DCS spare parts In the process of using the DCS control system, its management is more important. The requirements of general DCS spare parts management are summarized in four aspects: storage, inspection, preparation for use, and use.
1. Storage
The requirements that should be met for the storage of DCS system and spare modules are: all kinds of modules must be packaged in anti-static bags or stored according to the requirements of the manufacturer, and the temperature and humidity of the module storage room should also meet the requirements of the manufacturer; Anti-static measures should be taken when accessing the module, and it is forbidden to touch the circuit board with your hands at any time, and the registration should be carried out to go through the procedures for entering and exiting the warehouse.
2. Regular inspection
Every six months, a small number of commonly used DCS spare parts are inspected, of course, the cycle formulated by different companies is different, depending on the actual situation, the inspection content is as follows:
The surface is clean, the printed board insert is free of oil stains, the printed plate insert is free of oil stains, and there is no abnormality after slight knocking;
Load the test software, and work normally for no less than 48 hours;
Switching test of redundant modules;
The software loading and unloading test is normal, and the communication port and hand operation station are working normally;
All kinds of analog and switching input and output channels work normally;
After the inspection, the inspection record should be filled in and the conformity mark should be glued.
3. Prepare before use
Before operation, it is necessary to check whether the communication port, I/O function, and control algorithm function meet the requirements; Check the status of the module on the engineer station to meet the requirements; Insert the configuration in the module and check whether it is correct.
4. In actual use, the address of the module and other switches should be set, and the relevant personnel can confirm before inserting the correct mold position and filling in the record card.
The above is a summary of the four types of key points in the management process of DCS spare parts, which can be improved according to different use industries and environments, and are suitable for different occasions.
|
More on that
|
The characteristics of Hollysys LK series PLC are introduced in detail
LK is a programmable controller (PLC) product launched by Hollysys for medium and high-performance control fields. It fully integrates the advantages of DCS and PLC, adopts high-performance analog processing technology, miniaturized structural design, open industry standards, and a universal system platform, so that ...
|
|
Hollysys plc - the difference between DCS and PLC
1. DCS is a "distributed control system", while PLC (programmable controller) is just a control "device", which is the difference between the two. The system can realize the function and coordination of any equipment, and the PLC equipment only realizes the function of this unit.
2. In terms of networking, the DCS network is ...
|
|
Hollysys PLC - Introduction to the functions and application fields of PLC
1. The function of PLC
PLC is a general industrial automatic control device with microprocessor as the core, integrating computer technology, automatic control technology and communication technology, which has high reliability, small size, strong function, simple program design, flexible and universal and maintenance methods.
|
|
Hollysys DCS control system configuration process
1. Preliminary preparations
Engineering configuration is operated at the engineer station, and before engineering configuration, it is necessary to have the necessary tools and information, specifically:
Tools: refers to the hardware environment and software environment used in engineering configuration, usually refers to the ...
|
|
Hollysys DCS - What are the specific contents of the major and minor repair projects of the DCS system?
(1) Overhaul projects
DCS system overhaul is carried out in the random group of main equipment overhaul, and the overhaul project includes the following:
1) Conduct a comprehensive inspection of the control equipment and make a record.
2) Copy the configuration of all modules, and verify the marks and addresses of the modules.
3) Qing ...
|
|
Hollysys PLC - maintenance steps of PLC control cabinet
1. Data backup
When carrying out maintenance, we must cut off the power, data backup between power outages is an important link, for the data that needs to be archived for a long time, you can back up the historical trend data to the mobile hard disk, and then turn off the Windows-based operating system (Note...
|
|
Hollysys released a new 100% localized system
On the morning of October 20, 2021, at the Epec Industrial Products Exhibition, Hollysys released a new 100% localized system - 'HOLLiAS MACS IC fully autonomous and controllable DCS system'.
The system integrates the controller microkernel architecture independently developed by Lisi, embedded ...
|
|
The difference between Lysys plc - RS232 interface and RS485 interface
1. The physical structure of the interface
1. RS232 interface:
One of the computer communication interfaces, usually RS-232 interface in 9 pin (DB-9) or 25 pin (DB-25) form, generally there will be two sets of RS-232 interfaces on personal computers, respectively called COM ...
|
|
HollySys PLC - What are the design requirements that need to be met for PLC programs?
