Schneider ATV312 inverter failure

Create Date: 2024-8-30 12:03:23|Source: Schneider/Schneider

1. OLF is motor overload.

Possible reasons: 1. Triggered by high motor current. 2. The value of the [cold stator resistance] (rSC) parameter is wrong.

Corrective measures: 1. Check the [Motor Thermal Current] (ItH) setting of the motor thermal maintenance function and check the motor load. Wait for the drive to cool down before restarting. 3. Re-measurement, [cold stator resistance] (rSC).

                              Schneider ATV312 inverter failure

2. PHF is the input phase loss.

Possible reasons: 1. The power supply of the inverter is wrong or a fuse is blown out. 2. There is a problem with a certain phase. 3. Use three-phase ATV312 on a single-phase line power supply

3. The load is unbalanced.

This maintenance function is only for on-load drives.

Corrective measures: 1. Check the power connection and fuse. 2. Reset. 3. Use a three-phase line power supply. 4. Disable the detection function by setting the following:

[Input Missing Phase] (IPL)=[No],(nO)([Fault Management](FLt-) menu.

3. bLF is a brake control fault.

Possible reasons: 1, the brake release current is not reached. 2. When the braking logic control is assigned, only the closing frequency threshold [brake closure frequency] (bEn) is adjusted.

Repair method: 1. Check the wiring of the inverter/motor. 2. Check the motor windings. 3. Check the settings for [Forward Brake Release Current] (IBR) and [Reverse Brake Release Current] (IRD). 4. Apply the referral settings of [ Brake Closure Frequency] (bEn).

More on that
Pay attention to the problem when using UPS power supply - Schneider Pay attention to the problem when using UPS power supply - Schneider

1. The parameters set in the host cannot be changed at will during use. In particular, the parameters of the battery pack will directly affect the service life. With the change of ambient temperature, the float charge voltage should be adjusted accordingly. Generally, 25 °C is the standard, and when the ambient temperature rises or falls by 1 °C, the float charge ...

Schneider inverter ATV32 book type performance and advantages Schneider inverter ATV32 book type performance and advantages

Schneider ATV32 book inverter has built-in programmable controller function, flexible and intelligent; Integrated safety functions, 30% cost savings compared with external security modules; First-class Schneider patented synchronous motor open-loop control technology; Book-type design, support side-by-side installation, space-saving; Many...

Schneider PLC signal light meaning Schneider PLC signal light meaning

Take the Schneider PLC with model number TWDLCAA40DRF as an example: The first PWR: is the meaning of power supply; The second RUN: is the PLC operation indicator; Long dark: The application is not fulfilling; Shine: The controller is in a stay or a mistake in performance; Solid on: The controller is in operation ...

Schneider Modicon M100 Programmable Controller Features and Benefits Schneider Modicon M100 Programmable Controller Features and Benefits

The Schneider Electric Modicon M100 programmable controller is part of the Easy Series and is suitable for simple I/O logic control machines. characteristic AC power supply High-speed processor with 0.2μs/boolean amount Built-in a ...

The difference between Schneider verification, calibration, and calibration The difference between Schneider verification, calibration, and calibration

What is the difference and contact between the instrument, external work verification, calibration, and calibration? Verification, calibration, and calibration are all static measurement processes that are carried out in cycles. The meanings are: The verification ---- shall be arranged by the legal metrology department or the statutory authorization in accordance with the verification procedures, after ...

Schneider inverter disturbance and treatment method Schneider inverter disturbance and treatment method

A. Methods of Communication: (1) Radiation disturbance (2) Conduction disturbance B. Immunity Methods With regard to nuisance signals transmitted by radiation methods, they are primarily weakened by wiring and shielding the radioactive source and the disturbed lines. About Tong ...

Schneider Multi9 Series C120 FAQs Schneider Multi9 Series C120 FAQs

1. What are the characteristic curves of Schneider Multi9 series C120L? A: C/D curve. 2. What is the rated current level of Schneider Multi9 series C120? A: 63A, 80A, 100A, 125A. 3. Shi ...

Schneider inverter series at a glance Schneider inverter series at a glance

1. ATV11 series The Schneider ATV11 series is primarily used in three-phase asynchronous motor inverters with a power range of 0.18 to 2.2 kW. 2. ATV12 series ATV12 Schneider inverter for power scale 0.18k...

Features of Schneider's different PLC series Features of Schneider's different PLC series

Schneider PLC series mainly includes: Schneider NEZA PLC (Schneider TSX08 series); Schneider Quantum PLC (Schneider 140 series); Schneider Micro PLC (Schneider TSX37 series); Schneider Premium PLC (Schneider TSX...

