Schneider inverter frequently asked questions

Create Date: 2024-8-30 12:03:23|Source: Schneider/Schneider

1. Schneider inverter uses analog output port to indicate the motor frequency, when the motor frequency is 50Hz, why is the output only 16mA?

Answer: Because of the large output frequency parameter "TFR" of the inverter, the factory default value is 60Hz. So when the inverter output is 50Hz, the analog output is 16mA. In this case, just change the "TFR" parameter to 50Hz.

                               Schneider inverter frequently asked questions

2. What is the basic equipment of the Schneider ATV71/61 inverter specification product powered by three-phase 380V power supply?

Answer: Chinese LCD screen: 15KW below optional accessories, 15KW above standard. DC incoming reactor: 0.75kw-15kw without built-in DC reactor, optional as an accessory when needed; The DC reactor of the standard product of more than 90KW is delivered with the inverter, and the user needs to assemble it according to the installation drawing, if the DC reactor is not ordered, add a "D" at the end of the model; 18.5KW-75KW has been built-in. EMC input filters: All have built-in EMC.

3. Why is the use of inverter for fan and pump loads to save energy?

Answer: According to the fundamental law of fluid mechanics, it can be known that the fan pump load is a typical square rotation load, and its main characteristics are: the speed n has the following relationship with the torque T and the load power P: T∝n2, P∝n3. That is, the torque is proportional to the square of the speed, and the power is proportional to the cube of the speed. Usually the fan pump load is mostly selected according to the amount of full load operation, and most of the time in actual use is not in the full load state, so as long as the average speed decreases slightly, the load power will drop very quickly, so as to achieve the effect of energy saving. But when choosing the motor direct starting mode, because the speed can not be adjusted, the wind baffle, the valve is commonly used to regulate the air volume or flow, so that not only the waste of power is formed, but also because the excessive starting current forms the power grid impact and the vibration and water hammer phenomenon of the equipment, when the frequency converter is selected to regulate the speed, the speed can be conveniently controlled according to the actual process demand. For example, when the motor speed is 80% of the extra speed, the load power is the third power of the extra power (80%), that is, about 50%. In this way, it can be seen that the speed is reduced by 20%, and the energy saving is more than 40%. Together, it can easily complete closed-loop constant voltage control, and the energy-saving power will be further improved. The use of inverter avoids the impact on the power grid when starting, reduces the equipment failure rate, eliminates the vibration and water hammer phenomenon, prolongs the service life of the equipment, and also reduces the capacity requirements and reactive power loss of the power grid.

4. How to complete the control of Schneider inverter ATV38 and ATV58 through the operation panel?

Answer: First of all, in the control menu, set "LCC" to "YES" (panel operation); Enter the "LFR" parameter in the adjustment menu, press the up and down keys to adjust the given value, and complete the control of the inverter.

5. How can multiple ATV71/61 inverters connected to the same bus communicate with a graphical display terminal?

Answer: [Communication] menu→ [Network MODBUS] → [MODBUS Address] (ADD) to set the address of each inverter. When multiple inverters are connected to the same display terminal, the terminal will actively display the inverter address. It is possible to access all menus in multipoint mode, but does not allow the graphical display of terminal control of the inverter.
More on that
Schneider selection of different types of circuit breakers Schneider selection of different types of circuit breakers

Schneider miniature circuit breakers are: A9 (iC65, iDPN, etc.), M9 (C65, DPN, C120, NG125, etc.), E9, OSMC32N/OSMC65H, etc Schneider molded case circuit breakers are: NSX, NSE, EZD, NSC, large plastic case NS Schneider structural circuit breakers have ...

Schneider online UPS power supply is energy-saving Schneider online UPS power supply is energy-saving

1. The need for stability When choosing UPS products, the customer's focus must be stability. For UPS, higher power means lower calorific value. Of course, only one of the primary factors that affect the internal temperature of the UPS is also to consider the heat dissipation planning of the machine itself. ...

Instrumentation overhaul points - Schneider Instrumentation overhaul points - Schneider

The test input does not conform to the "short" rule, and the problem is here. 1. Overhaul according to the comparator rules, fit it, the piece is good, and check the periphery; It doesn't fit, the piece is bad. 2. It does not fit the "virtual break" - there are ...

The layout of the inverter is composed of Schneider The layout of the inverter is composed of Schneider

rectifier Many converters use diodes, which convert the power frequency power supply to DC power. It is also possible to form a reversible converter with two sets of transistor converters, because the purpose of the power target is reversible and can be regenerated for operation. Flat wave back After the rectifier rectification ...

Precautions for Schneider to use USP power supplies Precautions for Schneider to use USP power supplies

(1) When using Schneider UPS power supply, the relevant provisions of the manufacturer's product manual should be strictly adhered to ensure that the front and zero line sequences of the mains connected by Schneider UPS meet the requirements. (2) The main intention of equipping Schneider UPS is to prevent the computer from losing information due to a sudden power failure...

Functions of input/output pins P0, P1, P2, P3 – Schneider Functions of input/output pins P0, P1, P2, P3 – Schneider

P0.0——P0. 7 : Port P0 is an 8-bit open-drain bidirectional I/O port. When visiting off-chip memory, it is time-shared for a low-8-bit address and an 8-bit bidirectional data bus. When EPROM is programmed, the instruction byte is input by P0, and when the program is verified, it outputs ...

