1. Common problem phenomena
When the RS-485 port of the PLC is connected to the computer through the non-blocking PC/PPI cable, the connection between the PLC and the PLC, or the communication between the PLC and the inverter, touch screen, etc., the communication port is damaged, and the more common damage conditions are as follows:
(1) R1 or R2 is burned out, Z1, Z2 and SN75176 are not missing. This is because there is a large transient disturbance current through R1 or R2, bridge rectification, Z1 or Z1 to the ground, Z1, Z2 can accept the impact of a maximum current of 10A, and the transient power of the current on R1 or R2 is: 102×10=1000W, of course, it will be burned off.
(2) SN75176 is damaged, R1, R2 and Z1 and Z2 are not missing. This is mainly due to electrostatic shock or transient overvoltage speed faster than the action speed of Z1 and Z2, static electricity is ubiquitous, and static electricity of ± 15kV can occur only in the human body model.
(3) Z1 or Z2 and SN75176 are damaged, and R1 and R2 are not missing. This may be due to the transient disturbance voltage of high voltage and low current, which breaks down Z1 or Z2 and SN75176, because the current is small and the occurrence time is short, so R1 and R2 will not heat up and burn out.
2. Analysis of the cause of the problem
From the analysis in 1, it is known that the primary reason for the damage of the PLC interface is due to the formation of transient overvoltage and static electricity, and the reasons for the occurrence of transient overvoltage and static electricity are many and complex, such as because the 24V power supply and 5V power supply in the PLC are grounded, and the output terminals of the 24V power supply L+ and M are mixed with other equipment, which may lead to the change of ground potential, and then the formation of common mode voltage beyond the allowable range. Therefore, the EIA-485 specification requires that the signal ground of each RS485 interface be connected together with a low-resistance wire to ensure that the ground potential of each node is equal, eliminating the ground circulation.
(1) When the unblocked connecting cable is plugged and unplugged live, because there are many inductors, capacitors and other equipment in the circuit with unequal potentials at both ends, transient overvoltage or overcurrent will inevitably occur at the moment of plugging and unplugging. Based on this consideration, when plugging and unplugging the communication connector, try to keep the device in a power-off condition.
(2) The transient overvoltage or overcurrent of other equipment connected to the RS-485 bus will also flow into the PLC, and the more equipment stations connected to the bus, the more transient overvoltage factors will occur.
(3) When the communication line is long or there are outdoor overhead lines, lightning is a disturbance that must be considered. Lightning is the primary source of natural disturbances, and the disturbances caused by lightning can be transmitted thousands of kilometers away. The time-domain waveform of lightning disturbance is superimposed into a large spike pulse on the background of a random pulse, and this spike pulse with huge energy will inevitably form an overvoltage on the line, resulting in damage to the equipment connected to the communication network such as PLC, which should be prevented or reduced to reduce the damage and reduce the loss.
3. Solution
1. Consider from within the PLC
(1) The DC/DC with blocking is used to block the 24V power supply and the 5V power supply, as is the case with the Profibus interfaces of Mitsubishi, Omron, Schneider PLC and Siemens
(2) Select high-grade RS-485 chips with perfect maintenance measures such as electrostatic maintenance, overheating maintenance, input failure maintenance, etc., such as: SN65HVD1176D, MAX3468ESA, etc., the price of these chips is generally more than ten yuan to dozens of yuan, while the price of SN75176 is only 1.5 yuan.
(3) Choose a new type of maintenance equipment with faster response speed and greater transient power TVS or BL surge absorber, such as P6KE6.8CA stress voltage of 6.8V, transient power of 500W, BL equipment can resist high current impact of more than 4000A. If you use a chip with no faulty maintenance, such as SN75176, you can do some processing on the software to prevent abnormal communication. That is, before entering the normal data communication, the host pre-drives the bus to be greater than +200mV, and insists on it for a period of time, so that the receivers of all nodes have a high-level output. In this way, when announcing useful data, all receivers can correctly receive the start bit and thus good data.
(4) R1 and R2 use positive temperature coefficient of self-recovery and stable PTC, such as JK60-010, the resistance value under normal conditions is 5 ohms, and does not affect normal communication, when the surge impact, the high current flows through the PTC and maintenance equipment TVS (or BL), the resistance value of PTC will increase suddenly, so that the surge current is quickly reduced.
