is going to be broken. A false load is a resistor with a few hundred ohms ( ...

The difference between high voltage and low voltage of Schneider inverter The difference between high voltage and low voltage of Schneider inverter

1. What is the difference between high-voltage inverter and low-voltage inverter? Frequency converters can be broadly divided into two categories: high-voltage frequency converters and low-voltage frequency converters. In terms of use, the applicable objects are different, and the high-voltage motor is the same from the principle of speed regulation. From the topology ...

Instrumentation anti-interference measures - Schneider Instrumentation anti-interference measures - Schneider

The interference encountered by sensors and instruments in the field operation is varied, and the specific situation is analyzed on a case-by-case basis, and the principle of anti-interference is to adopt different methods for different disturbances. This flexible and mobile strategy is undoubtedly opposed to universality, and the way to deal with it is to choose a modular approach, except for ...

The difference between Schneider and Siemens PLC The difference between Schneider and Siemens PLC

There are three main differences, namely: different uses, different products, and different characteristics. 1. Different use cases: The programmable manipulator produced by Siemens in Germany is also widely used in China, and has been used in metallurgy, chemical industry, printing production lines and other fields.

Inverter power settings, waveform test issues Inverter power settings, waveform test issues

1. After the inverter is repaired, the power number demand is corrected, don't forget Generally, an inverter corresponds to a power number (also known as the number of horsepower), for example, a 75 kilowatt inverter is set under heavy load, and 100 kilowatts is set under light load. In this way, the customer will not use it to present ...

Schneider drives copy replication parameters Schneider drives copy replication parameters

1. Copy and copy through the Chinese panel. Older inverters, if they support Chinese panels, such as ATV71, ATV61, etc., support VW3A1101 panels, they can use the proprietary 'open/save as' parameter on the panel to copy and copy, and the newer ATV610, ATV630, ATV930, ...

How Schneider UPS properly configures the backup battery How Schneider UPS properly configures the backup battery

In order to ensure that the APCUPS power supply can continue to supply high-quality power to the computer even in the event of a power outage, it is important to equip the battery backup battery. When the load is not allowed to be powered, the UPS battery backup time in the communication room should be greater than the time from the mains power interruption to the rehabilitation or to the generator set is positive.

Dual-fan inverter selection - Schneider Dual-fan inverter selection - Schneider

1. Qualified after inspection When selecting a double fan inverter, it must be strictly checked for its quality. The first requirement is that it must have relevant certificates of qualified inspection, and some qualified materials must be taken out. This is the only way to ensure that this change ...

Schneider selection of different types of circuit breakers Schneider selection of different types of circuit breakers

Schneider miniature circuit breakers are: A9 (iC65, iDPN, etc.), M9 (C65, DPN, C120, NG125, etc.), E9, OSMC32N/OSMC65H, etc Schneider molded case circuit breakers are: NSX, NSE, EZD, NSC, large plastic case NS Schneider structural circuit breakers have ...

Inverter control motor speed method - Schneider Inverter control motor speed method - Schneider

1. Why can the rotation speed of the motor be changed freely? Motor rotation speed unit: r/min number of rotations per minute, can also be expressed as rpm. Example: 2-pole motor 50Hz 3000 [r/min] 4-pole motor 50Hz 1500 [r/min] Conclusion:...

Introduction to the transformer connection group - Schneider Introduction to the transformer connection group - Schneider

In the transformer planning process, the choice of wiring method is often not paid attention to. The three-phase transformer has A/B/C three-phase winding on the 1/2 side. The connection between them has a great impact on the operation performance of transformers, especially distribution transformers, and directly affects the quality of power supply. Therefore, the wiring ...

How to choose the Schneider ATV71 and the meaning of the letter How to choose the Schneider ATV71 and the meaning of the letter

The Schneider inverter model generally reflects the rated voltage, rated power, and load requirements of the inverter (heavy load is still light load type). Here are 2 examples: Example 1: Schneider inverter model: ATV71HD11 ...

Schneider miniature circuit breaker model and parameter difference Schneider miniature circuit breaker model and parameter difference

Schneider miniature circuit breakers are commonly used in C65, C120, EA9, INT125 and other products. Parameter differences: N -------- breaking ability, N is 6000A, H is 10000A, L is 15kA ...

Schneider ATV71 selection and letter meaning Schneider ATV71 selection and letter meaning

The type of Schneider inverter generally reflects the rated voltage, rated power, and load requirements of the inverter (heavy or light load). Here are two examples: Example 1: Schneider Inverter Type: ATV71HD11N ...

Inverter selection principle - Schneider Inverter selection principle - Schneider

1. Select the inverter according to the load characteristics. 2. When selecting the inverter, the actual motor current value should be used as the basis for the selection of the inverter, and the additional power of the motor can only be used as a reference. Secondly, the output content of the inverter should be fully considered.

Schneider soft starter fault alarm maintenance method Schneider soft starter fault alarm maintenance method

1. Question-F 05 (frequency error): This problem is caused by a problem with the soft starter processing the internal power signal, which is causing errors in the power supply frequency. This situation needs to be handled by the company's product development software design engineer. Mainly start the power supply circuit design ...

Introduction to Schneider limit switch series Introduction to Schneider limit switch series

1. XCKN compact limit switch Light and medium load use; Waist-shaped device holes for easy adjustment of mechanical errors; Bipolar isolation definitely disconnects the contacts; External waterproof sealing joint, the protection level is higher than that of rubber sleeve sealing pipe; Engineering plastic body, avoid temperature ...

Schneider's method of improving the power factor of UPS power supplies Schneider's method of improving the power factor of UPS power supplies

One. The significance of the progressive power factor. 1. Make full use of the ability of power equipment. Each power supply unit has additional capacity, i.e. depending on the power. The total power output of the power supply equipment S, - part of the active power, the other part is the reactive power, the smaller the ...

CATEGORIES BYPASS
Customer Service Center

Online Consultation:QQ


ContactContact

Contact: Manager Huang

Contact QQ: 3271883383

Contact number: 13522565663


Scan the code to add WeChat (please save the picture first on the mobile phone)

working hoursworking hours

Weekdays: 9:00-17:00

Holidays: Only emergencies are handled

Contact us

Contact us

Contact number QQ consultation
QQ consultation

3271883383

Company address
Back to top