Simplicity
Make the PLC program as simple as possible. Simplicity means using a standardized procedural framework as much as possible and using simple instructions as much as possible.
If you want the program to be simple, in a big way, you should optimize the program structure, simplify the program with process control instructions, and ...
|
|
Hollysys safety barriers won excellent products
On December 18, 2020, the "8th Member Congress and 2020 Zhejiang Enterprise Leaders Summit" hosted by Zhejiang Enterprise Confederation, Entrepreneur Association and Industrial Economics Federation (hereinafter referred to as the "Three Associations" of Zhejiang Province) was held in Hangzhou. At the conference, the top 100 in Zhejiang Province in 2020 were commended.
|
|
Hollysys DCS - the main factor of DCS signal interference
Resistive coupling interference
In the process of work, many factories ignore the problem of wire aging. When a variety of signal lines are transmitted together, other transmission signals will be affected due to the aging and leakage of the insulation material on the wire, and other transmission signals will be interfered with. ...
|
|
HollySys PLC – 8 common error types of PLC
Various brands of PLCs have a self-diagnosis function, but the trick of PLC repair is to make full use of this function to analyze and then pinpoint the problem. Sorted out the 8 common types of errors that PLC repairmen need to know when the PLC presents abnormal alarms.
1. CPU abnormality ...
|
|
Hollysys PLC - the six application functions of PLC
1. It is used for switching control
The ability of PLC to manipulate switching quantities is very strong. The number of points in and out of the control, less than a dozen points, dozens of points, more can be hundreds, thousands, or even tens of thousands of points, because it can be networked, the number of points is almost unlimited, no matter how many points can be controlled, the control ...
|
|
Hollysys PLC - nine precautions for the use of PLC
1. PLCZ self-fault judgment
In general, PLCs are extremely reliable devices with a very low failure rate. The probability of hardware damage such as the CPU of the PLC or software running errors is almost zero; If the PLC input point is not caused by strong current intrusion, it will hardly be damaged; PLC output relay ...
|
|
Hollysys DCS - the connection method between thermocouple and DCS
1. The thermocouple uses a compensation wire, and there can be a node in the middle, but the corresponding compensation cable must be used to directly connect to the DCS thermocouple module, such as the LLMUX card in HONEYWELLTPS. Minimize nodes to reduce interference. In addition, in the DCS configuration, it is necessary to select the corresponding thermocouple model, and supplement the ...
|
|
Hollysys PLC - five characteristics that become a necessary condition for high-end PLC
Since the day of the birth of PLC, it has occupied the core position of the entire automatic control system. There are also many discussions about the development direction of PLC, whether it is predicted that PAC will replace PLC from 10 years ago, or during this time, some people even say that PLC is no longer needed in the future Industry 4.0 era...
|
|
Hollysys PLC - the importance of PLC industrial gateway
1. Realize remote control of industrial field equipment;
2. The PLC industrial gateway realizes remote upgrade of equipment firmware, downloads the program, and can flexibly access various equipment management platforms;
3. Realize remote control of industrial site touch screen and remote mapping of configuration screens;
4. PLC industry ...
|
|
Hollysys assisted the successful construction and operation of the largest natural gas deep processing base in Xinjiang
On August 16, 2021, the Tarim Oilfield Natural Gas Ethane Recovery Project, the largest natural gas deep processing base in Xinjiang (1), a key project of PetroChina, was successfully completed and put into operation, with stable operation and the production of qualified ethane products.
Tarim Oilfield Natural Gas Ethane Recovery Project ...
|
|
Hollysys PLC – How to calculate the analog quantity in PLC
1、-10—10V。 When the voltage of -10V-10V is converted to F448-0BB8Hex (-3000-3000) at 6000 resolution; At 12000 resolution, it is converted to E890—1770Hex (-6000—6000).
2、0—10V。 At a voltage of 0-10V, at a resolution of 12000 ...
|
|
Hollysys PLC - common faults and solutions of CNC machine tool PLC
CNC machine tool PLC (programmable logic controller) has the following common faults in the operation process, and the following corresponding solutions are taken for the faults in the work engineering to make the equipment operate normally.
1. The power grid fluctuates too much, and the PLC does not work
It is manifested as no output of the PLC. Check first ...
|
|