Hollysys PLC - Introduction to the composition of PLC control cabinet

Create Date: 2024-8-30 12:03:23|Source: HollySys/HollySys

1. Open empty

A master air switch that is the power control for the entire cabinet.

2. Power supply

A 24VDC switching power supply.

  3、PLC

This should be chosen according to the needs of the project. If the scale of the project is small, the integrated PLC can be used directly; If the project is larger, you may need modules, card types, and redundancy.

4. a terminal block

It can be configured according to the number of signals. If it's just a simple PLC control cabinet, you basically need these things. If additional equipment in the control cabinet is required, this is on a case-by-case basis.

5. Relays

Sometimes the instructions sent by the PLC need to be relayed by the relay first, and the relay acts when the command is issued, so that the node of the control loop is connected to the normally open or normally closed point of the relay.
Hollysys PLC - Introduction to the composition of PLC control cabinet


More on that
Hollysys DCS - Introduction to the advantages and disadvantages of DCS Hollysys DCS - Introduction to the advantages and disadvantages of DCS

Merit: 1. High reliability: The DCS system has multiple redundancy, backup and recovery mechanisms, which can ensure the high reliability and stability of the system. 2. Sensitivity: The DCS system can be customized according to different industrial processes to meet different control requirements. 3. Efficiency: D...

Hollysys PLC – How to calculate the analog quantity in PLC Hollysys PLC – How to calculate the analog quantity in PLC

1、-10—10V。 When the voltage of -10V-10V is converted to F448-0BB8Hex (-3000-3000) at 6000 resolution; At 12000 resolution, it is converted to E890—1770Hex (-6000—6000). 2、0—10V。 At a voltage of 0-10V, at a resolution of 12000 ...

HollySys PLC - the usage and principle of PLC programming interrupts HollySys PLC - the usage and principle of PLC programming interrupts

When the PLC understands the interrupt function, it needs to understand the PLC's operating cycle or scan cycle. It is necessary to talk about the process of PLC sequential control loop execution, which is a prerequisite for understanding interruptions and must be mastered. It is divided into three parts, input processing, program processing, and output processing. 1、 ...

Hollysys DCS - DCS fault maintenance measures Hollysys DCS - DCS fault maintenance measures

Whether it is a new unit or an upgraded DCS, the equipment of the system and controller should focus on the reliability and load factor (including redundancy) objectives. The load rate planning of the communication bus must be controlled within a reasonable range, and the load rate of the controller should be balanced as much as possible.

Hollysys released a new DCS control system Hollysys released a new DCS control system

Hollysys' safe and trustworthy DCS control system uses the controller K-CU11 for the K series large-capacity trusted controller module, which adopts advanced PowerPC architecture high-performance main processor and security components based on national cryptography algorithm, and has the security functions of static trusted start and dynamic trusted measurement. ...

Hollysys PLC - the output wiring of PLC Hollysys PLC - the output wiring of PLC

(1) There are three forms of programmable controller: relay output, thyristor output, and transistor output. (2) The wiring of the output terminal is divided into independent output and common output. When the output relay or thyristor of the PLC is activated, the two output terminals of the same number are turned on. In different groups, you can ...

Hollysys PLC - three forms of PLC output circuit Hollysys PLC - three forms of PLC output circuit

1. Relay output circuit This type of output circuit form can be either DC or AC. The output circuit form of PLC relay allows the load to be generally below AC250V/50V, the load current can reach 2A, and the capacity can reach 80-100VA (voltage × current), so ...

Analysis of common problems of Hollysys DCS system Analysis of common problems of Hollysys DCS system

1. What is a communication protocol? A communication protocol is an agreement between two parties to a communication. The agreement includes uniform provisions on data format, synchronization mode, transmission speed, transmission steps, error detection and correction mode, and control character definition, etc., which must be complied with by both parties to the communication. Therefore...

Hollysys DCS - How to deal with DCS system failure? Hollysys DCS - How to deal with DCS system failure?

1. View the data on the monitoring screen When the following situations occur, it means that there is a problem with the control system, and the microcomputer maintenance personnel should be notified immediately for maintenance, and the operator should go to the site to deal with it. (1) Frequently changing data does not change for a long time, and several or all data do not ...

Hollysys PLC - what are the application fields of PLC Hollysys PLC - what are the application fields of PLC

1. Logic control of switching quantity This is the most basic and most extensive application field of PLC, which replaces the traditional relay circuit to achieve logic control and sequence control, which can be used for the control of a single device, as well as for multi-machine group control and automatic assembly line. Such as injection molding machines, printing machines, ...

