The selection method of inverter power - Schneider

Create Date: 2024-8-30 12:03:23|Source: Schneider/Schneider

The system power is equal to the product of the inverter power and the motor power, as long as both are operating at a higher power, the system power is higher. From the power point of view, when selecting the power of the inverter, the following points should be noted:

                               The selection method of inverter power - Schneider

1) The power value of the inverter is the most suitable for the power value of the motor, so that the inverter can work under high power value.

2) If the power classification of the inverter is not in step with the power classification of the motor, the power of the inverter should be as close to the power of the motor as possible, but it should be slightly greater than the power of the motor.

3) When the motor is frequently started and braked or is in heavy load starting and frequent operation, a larger inverter can be selected to use the inverter for long-term and safe operation.

4) After testing, the actual power of the motor is indeed sufficient, and the inverter with a power less than the power of the motor can be considered, but it is necessary to pay attention to whether the instantaneous peak current will cause overcurrent protection action.

5) When the power of the inverter and the motor are not together, the setting of the energy-saving program must be adjusted accordingly to achieve a higher energy-saving effect.

More on that
Schneider introduces the new Lexium28S servo Schneider introduces the new Lexium28S servo

The newly launched Lexium28S Sercos III bus servo with BCH2 servo motor is available as a pre-order product portfolio to meet the needs of motion control and optimize the function of the machine. Lexium28S servo drives, available in 4 sizes, 10 models, power mask 0.05KW to 4 ...

How Schneider contactors work How Schneider contactors work

How it works Contactor refers to an electrical appliance that uses a coil to flow through an electric current to generate a magnetic field, so that the contact is closed, and then the load can be controlled. Because it can quickly block the main circuit and frequently connect with the equipment of the high-current control circuit, it has been used in electrical engineering.

Detailed explanation of the steps of Schneider inverter inverter setup Detailed explanation of the steps of Schneider inverter inverter setup

1. Macro equipment: In view of the control requirements of different loads, Schneider inverters have talked about the macro equipment in advance and the initial function of the I/O terminals. Changes to the macro rig can be corrected under the Abbreviated Boot Menu. If required, it is also possible to re-equip the end separately ...

Schneider UPS Energy Saving Method Schneider UPS Energy Saving Method

1. Flexible planning for on-demand expansion Generally, the construction of data centers is not in one step, and the expansion of the next few years will be considered, and the UPS capacity is generally considered to be larger in the design.

Precautions for motor operation over 60Hz - Schneider Precautions for motor operation over 60Hz - Schneider

What problems should be paid attention to when the motor works beyond 60Hz? The following precautions should be taken when operating beyond 60Hz (1) Machinery and equipment should have sufficient potential to work at this speed (mechanical strength, noise, vibration, etc.). (2) ...

Schneider improves plant performance with automated control Schneider improves plant performance with automated control

1. Engineering planning one by oneWith data at their fingertips and intelligent and sensitive functions, engineers can easily plan and test equipment, improve process availability, and easily complete system integration together – ultimately reducing the planning time by up to 25%. ...

Inverter power settings, waveform test issues Inverter power settings, waveform test issues

1. After the inverter is repaired, the power number demand is corrected, don't forget Generally, an inverter corresponds to a power number (also known as the number of horsepower), for example, a 75 kilowatt inverter is set under heavy load, and 100 kilowatts is set under light load. In this way, the customer will not use it to present ...

Schneider inverter motor control mode Schneider inverter motor control mode

Fundamentals of magnetic flux vector manipulation The control of a three-phase asynchronous motor is much more messy than that of a DC motor because the current, voltage, induced potential, magnetic flux, etc., of the stator and rotor are all alternating. However, the stator winding of the three-phase asynchronous motor is a symmetrical three-phase winding, which exerts a ...

Common analysis method for electrical control line faults - Schneider Common analysis method for electrical control line faults - Schneider

1) Survey and research method. The investigation and research method is to understand the obvious problem phenomena through "seeing", "listening", "smelling", "touching" and "asking"; After visiting the operator, understand the cause of the failure; A common way to help find the fault point after asking others or consulting information ...