2. Consider from outside the PLC
(1) Use blocked PC/PPI cables, and try not to use cheap non-blocked cables (especially in industrial sites). The PC/PPI cable (6ES7901-3BF00-0xa0) produced by Siemens in the early stage is non-blocking, and now it has also been changed to a barrier cable.
(2) When the RS-485 port of the PLC is networked, the blocked bus connector, such as PFB-G, has a rate of 0-1.5Mbps and is automatically adapted, and the shape and application method are the same as those of Siemens' non-blocked bus connection.
(3) The third-party equipment networked with the PLC, such as the RS-485 port of the inverter and touch screen, is blocked by the RS-485 blocker BH-485G, so that there is no "electrical" connection between the RS-485 nodes, and there is no ground circulation, even if one node is damaged, it will not be damaged with other nodes.
(4) Good grounding is an important condition for the safe and reliable operation of the industrial control system, especially for the industrial communication network. In an industrial communication network, there are at least three separate ground wires, which are grounded by a point. The first is the ground wire of the low-level circuit (i.e., the signal ground), including digital ground, analog ground, signal ground and DC ground, etc.; The second is the noise ground wire, that is, the ground wire of relays, motors, and high-power circuits; The third is the grounding point of the casing, which is specially used for the mechanical shell, fuselage, rack, and ground, and the ground wire should be connected to the ground wire of the AC power supply. The AC power ground wire should be connected to the maintenance ground wire to prevent disturbance caused by the uneven position of each point of the announced ground wire. The RS-485 communication cable is shielded with a special shield cable for the PROFIBUS bus, which ensures that the shield is connected to the housing of each device and finally to the ground.
(5) Regarding the system with overhead lines, it is best to set up special lightning protection equipment on the bus.
|
More on that
|
Xinjie WIFI wireless communication module W-BOX
W-BOX is a 2.4GHzWifi-based wireless communication module independently developed and recently launched by Xinjie in line with the trend of wireless communication. W-BOX can be connected with wireless AP (hotspot) in various occasions to complete long-distance monitoring of PLC and overall control of PLC wireless networking in various environments.
|
|
The inverter controls the leakage of the motor
Because the current at the input and output ends of the inverter contains high-frequency components, the leakage current formed by the high-frequency components when the inverter is driven is greater than that when the grid power supply is supplied. Because there are many varieties of circuit breakers, in some cases, even the inverter wires and motors ...
|
|
An overview of the precise timing instructions of the Seejet PLC
Make accurate punctuality, read accurate punctuality, and stop accurate punctuality.
Watchman number. Range: T600 - T618 (T600, T602, T604...) T618, numbered even)
Punctuality.
Accurate punctuality ...
|
|
Xinjie WIFI communication module WBOX
Product Description:
According to the 2.4GHz Wifi wireless communication module, it has RS232 and RS485 interfaces
Compatible with Xinjie XC2 - XCM series, XD series PLC, MODBUS RTU equipment
The XD-WBOX-ED is connected to the left side of the XD series PLC
Opt IEEE802.11b.g. ...
|
|
The difference between PLC and single-chip microcomputer - Xinjie PLC
The ladder diagram of the PLC can be understood as a programming language like the assembly and other calculator languages, but the scale of use is different! And the general practice is to convert your ladder diagram into C or assembly language (determined by the CPU used by the PLC), and then use the assembly or C compilation system to compile ...
|
|
Xinjie plc programming software XCPPro
XCPPro is a professional XCPPl programming software, which is a new XC series PLC programming software, which can be used normally by making corresponding configurations in XCPPro. The software supports WindowsXP32-bit Win764-bit system. ...
|
|
Advantages of Xinjie touch screen and PLC wireless measurement and control network solution
1. Save the transformation cycle, no need for large-scale construction: eliminate the trouble of wiring maintenance, and easily complete the transformation within one day and meet the requirements of communication stability.
2. The device is simple, no programming is required: the wireless communication terminal only needs to ...
|
|
Can the Xinjie touch screen software be installed or used normally?
Why can't the touch screen software be installed or used properly?
