Hollysys, as the PC general contractor, participated in the construction of the first smart water project in the domestic nuclear power industry (1) - Qin's No. 2 Plant Chengjing Water Intake Smart Operation and Transformation Project, which was recently completed and put into operation. The project was independently implemented by Hollysys, and the independent, controllable, safe and reliable, and deeply localized control system developed by Hollysys by the nuclear high-tech project was applied for the first time in Qinshan Nuclear Power.
Hardcore control for superior performance
The control system used in this project is a member of Hollysys' new generation of high-end controller LKC series PLC. The system is equipped with a high-performance processor platform - Loongson dual-core high-frequency processor. Provide sufficient computing power for the efficient operation of real-time control tasks; The system is also equipped with a fully redundant architecture, which supports all-round redundancy such as dual rack backplanes, CPU, power supply, I/O, and network, which fully ensures the high availability of the system. LKC series PLC has passed strict product and system tests, and has obtained CE, UL and other international certifications.
Independent and controllable, safe and reliable
Hollysys has mastered all the key technologies of PLC design and development, including key chips and components, embedded real-time operating systems, real-time control engines, real-time industrial networks, programming and configuration software, etc., and all related components and technologies are independently developed and controllable. In addition, Hollysys PLC has realized the localization of cryptographic chips and cryptographic algorithms, and all safe and credible basic technologies, including trusted chips and trusted strategies, have also been independently controlled. Hollysys LKC series PLC adopts a dual-system trusted computing structure, supports the expansion of national cryptography security chips and the integration of SM2/3/4 national cryptography algorithms, and builds a PLC endogenous security active protection system based on trusted 3.0 technology. Strengthen the foundation of information security.
Typical cases of independent implementation
This project is the first nuclear power smart water project in China (1). Based on technologies such as the Internet of Things, cloud computing, and 5G, Hollysys provides plant networks for key businesses such as safety management, production and operation, water quality testing, and equipment management of the water system of nuclear power plants. The integrated system platform realizes the application integration of process system, control system and management centralized control platform, and completes the implementation of all projects such as on-site equipment installation, system commissioning, and control room human factors engineering.
Hollysys has configured a deep domestic PLC system for the project, which has the application characteristics of dual master control unit redundancy, dual power supply redundancy, dual network port redundancy, etc., and applied 5G technology for the first time to achieve long-distance real-time transmission. - Time data communication and control. That is, on the basis of realizing the control of all process system equipment, lighting system equipment and electrical system equipment at the water intake, the control system also receives the control instructions sent by the centralized control platform through the 5G network. The data analysis function of the system also plays a key role in improving the intelligent level of water affairs in Qinshan.
The breakthrough of Hollysys' domestic PLC in this project marks the success of Hollysys to help the in-depth localization of nuclear power instrumentation and control to a new level! The successful operation of the project also proves that the intelligent water system of the nuclear power plant with Hollysys Shenzhen domestic PLC as the core is fully qualified for the application scenario of nuclear power plant water treatment, and the project results can be promoted and applied in more fields. Renovation projects.
|
More on that
|
Localization transformation: Hollysys assisted in the successful transformation of the DCS system of the first Shell coal gasification unit in China
Since the reform and opening up, China's economy has developed rapidly, and many enterprises have improved production efficiency by introducing foreign production equipment and DCS systems. However, with the growth of the use years, many foreign DCS systems and equipment have gradually aged and are not suitable for the current production needs, so they are localized.
|
|
Hollysys DCS - the main factor of DCS signal interference
Resistive coupling interference
In the process of work, many factories ignore the problem of wire aging. When a variety of signal lines are transmitted together, other transmission signals will be affected due to the aging and leakage of the insulation material on the wire, and other transmission signals will be interfered with. ...
|
|
Hollysys DCS - Introduction to the advantages and disadvantages of DCS
Merit:
1. High reliability: The DCS system has multiple redundancy, backup and recovery mechanisms, which can ensure the high reliability and stability of the system.
2. Sensitivity: The DCS system can be customized according to different industrial processes to meet different control requirements.
3. Efficiency: D...
|
|
Hollysys DCS - What are the specific contents of the major and minor repair projects of the DCS system?
(1) Overhaul projects
DCS system overhaul is carried out in the random group of main equipment overhaul, and the overhaul project includes the following:
1) Conduct a comprehensive inspection of the control equipment and make a record.
2) Copy the configuration of all modules, and verify the marks and addresses of the modules.
3) Qing ...
|
|
Hollysys DCS - What are the characteristics of DCS?
1. High reliability
Because DCS disperses the system control function on each computer, and the system structure adopts a fault-tolerant design, the failure of one computer will not lead to the loss of other functions of the system. In addition, due to the fact that the tasks undertaken by the various computers in the system are comparatively ...
|
|
Hollysys DCS - DCS system operation problem analysis and preventive measures
1. Communication network failure: communication network faults are generally easy to occur at the contact bus and local bus, or caused by wrong address identification.
