How to properly ground the PLC - Xinjie PLC

Create Date: 2024-8-30 12:03:23|Source: XINJE

The grounding policy is nothing more than to avoid disturbance for safety, and the policy of grounding to PLC must not be attached to the disturbance at the power supply and input and output terminals, so the accurate grounding system is one of the primary methods for the PLC control system to resist electromagnetic disturbance. The grounding preparation has floating preparation and direct grounding preparation, and the direct grounding preparation should be selected for the PLC control system.

                              How to properly ground the PLC - Xinjie PLC

The grounding policy is nothing more than to avoid disturbance for safety, and the policy of grounding to PLC must not be attached to the disturbance at the power supply and input and output terminals, so the accurate grounding system is one of the primary methods for the PLC control system to resist electromagnetic disturbance. The grounding preparation has floating preparation and direct grounding preparation, and the direct grounding preparation should be selected for the PLC control system.

The detailed grounding formula is selected as follows: grounding of the barrier line barrier layer: when the signal source is grounded, the barrier layer should be grounded on the signal side; When the signal source is not grounded, it should be grounded on the PLC side; When there are joints at both ends of the signal line, the barrier layer should be stably adjacent and insulated, and multi-point grounding must be avoided; When the barrier twisted pair of multiple measurement point signals is adjacent to the multi-core twisted pair main screen cable, each barrier layer should be adjacent to each other, and after insulation treatment, the appropriate grounding point should be selected for single-point grounding.

Wiring of input and output parts: PLC power cable, I/O power line, input signal line, output signal line, exchange line, and DC line should be separated as much as possible. The switching signal line and the analog signal line should also be separated from the wiring, and the latter should be a barrier line, and the barrier layer should be grounded. Barrier lines should also be used for digital transmission lines, and the barrier layer should be grounded. Because the purpose of the current mark in the twisted pair is opposite, the size is the same, and the noise caused by the current can cancel each other, so the signal line is mostly twisted pair or barrier line.

1. Grounding disposal of PLC

In the PLC control system. There are many forms of "ground".

Not required:

(1) Signal ground: It is the ground of the signal element sensor at the input end. In order to attach disturbance to the power supply, transmission, and output, the PLC system should be grounded excellently. General environment. The grounding arrangement is related to the signal frequency, when the frequency is lower than 1MHz, a point of grounding can be used; When higher than 10MHz, multi-point grounding is selected;

Which ground to choose between 110MHz depends on the actual environment.

Therefore, the control system composed of PLC is often grounded at one point. The cross-sectional area of the grounding wire is not less than 2mm2. The grounding resistance should not be greater than 100Q, and the grounding wire should be shared. If this requirement is not met. A common grounding arrangement is also available. Choose a preparation that is grounded with other equipment.

(2) Barrier: The shell or wire mesh that is generally set up to avoid static electricity. It is adjacent to the earth's crust by a specially made copper wire.

More on that
Precautions for resetting parameters of inverter - Xinjie Precautions for resetting parameters of inverter - Xinjie

(1) There is no need to adjust the parameters, we can maintain the original parameters (default value) when the inverter leaves the factory. (2) It is the parameter that needs to be set and changed before the trial operation. (3) It is a parameter that is adjusted in the operation of the demand. Frequency converters ...

New models such as IoT industrial controllers and smart cameras have been launched New models such as IoT industrial controllers and smart cameras have been launched

From 14:00 to 15:20 on May 14 last year, the X-SIGHT visual brand conference with the theme of "Vision, Light Up Intelligent Manufacturing" was held online, officially announcing that Wuxi Xinjie and Intel will join hands to create a new era of intelligent manufacturing. X-SIGHT unveiled a new Intel chip-based ...

Xinjie inverter maintenance method Xinjie inverter maintenance method

In the instruction manual of the inverter, there is a column that discusses in detail the fault code display of the inverter.   1. Short-circuit maintenanceIf there is short-circuit maintenance on the side of the inverter's operation, "0" means that the inverter has short-circuit elements inside or outside. There are several reasons for this ...

Industrial intelligence ushered in a period of rapid development - Xinjie Industrial intelligence ushered in a period of rapid development - Xinjie

The World Economic Forum (Davos Forum) Annual Meeting 2016 will be held in Davos from 20 to 23 this month, with the theme of "Mastering the Fourth Industrial Revolution". ...

Xinjie PLC failure and solution Xinjie PLC failure and solution

Xinjie PLC conditions are established, why is the corresponding coil not in place? There are two possible reasons for this: (1) The same coil may be used in multiple places to perform the double coil output, and when the double coil is output, the coil on the rear side will operate first. (2) ...

VFD Configure Braking Resistor step VFD Configure Braking Resistor step

Confirm the rated power and resistance value of the braking resistor. The rated power of the braking resistor should be determined according to the power and moment of inertia of the motor, and the resistance value should be selected according to the specifications of the VFD. In the VFD's parameter settings, find the parameters related to the braking resistor, such as the braking resistor selection ...

Superheat treatment method of Xinjie inverter drive motor Superheat treatment method of Xinjie inverter drive motor

Why does the motor driven by the inverter overheat? This is due to the fact that the voltage of the inverter drive motor contains a rich high-frequency component. The voltage waveform of the inverter-driven motor is not a sine wave voltage, but a pulse-width modulation (PWM) voltage. According to Fu Liye's analysis, this waveform ...

