In order to further strengthen the comprehensive cooperation with Shaanxi Traffic Control Group, on August 11, 2022, Xu Yue, Chairman and Co-President of Hollysys Group, visited Zhang Wenqi, Secretary of the Party Committee and Chairman of Shaanxi Traffic Control Group, and the two sides conducted in-depth exchanges and cooperation negotiations on topics such as business ecology and smart highways.
The leaders who accompanied the visit were: Li Zhi, Vice President of the Group and President of Beijing Hollysys System Engineering Co., Ltd., Liu Yuhuan, Vice President of Beijing Hollysys System Engineering Co., Ltd., Wang Renzhe, Deputy General Manager of Xi'an Hollysys System Engineering Co., Ltd., Wang Kai, Director of the Group Office, Shu Sen, Deputy General Manager of Shaanxi Traffic Control Group, Yao Yongfeng, General Manager of Shaanxi Traffic Control Operation Management Company, Yang Jian, Chairman of Shaanxi Traffic Control Technology Development Group, Dou Kai, Director of the Office of Traffic Control Group, Wang Chen, Director of the Operation and Management Department, Gao Jingwei, Minister of Science and Technology Security, accompanied the exchange.
During the meeting, Zhang Wenqi and Xu Yue respectively introduced the enterprise profile and business layout of both sides, and the participants fully understood the strong comprehensive service capabilities of Shaanxi Traffic Control in the fields of transportation infrastructure survey and design, investment, construction, operation, transportation, air freight, trade logistics, transportation technology, consulting, supervision, testing, transportation finance, comprehensive development of transportation-related industries, as well as the achievements of Hollysys in the fields of industrial automation, transportation automation, medical health, energy and environmental protection.
Liu Yuhuan, Vice President of Beijing Hollysys System Engineering Co., Ltd., introduced the core products of Hollysys' highway business: intelligent tunnel system based on edge intelligent controller, quasi-all-weather traffic system, lightweight bridge slope health monitoring system, ETC smart gantry, etc. Relying on the edge intelligent controller, the intelligent tunnel system integrates and replaces PLCs, industrial computers, servers, etc., opens up the equipment data chassis, and realizes intelligent applications such as tunnel inspection robots, energy-saving control based on edge controllers, digital twins based on the combination of laser and vision, and emergency linkage systems based on event detection and simulation based on three-dimensional tunnels, so as to improve the professionalism and informatization level of maintenance inspection and emergency disposal. The quasi-all-weather traffic system provides meteorological services of "kilometer-level forecasting and minute-level warning", which can timely and accurately identify visibility and road surface conditions (dark ice, slippery, waterlogged, etc.) through AI video recognition technology, and realize intelligent guidance and automatic disposal of ice in fog areas, and realize high-speed operation and control based on meteorology, so as to comprehensively improve the application level of highway traffic safety technology and all-weather traffic guarantee capabilities. The lightweight bridge slope health monitoring system significantly reduces the operation and maintenance cost of bridge slope and ensures the safety of bridge slope operation through lightweight wireless monitoring, precise algorithm middle platform, intelligent management and maintenance services, and professional structural evaluation. Equipped with edge computing units, the ETC smart gantry provides accurate information services such as meteorology and event detection for operation management and drivers.
Subsequently, the two sides carried out in-depth exchanges around the construction of smart highways, Secretary Zhang Wenqi said that Hollysys' products and technologies are leading and applicable, and suggested that Hollysys combine the actual operation and management pain points of Shaanxi Traffic Control to conduct in-depth research and continue to contribute experience and technology. At the same time, he hoped that the two sides would expand diversified cooperation mechanisms and in-depth technical exchanges to jointly promote the development of smart highways.
The two sides will take this discussion and exchange as an opportunity to focus on smart highways and other fields, give full play to their respective advantages, and achieve win-win development for both sides. Hollysys will also focus on the strategic policy of "intelligent control, intelligent management, independent and controllable, safe and credible", further give full play to the innovation advantages of high-tech enterprises, and contribute to the high-quality development of the industry.
|
More on that
|
Hollysys PLC - How to maintain the PLC control cabinet?
1. Data backup
When carrying out maintenance, we must cut off the power, data backup between power outages is an important link, for the data that needs to be archived for a long time, you can back up the historical trend data to the mobile hard disk, and then turn off the Windows-based operating system (Note...
|
|
Hollysys PLC - the characteristics of the working process of PLC
(1) The PLC adopts the working mode of centralized sampling and centralized output, which reduces the influence of external interference.
(2) The working process of PLC is the process of cyclic scanning, and the length of cyclic scanning time depends on the speed of instruction execution, the length of the user program and other factors.
(3) Output ...
|
|
Hollysys DCS - DCS fault maintenance measures
Whether it is a new unit or an upgraded DCS, the equipment of the system and controller should focus on the reliability and load factor (including redundancy) objectives. The load rate planning of the communication bus must be controlled within a reasonable range, and the load rate of the controller should be balanced as much as possible.
|
|
The characteristics of Hollysys LK series PLC are introduced in detail
LK is a programmable controller (PLC) product launched by Hollysys for medium and high-performance control fields. It fully integrates the advantages of DCS and PLC, adopts high-performance analog processing technology, miniaturized structural design, open industry standards, and a universal system platform, so that ...
|
|
Hollysys DCS - the development trend of DCS
(1) Development in the direction of integration: the development of standardized data communication links and communication networks, and the formation of a large system of various single (multi) loop regulators, PLCs, industrial PCs, NCs and other industrial control equipment to meet the requirements of factory automation and adapt to the general trend of openness.