Hollysys successfully signed a contract with Luxi Chemical for a 1.2 million tons/year bisphenol A plant project Hollysys successfully signed a contract with Luxi Chemical for a 1.2 million tons/year bisphenol A plant project

Recently, Hollysys successfully signed a contract with Luxi Chemical Group Co., Ltd. (hereinafter referred to as Luxi Chemical) for a 1.2 million tons/year bisphenol A equipment project. The project is a key project in Shandong Province in 2021, which will not only greatly improve the competitiveness of Luxi Chemical polycarbonate in the industry, but also have a significant impact on China's phenol ...

Hollysys PLC - Six Fault Types of PLC and Troubleshooting Methods (1-3) Hollysys PLC - Six Fault Types of PLC and Troubleshooting Methods (1-3)

First, the type of failure of the PLC. 1. External equipment failure. External equipment refers to various switches, sensors, actuators, loads, etc., which are directly connected with the PLC operation process. The failure of these equipment will directly affect the control function of the PLC system. Therefore...

Hollysys PLC - Calculation of the amount of pulses in PLC Hollysys PLC - Calculation of the amount of pulses in PLC

The control of pulse amount is mostly used for angle control, distance control, position control and so on of stepper motor and servo motor. The following is an example of a stepper motor to illustrate each control mode. 1. Angle control of stepper motor. First of all, it is necessary to clarify the number of subdivisions of the stepper motor, and then determine the stepper ...

Hollysys PLC - Introduction to the 4 basic concepts of PLC signals Hollysys PLC - Introduction to the 4 basic concepts of PLC signals

Analog signal: refers to a continuous current signal or voltage signal, and analog signal can be divided into standard signal and non-standard signal. Switching signal: It can be divided into active signal and passive signal, which is basically an on-off signal, and can be measured on and off with a multimeter ohm. ...

Bureau Veritas signed a strategic cooperation agreement with Hollysys Group and issued a ball valve functional safety certificate to it Bureau Veritas signed a strategic cooperation agreement with Hollysys Group and issued a ball valve functional safety certificate to it

Recently, the signing ceremony of the strategic cooperation between Bureau Veritas and Hollysys and the functional safety certification ceremony of Hollysys valves were held in the Hangzhou base of Hollysys. Mr. Ye Jiong, General Manager of Bureau Veritas Technology Center, Mr. Zhong Aimin, Director of Product Certification Center, Mr. Yang Yang, Sales Director of Eastern Region, and Mr. Yang Yang, Director of Functional Safety ...

What are the aspects of the configuration package of Hollysys DCS - DCS distributed control system? What are the aspects of the configuration package of Hollysys DCS - DCS distributed control system?

1. Configuration of the control loop The configuration of the control loop is essentially to use the various basic functional modules provided by the system to form a variety of actual control systems. At present, the configuration methods provided by various DCSs are different, and they can be summarized as having a specific computing module connected ...

Hollysys DCS - the development trend of DCS Hollysys DCS - the development trend of DCS

(1) Development in the direction of integration: the development of standardized data communication links and communication networks, and the formation of a large system of various single (multi) loop regulators, PLCs, industrial PCs, NCs and other industrial control equipment to meet the requirements of factory automation and adapt to the general trend of openness. (2) To the intelligent ...

Hollysys assisted the successful construction and operation of the largest natural gas deep processing base in Xinjiang Hollysys assisted the successful construction and operation of the largest natural gas deep processing base in Xinjiang

On August 16, 2021, the Tarim Oilfield Natural Gas Ethane Recovery Project, the largest natural gas deep processing base in Xinjiang (1), a key project of PetroChina, was successfully completed and put into operation, with stable operation and the production of qualified ethane products. Tarim Oilfield Natural Gas Ethane Recovery Project ...

Hollysys DCS - Introduction to the hardware architecture of DCS distributed control system Hollysys DCS - Introduction to the hardware architecture of DCS distributed control system

DCS usually adopts a hierarchical and progressive structure, each level is composed of several subsystems, and each subsystem achieves a number of specific finite goals, forming a pyramid structure. Examining the hierarchical structure of DCS, DCS level and control management level are the two most basic links that make up DCS. Process control...

Hollysys' 100% domestic PLC has achieved breakthrough applications in the field of nuclear power Hollysys' 100% domestic PLC has achieved breakthrough applications in the field of nuclear power

Hollysys, as the PC general contractor, participated in the construction of the first smart water project in the domestic nuclear power industry (1) - Qin's No. 2 Plant Chengjing Water Intake Smart Operation and Transformation Project, which was recently completed and put into operation. The project is independently implemented by Hollysys, and Hollysys is independently controllable, safe and reliable, and deeply developed by the nuclear high-tech project.

CATEGORIES BYPASS
Customer Service Center

Online Consultation:QQ


ContactContact

Contact: Manager Huang

Contact QQ: 3271883383

Contact number: 13522565663


Scan the code to add WeChat (please save the picture first on the mobile phone)

working hoursworking hours

Weekdays: 9:00-17:00

Holidays: Only emergencies are handled

Contact us

Contact us

Contact number QQ consultation
QQ consultation

3271883383

Company address
Back to top