Schneider inverter control circuit Schneider inverter control circuit

1. What is a control loop? The network that supplies the control signal to the main circuit that supplies power to the asynchronous motor (voltage and frequency can be adjusted) is called the control loop. Second, the composition of the control loop The control circuit is controlled by the frequency ...

The ultimate short-circuit breaking capacity of Schneider circuit breakers The ultimate short-circuit breaking capacity of Schneider circuit breakers

The limit short-circuit breaking ability (ICU) refers to the short-circuit current that can be turned on and broken under certain experimental parameters (voltage, short-circuit current, power factor) and through a certain experimental procedure, and after this on-off, it will no longer continue to carry its rated current. It's experiments ...

Line leakage detection method - Schneider Line leakage detection method - Schneider

Line leakage detection method, leakage check method summary, if a closing, leakage switch will trip, this kind of front leakage, check the method is as follows: 1. Disconnect all the separation gates, close the main gate, close the separation gates one by one, and close them to ...

Schneider circuit breaker technical issues Schneider circuit breaker technical issues

1. Overload maintenance failure: The circuit breaker should be tripped for maintenance when the current exceeds the rated current, but sometimes the overload maintenance failure may be due to some reasons. This may be due to incorrect overload maintenance settings, long overload periods, thermal aging due to successive overloads, etc. 2 ...

Schneider TRSS telemetry system solution Schneider TRSS telemetry system solution

Schneider Electric provides safe, reliable, end-to-end telemetry solutions to help you meet the challenges of long-distance operations. With an outstanding reputation in the fields of appearance, manipulation and data collection, wireless communications, IT, and other industries and common sense, Schneider Electric telemetry system solutions can help ...

Schneider inverter simple question Schneider inverter simple question

1. How to complete the control of ATV38 and ATV58 through the operation panel? First, in the control menu, set "LCC" to "YES" (panel operation); Enter the "LFR" parameter in the adjustment menu, press the up and down keys to adjust the given value, and complete the control of the inverter. ...

Pay attention to the problem when using UPS power supply - Schneider Pay attention to the problem when using UPS power supply - Schneider

1. The parameters set in the host cannot be changed at will during use. In particular, the parameters of the battery pack will directly affect the service life. With the change of ambient temperature, the float charge voltage should be adjusted accordingly. Generally, 25 °C is the standard, and when the ambient temperature rises or falls by 1 °C, the float charge ...

Troubleshooting methods in electrical circuit control - Schneider Troubleshooting methods in electrical circuit control - Schneider

The troubleshooting method of the electrical control line is not the same as a thousand people, and various methods can be used cooperatively, but do not copy the rigid set. In general, investigative research can help us to find out the problem. The experimental method can not only find out the fault phenomenon, but also find the fault location or fault circuit; Logic...

Schneider UPS power supply installation precautions Schneider UPS power supply installation precautions

The quality of UPS power supply devices directly affects the long-term operation of the UPS system in the future, especially the large and medium-sized UPS power supplies, so the large and medium-sized UPS power supplies should be standard in the process of planning to the device. Generally speaking, UPS power supply ...

Schneider inverter ATV32 acceleration and deceleration operation method Schneider inverter ATV32 acceleration and deceleration operation method

1. Use the operation method of clicking the button: In addition to the direction of travel, 2 logic inputs are required to add a speed given, e.g. LI5 is assigned the acceleration function, and LI6 is assigned the deceleration function. Then pressing LI5 will make the speed given increase, and pressing LI6 will make the speed given speed decrease ...

Frequency converters and their control – Schneider Frequency converters and their control – Schneider

AC inverter is the result of the high development of microcomputer and modern power electronics technology. The microcomputer is the center of the inverter, and the power electronics form the main circuit of the inverter. As we all know, the frequency of communication electricity sent from power plants is stable and constant, in our country it is 50 weeks per second ...

Two of Schneider's low-voltage power distribution products won the Germany Red Dot Award Two of Schneider's low-voltage power distribution products won the Germany Red Dot Award

Beijing, China, April 6, 2022 – Recently, the list of "Red Dot Planning Awards", known as one of the world's three cutting-edge industrial planning awards, was grandly announced in Germany.

Maintenance of Schneider circuit breakers Maintenance of Schneider circuit breakers

In order to keep the main Schneider circuit breaker in excellent operating condition, it is necessary to strengthen the maintenance management. 1. Insist that the air is moist or unclean, and the pipes are not clean, may have the following consequences: (1) The wet gas is decomposed into mixed gases such as hydrogen and oxygen under the action of electric arc, which damages the ...

Schneider's method of improving the power factor of UPS power supplies Schneider's method of improving the power factor of UPS power supplies

One. The significance of the progressive power factor. 1. Make full use of the ability of power equipment. Each power supply unit has additional capacity, i.e. depending on the power. The total power output of the power supply equipment S, - part of the active power, the other part is the reactive power, the smaller the ...

CATEGORIES BYPASS
Customer Service Center

Online Consultation:QQ


ContactContact

Contact: Manager Huang

Contact QQ: 3271883383

Contact number: 13522565663


Scan the code to add WeChat (please save the picture first on the mobile phone)

working hoursworking hours

Weekdays: 9:00-17:00

Holidays: Only emergencies are handled

Contact us

Contact us

Contact number QQ consultation
QQ consultation

3271883383

Company address
Back to top