1. Before the device, please close the antivirus software and system optimization things;
2. After the device is successful, double-click the software convenience icon on the desktop, "Please set the display to be true color" prompt ...
|
|
Anti-interference countermeasures for PLC and touch screen - Xinjie
1. Select the power supply with excellent performance and press the disturbance introduced by the power grid
The power supply of the PLC controller is powered by a non-power line, and is powered by a special line directly led by the main bus of the low-voltage distribution room. Barrier transformer should be selected, the transformer capacity should be 1.2-1.5 times larger than the actual need, and can be used in the barrier...
|
|
Xinjie inverter overload protection object
Inverters are mainly divided into two categories according to the frequency conversion method: communication/DC/communication and communication/communication inverters. AC/DC/AC inverter, also known as direct inverter, refers to the operation, the first 50Hz power frequency communication power is converted into pulsating direct current through the rectifier module unit, ...
|
|
Introduction of Xinjie MS6G-130 series inertia servo motor
For the 130 frame same service motor, the MS6H-130 series high inertia servo motor previously launched by Xinjie is mainly used in large inertia load occasions, in order to enrich the application scenario, the MS6G-130 series medium inertia servo motor is launched, which is suitable for DS5 series servo drive
...
|
|
The steps of the system put into operation after PLC overhaul - Xinjie
After overhauling and confirming that all connections of the system are correct, power on the relevant modules until the card indicator shows normal.
The initiation process of the system after the scheduled repair is as follows:
(1) Power supply. Turn on the power supply equipment (including the UPS...)
|
|
Xinjie PLC inverter visual system
XC can be divided into multiple sub-series according to the incompatibility of functions, including XC1 (economy), XC2 (foundation), XC3 (standard), XC5 (enhanced) and their corresponding expansion modules, as well as special imitation ontology, activity control models, etc. Powerful function, complete variety, can be full ...
|
|
Inverter protection and display function - Xinjie
1. Maintenance of the inverter itself:
Instantaneous overcurrent, overvoltage, undervoltage, overload, short circuit to ground, abnormal control circuit, then for the maintenance of the inverter itself, the overcurrent, overvoltage, undervoltage and so on set the limit value, when the inverter is running, if ...
|
|
The safety standard of the inverter - Xinjie
World electrical safety standards: The requirements are in line with the world's electrical safety standards, such as the CE standard in Europe and the UL standard in the United States. These specifications specify the requirements for electrical safety functions, mechanical safety functions, EMC functions, etc.
Machine...
|
|
XLH Series 32-Axis EtherCAT Bus Controller - Xinjie
Following the launch of XDH, XLH series 16-axis and other models, Xinjie has achieved good market feedback, and the XLH-30A32 low-profile controller to be launched today can be expanded by 32 bus nodes, and has better performance in basic performance and bus control ability.
...
|
|
The four main functions of the PLC control cabinet - Xinjie
1. Power switching and maintenance: There is a circuit breaker in the PLC cabinet, which is connected to the incoming power supply. In addition to making and disconnecting circuits, circuits can also be maintained for short circuits and overloads. Cut off the power supply during repairs.
2. Start and stop control function: The panel of the PLC inverter cabinet is equipped with a man-machine interface, and the inverter start and stop button ...
|
|
Internal causes and preventive measures of inverter failure
The problem of the inverter is not only affected by external factors, but also by internal factors.
1. The inverter parameter setting is unreasonable and countermeasures to make the inverter work normally, in addition to the normal equipment, the parameter setting is also very important, if the parameter is not set properly, it will not be able to ...
|
|
Application characteristics of PLC in the control of mixing plant
1. High reliability
The PLC adopts a series of anti-interference methods in hardware and software, so that it can be directly installed in the industrial site and operate safely and reliably, anti-magnetic, anti-seismic and dust-proof.
2. Programming is simple and easy to grasp ...
|
|
Advantages and opportunities of domestic PLC - Xinjie PLC
At present, in the domestic PLC market, there are many kinds, but there are not many domestic PLC manufacturers with real strength, most of the domestic PLC is not an individual without legal person qualifications, or a single-chip microcomputer enthusiast, from the domestic PLC factory to buy the underlying programming code or buy a domestic PLC chip (the domestic P ...
|
|