Learn PLC programming skills - Xinjie PLC Learn PLC programming skills - Xinjie PLC

1. When the PLC and the host computer (or touch screen) form a monitoring system, there are many times on the screen that there are "manual", "active" and other control modes (generally more than one). In the program, you can use the "MOV" command. For example, when selecting "manual", the constant 1MOV will be ...

Xinjie PLC problems and solutions Xinjie PLC problems and solutions

Xinjie PLC 丨Communication failure is generally summarized as the following problems: (1) Communication parameters: The communication parameters of Xinjie PLC communication port and peripheral equipment may be inconsistent. (2) Communication line: The connection may be incorrect, or the contact is poor, the user can replace the communication line and try again.

The reason why the inverter damages the motor bearing - Xinjie The reason why the inverter damages the motor bearing - Xinjie

The damage of the inverter to the motor contains two aspects, the damage of the stator winding and the damage of the bearing, this damage usually occurs in a few weeks to more than ten months, the detailed moment and the inverter brand, the motor brand, the motor power, the inverter carrier frequency, the cable length between the inverter and the motor, the ring ...

Leakage analysis of inverter-controlled motor - Xinjie Leakage analysis of inverter-controlled motor - Xinjie

Because the current at the input and output ends of the inverter contains high-frequency components, the leakage current formed by the high-frequency components when the inverter is driven is greater than that when the grid power supply is supplied. Because there are many varieties of circuit breakers, in some cases, even the inverter wires and motors ...

Quick steps to debug the inverter – Xinjie Quick steps to debug the inverter – Xinjie

1. Check the full-load power supply of the inverter (Variable-frequency Drive (VFD). 1. Ground the terminal strip of the VFD. 2. Type the switching power supply of VFD into the terminal and receive it from the switching power supply through the power switch of the leakage protector. 3. ...

Common problems and solutions of Xinjie PLC Common problems and solutions of Xinjie PLC

1. Why can't the PLC communicate with the peripherals? Communication failures are generally summarized as the following problems: 1. Communication cable: The connection may be incorrect, or the contact is poor, the user can change the communication cable and try again. 2. Communication parameters: PLC communication port and peripheral equipment ...

PLC programming algorithm - Xinjie PLC PLC programming algorithm - Xinjie PLC

1. The switching quantity is also called the logical quantity, which means that there are only two values, 0 or 1, ON or OFF. It is the most commonly used control, and it is the advantage of PLC to control it, and it is also the most basic use of PLC. The intention of switching quantity manipulation is to use the current input combination of the switching quantity with the historical input ...

The Xinjie touch screen screen production system includes the project The Xinjie touch screen screen production system includes the project

The creation of the touch screen screen is done by TouchWin editing tool software. Each screen includes each control menu and video window, and the home page can be written by the relevant units to write the advertising screen welcome speech or system model description. The system mainly includes the following items: ...

Xinjie launched the wireless transparent transmission module S-BOX-T Xinjie launched the wireless transparent transmission module S-BOX-T

   Wireless module introduction: W-BOX-T: Wireless WIFI module, XC, XD series can be used, occupying RS232 port; S-BOX-T S-BOX: 433MHZ MODULE, XC AND XD SERIES CAN BE USED, OCCUPYING RS232 PORT; XD-E1WT-A ...

PLC communication interface failure and solution——Xinjie PLC communication interface failure and solution——Xinjie

1. Common problem phenomena When the RS-485 port of the PLC is connected to the computer through the non-blocking PC/PPI cable, the connection between the PLC and the PLC, or the communication between the PLC and the inverter, touch screen, etc., the communication port is damaged, and the more common damage conditions are as follows: (1) R1 or R2 is burned ...

The application of Xinjie PLC in central air conditioning The application of Xinjie PLC in central air conditioning

One. How the system works The fresh air blown in by the fresh fan enters the room through the heating exchanger, refrigeration exchanger, and humidifier. In the room, the signals measured by the temperature, humidity, and differential pressure detectors are reflected to the controller. The heating and refrigeration exchanger is controlled by a digital manipulator by a reaction signal ...

Introduction of Xinjie MS6G-130 series inertia servo motor Introduction of Xinjie MS6G-130 series inertia servo motor

For the 130 frame same service motor, the MS6H-130 series high inertia servo motor previously launched by Xinjie is mainly used in large inertia load occasions, in order to enrich the application scenario, the MS6G-130 series medium inertia servo motor is launched, which is suitable for DS5 series servo drive ...

Xinjie fast positioning switching power supply method Xinjie fast positioning switching power supply method

Switch Mode Power Supply (SMPS) will cause the base of the switch tube to fail to get the switching pulse and intermittent operation due to the short circuit of the load, the failure of the vibration circuit itself and the loss of control of the protection circuit, which makes it difficult to locate the shortcomings of SMPS. Difficult to repair ...

CATEGORIES BYPASS
Customer Service Center

Online Consultation:QQ


ContactContact

Contact: Manager Huang

Contact QQ: 3271883383

Contact number: 13522565663


Scan the code to add WeChat (please save the picture first on the mobile phone)

working hoursworking hours

Weekdays: 9:00-17:00

Holidays: Only emergencies are handled

Contact us

Contact us

Contact number QQ consultation
QQ consultation

3271883383

Company address
Back to top