(2) To the intelligent ...
|
|
Hollysys attended the 2021 China Software Industry Annual Conference
On April 7, 2021, the "2021 China Software Industry Annual Conference" hosted by the China Software Industry Association was held in Beijing. With years of technology accumulation and outstanding strength, Hollysys Group won the title of "The Most Influential Enterprise in China's Software Industry in 2020", as well as the "...
|
|
Troubleshooting steps of Hollysys DCS system
The steps of DCS system troubleshooting include:
(1) Check the fault caused by improper use.
Common types of operational faults include operator errors, terminal wiring faults, module installation faults, and power supply failures.
(2) Troubleshoot the improper operation of the DCS system ...
|
|
Hollysys PLC - maintenance steps of PLC control cabinet
1. Data backup
When carrying out maintenance, we must cut off the power, data backup between power outages is an important link, for the data that needs to be archived for a long time, you can back up the historical trend data to the mobile hard disk, and then turn off the Windows-based operating system (Note...
|
|
Hollysys DCS - Introduction to DCS grounding classification
In general, DCS control systems require two types of grounding: protective ground and working ground (logical, shielded, etc.). For systems equipped with safety barrier explosion protection measures, such as those used in the chemical industry, intrinsically safe premises are also required.
2.1 Protected areas (CG, Cabinet Grounding...)
|
|
Hollysys DCS control system configuration process
1. Preliminary preparations
Engineering configuration is operated at the engineer station, and before engineering configuration, it is necessary to have the necessary tools and information, specifically:
Tools: refers to the hardware environment and software environment used in engineering configuration, usually refers to the ...
|
|
Hollysys PLC - PLC should be noted in operation (2)
2. Interference in the control system and its sources
On-site electromagnetic interference is one of the most common factors in PLC control system and most likely to affect the reliability of the system. It is therefore essential to know the source of on-site disturbances ...
|
|
Hollysys DCS - a common fault of DCS
1. Field instrument equipment failure:
Field instrumentation equipment includes various transmitters, various switches, actuators, loads and components of various temperatures that are directly connected with the production process. If the field instrument fails, it directly affects the control function of the DCS system and the operator's ...
|
|
Hollysys DCS - What are the four contents of DCS spare parts management?
DCS spare parts In the process of using the DCS control system, its management is more important. The requirements of general DCS spare parts management are summarized in four aspects: storage, inspection, preparation for use, and use.
1. Storage
DCS system, spare module storage should meet the requirements ...
|
|
Hollysys' 100% domestic PLC has achieved breakthrough applications in the field of nuclear power
Hollysys, as the PC general contractor, participated in the construction of the first smart water project in the domestic nuclear power industry (1) - Qin's No. 2 Plant Chengjing Water Intake Smart Operation and Transformation Project, which was recently completed and put into operation. The project is independently implemented by Hollysys, and Hollysys is independently controllable, safe and reliable, and deeply developed by the nuclear high-tech project.
|
|
Hollysys debuted at the 13th Berlin International Rail Transit Exhibition
On September 20, 2022, Berlin time, the 13th Germany Berlin International Rail Transit Exhibition (InnoTrans 2022) opened at the Berlin International Exhibition Center in Germany. Following the 2018 exhibition, Hollysys once again appeared at the Berlin International Railway Exhibition (hereinafter referred to as the Berlin Exhibition) ...
|
|
Hollysys DCS - the connection method between thermocouple and DCS
1. The thermocouple uses a compensation wire, and there can be a node in the middle, but the corresponding compensation cable must be used to directly connect to the DCS thermocouple module, such as the LLMUX card in HONEYWELLTPS. Minimize nodes to reduce interference. In addition, in the DCS configuration, it is necessary to select the corresponding thermocouple model, and supplement the ...
|
|
Hollysys helped China's first 20,000-ton green electricity to green hydrogen demonstration project be fully put into operation
On August 30, Sinopec announced that China's largest photovoltaic power generation direct production green hydrogen project, Xinjiang Kuqa Green Hydrogen Demonstration Project (hereinafter referred to as the Green Hydrogen Demonstration Project), was fully completed and put into operation, marking a breakthrough in the large-scale industrial application of green hydrogen in China. In this project, and ...
|
|
Hollysys PLC - Introduction to the composition of PLC control cabinet
1. Open empty
A master air switch that is the power control for the entire cabinet.
2. Power supply
A 24VDC switching power supply.
3、PLC
This should be chosen according to the needs of the project. If the scale of the project is small, the integrated PLC can be used directly; If the item ...
|
|
Hollysys DCS - the main factor of DCS signal interference
Resistive coupling interference
In the process of work, many factories ignore the problem of wire aging. When a variety of signal lines are transmitted together, other transmission signals will be affected due to the aging and leakage of the insulation material on the wire, and other transmission signals will be interfered with. ...
|
|
Hollysys released a new 100% localized system
On the morning of October 20, 2021, at the Epec Industrial Products Exhibition, Hollysys released a new 100% localized system - 'HOLLiAS MACS IC fully autonomous and controllable DCS system'.
The system integrates the controller microkernel architecture independently developed by Lisi, embedded ...
|
|