Technical causes of Schneider low-voltage circuit breaker accidents Technical causes of Schneider low-voltage circuit breaker accidents

(1) Operational failure Operation failure is manifested by the dragging or misoperation of the circuit breaker. Because the fundamental and important function of the high-voltage circuit breaker is to act correctly and quickly remove the fault of the power grid. If the circuit breaker is dragged or misoperated, it will pose a serious threat to the power grid, first of all: (1) expansion ...

Inverter trip protection circuit – Schneider Inverter trip protection circuit – Schneider

After the maintenance function of the inverter is caused by the operation of the problem, it will trip immediately, and the fault code will be displayed together, and the tripping alarm indication circuit of the peripheral inverter will send out an audible and visual alarm to remind the operator to clean up the problem in time. Inverter hopping ...

The difference between Schneider and Siemens PLC The difference between Schneider and Siemens PLC

There are three main differences, namely: different uses, different products, and different characteristics. 1. Different use cases: The programmable manipulator produced by Siemens in Germany is also widely used in China, and has been used in metallurgy, chemical industry, printing production lines and other fields.

Schneider appeared at the 5th China Power Distribution Technology Summit Forum Schneider appeared at the 5th China Power Distribution Technology Summit Forum

Beijing, China, September 14, 2020 – Today, the 5th China Power Distribution Technology Summit Forum 2021, held by China Electric Power Research Institute Co., Ltd. and the Science and Technology Development Service Center of China Electric Power Council, opened in Beijing. The theme of this forum is "Supporting the Strategic Policy of Carbon Peaking and Carbon Neutrality, Building a ...

The selection method of inverter power - Schneider The selection method of inverter power - Schneider

The system power is equal to the product of the inverter power and the motor power, as long as both are operating at a higher power, the system power is higher. From the power point of view, when selecting the power of the inverter, the following points should be noted: ...

Schneider XPS safety control module selection method Schneider XPS safety control module selection method

(1) Evaluate the safety control level that the machinery and equipment need to reach (2) Confirm the type of input signal to be monitored and (3) the number of input signals that need to be monitored (4) The number and type of channels that the module needs to output (5) Whether it is necessary to control the output device (such as ...

The upper and lower frequency parameters of the inverter - Schneider The upper and lower frequency parameters of the inverter - Schneider

The output frequency of the inverter set by the user according to the needs of the production process. For example: the original power frequency power supply of the fan motor is now transformed into frequency conversion speed regulation, you can set the given frequency to 50 Hz, and there are two ways to set it: one is to use the operation panel of the inverter to input the digital quantity of the frequency 5 ...

Is there a restriction on the installation direction when Schneider installs the inverter? Is there a restriction on the installation direction when Schneider installs the inverter?

It should be basically stored in the plate, the problem is that the plate with a fully enclosed structure is large, takes up a lot of space, and the cost is relatively high. This can be done by: (1) The planning of the disc should be based on the heat dissipation required by the actual device; (2) Profit ...

Whether an AC circuit breaker can be used in a DC circuit Whether an AC circuit breaker can be used in a DC circuit

Schneider circuit breakers are used to open and break communication loops. The arc extinguishing of the communication system is simple, but the arc extinguishing of the DC system is more difficult. Because the system is different and the arc extinguishing principle is different, there is a big difference in structure and performance between the communication circuit breaker and the DC circuit breaker. Compared with the communication circuit breaker, the DC circuit breaker ...

Input/output pins P0, P1, P2, P3 functions Input/output pins P0, P1, P2, P3 functions

P0.0——P0. 7 : Port P0 is an 8-bit open-drain bidirectional I/O port. When visiting off-chip memory, it is time-shared for a low-8-bit address and an 8-bit bidirectional data bus. When EPROM is programmed, the instruction byte is input by P0, and when the program is verified, it outputs ...

The inverter controls the direction of the motor – Schneider The inverter controls the direction of the motor – Schneider

If the direction of rotation at this moment is opposite to the steering required by the equipment, please put F0-13=1 or after power-off (note that the main capacitor charge discharge of the inverter is over), the UVW output line of the inverter ...

CATEGORIES BYPASS
Customer Service Center

Online Consultation:QQ


ContactContact

Contact: Manager Huang

Contact QQ: 3271883383

Contact number: 13522565663


Scan the code to add WeChat (please save the picture first on the mobile phone)

working hoursworking hours

Weekdays: 9:00-17:00

Holidays: Only emergencies are handled

Contact us

Contact us

Contact number QQ consultation
QQ consultation

3271883383

Company address
Back to top