2. Node bus failure: The transmission medium of the node bus is generally coaxial cable, some use token signal transmission mode, and some use ...
|
|
What are the characteristics of Hollysys PLC - PLC program?
1. Correctness (low debugging cost)
First of all, the PLC program must be able to work correctly to meet the requirements of the actual control process. This is the essence of the PLC program, and if you don't do that, nothing else makes sense.
2. Reliability (low maintenance cost)
Not only to ...
|
|
What should be paid attention to when cooperating with Lysys PLC-PLC and inverter?
1. Input of switch command signal
The input signal of the inverter includes a switch-type command signal that controls the operating status such as operation/stop, forward/reverse, section speed, and joging. Frequency converters usually make use of relay contacts or components with relay contact switching characteristics (such as crystals).
|
|
Hollysys PLC - three forms of PLC output circuit
1. Relay output circuit
This type of output circuit form can be either DC or AC. The output circuit form of PLC relay allows the load to be generally below AC250V/50V, the load current can reach 2A, and the capacity can reach 80-100VA (voltage × current), so ...
|
|
Hollysys signed a strategic cooperation agreement with Jinan Iron and Steel International in Jinan
Hangzhou Hollysys Automation Co., Ltd. (hereinafter referred to as Hanghe) and Jinan Iron and Steel Group International Engineering Technology Co., Ltd. (hereinafter referred to as Jinan Iron and Steel International) signed a strategic cooperation agreement in Jinan. Luan Yuandi, Deputy General Manager of Jinan Iron and Steel International, Sun Jiaying, Director of the Automation Division, and Liu Xinjie, Director of the Automation Office...
|
|
Hollysys was invited to participate in the 2023 China Petroleum and Chemical Industry Digital Transformation and Intelligent Development Conference and delivered a keynote speech
On March 15, the 2023 China Petroleum and Chemical Industry Digital Transformation and Intelligent Development Conference was held in Tai'an, Shandong. The conference aims to strengthen the construction of "intelligent oil and gas fields, intelligent petrochemicals, intelligent chemicals and intelligent oil and gas pipeline networks", and lead China's petroleum and chemical industry to achieve intelligent transformation.
|
|
Hollysys DCS - DCS common communication faults and solutions
01 Node bus failure
The node bus material is usually a coaxial cable, so as long as there is a cable disconnected, the communication of all devices on the bus will be paralyzed, which will cause serious phenomena such as data loss, equipment stoppage and operation interruption, and may eventually directly or indirectly cause huge ...
|
|
Hollysys PLC - PLC maintenance and use skills
With the development of society, PLC programmable controller has been widely used in industrial production, but its maintenance and overhaul methods and skills, many engineers are not lawful, the following is to introduce the experience and skills of PLC use process.
1. PLC input and output
A ...
|
|
Hollysys DCS – the steps for DCS to properly power off and power on
DCS is properly blacked out
When the DCS needs to be powered off for maintenance due to overhaul or other reasons, we often directly power off the DCS, but sometimes this non-standard operation will bring serious consequences, such as configuration loss, PID parameter loss, etc. So there is a need for blackouts and re-on...
|
|
Hollysys PLC - the output wiring of PLC
(1) There are three forms of programmable controller: relay output, thyristor output, and transistor output.
(2) The wiring of the output terminal is divided into independent output and common output. When the output relay or thyristor of the PLC is activated, the two output terminals of the same number are turned on. In different groups, you can ...
|
|
Hollysys DCS - Introduction to I/O in DCS control system
The control system needs to establish the input and output channels of the signals, which is called I/O. The I/O in a DCS is generally modular, with one or more I/O channels on one I/O module for connecting sensors and actuators (control valves).
The control unit of the DCS: a process control station is ...
|
|
Hollysys PLC - the design specification of PLC program
(1) Select the appropriate PLC model and I/O points, and select the special function module when there are special function requirements.
(2) Familiar with the selected PLC programming instructions and compilation software.
(3) Carry out soft component planning, including internal relays, holding relays, data registers, ...
|
|
Hollysys PLC - the basic structure of PLC controller is introduced
PLC is essentially a kind of computer dedicated to industrial control, and its hardware structure is basically the same as that of a microcomputer, and its basic composition is as follows:
1. Power supply
The power supply of the PLC plays a very important role in the whole system. If you don't have a good, reliable power system that is ...
|
|
Hollysys released a new DCS control system
Hollysys' safe and trustworthy DCS control system uses the controller K-CU11 for the K series large-capacity trusted controller module, which adopts advanced PowerPC architecture high-performance main processor and security components based on national cryptography algorithm, and has the security functions of static trusted start and dynamic trusted measurement. ...
|
|
Hollysys PLC - maintenance steps of PLC control cabinet
1. Data backup
When carrying out maintenance, we must cut off the power, data backup between power outages is an important link, for the data that needs to be archived for a long time, you can back up the historical trend data to the mobile hard disk, and then turn off the Windows-based operating system (Note...
|
|