Schneider appeared at the 5th China Power Distribution Technology Summit Forum Schneider appeared at the 5th China Power Distribution Technology Summit Forum

Beijing, China, September 14, 2020 – Today, the 5th China Power Distribution Technology Summit Forum 2021, held by China Electric Power Research Institute Co., Ltd. and the Science and Technology Development Service Center of China Electric Power Council, opened in Beijing. The theme of this forum is "Supporting the Strategic Policy of Carbon Peaking and Carbon Neutrality, Building a ...

Schneider instrumentation maintenance precautions Schneider instrumentation maintenance precautions

1. When assembling and adjusting the appearance, the original position should be recorded for rehabilitation. 2. When repairing the appearance of precision instruments, if you accidentally bounce small parts away, you should first determine the position where you can fly down.

Introduction to Schneider limit switch series Introduction to Schneider limit switch series

1. XCKN compact limit switch Light and medium load use; Waist-shaped device holes for easy adjustment of mechanical errors; Bipolar isolation definitely disconnects the contacts; External waterproof sealing joint, the protection level is higher than that of rubber sleeve sealing pipe; Engineering plastic body, avoid temperature ...

Two of Schneider's low-voltage power distribution products won the Germany Red Dot Award Two of Schneider's low-voltage power distribution products won the Germany Red Dot Award

Beijing, China, April 6, 2022 – Recently, the list of "Red Dot Planning Awards", known as one of the world's three cutting-edge industrial planning awards, was grandly announced in Germany.

Is there a restriction on the installation direction when Schneider installs the inverter? Is there a restriction on the installation direction when Schneider installs the inverter?

It should be basically stored in the plate, the problem is that the plate with a fully enclosed structure is large, takes up a lot of space, and the cost is relatively high. This can be done by: (1) The planning of the disc should be based on the heat dissipation required by the actual device; (2) Profit ...

Heat dissipation strategy for frequency converters – Schneider Heat dissipation strategy for frequency converters – Schneider

Drives power and operate commercial and industrial motors, and thermal protection is necessary in accordance with their planning and operating environment. The main advantages of the frequency converters are flexible handling, smooth start-up and shutdown functions, and significant energy savings due to centrifugal fans and pumps operating under variable loads. ...

Schneider maintains the UPS power supply to extend the service life Schneider maintains the UPS power supply to extend the service life

Take charge of the basic knowledge of UPS power supply, read the equipment manual attentively, clarify the meaning of various warning signals, warning codes, command lights, and the causes of occurrence and how to deal with them to understand the effects of various switches and buttons of the equipment. Understand the various operations in charge of UPS power supply, understand the connection connection, and understand the method of substitution ...

Inverter selection and capacity matching method - Schneider Inverter selection and capacity matching method - Schneider

How to carry out the selection of inverter normally, is the difficulty faced by many enterprise technical personnel and business personnel, in addition, the selection of the inverter body alone, without considering whether the inverter selection and capacity matching is appropriate, is also unscientific. ...

Schneider miniature circuit breaker C type D type difference Schneider miniature circuit breaker C type D type difference

The difference between Schneider OSMC32N3D10 and OSMC32N3C10 After type comparison, one is Schneider D10A and the other is Schneider C10A. Schneider circuit breaker type D, suitable for power equipment, such as motor load, air conditioner, etc.; Schneider circuit breaker type C, suitable ...

"Five Ways" to Solve Life Sciences Industry Challenges – Schneider "Five Ways" to Solve Life Sciences Industry Challenges – Schneider

In life sciences careers, equipment performance is critical to ensuring business continuity and useful production time. The main challenges faced by the industry include: maintaining the positive impact of environmental parameters on product quality, managing multiple systems in a "siloed" state, and using existing infrastructure sensitively and efficiently.

How to operate the transformer DC resistance tester – Schneider How to operate the transformer DC resistance tester – Schneider

1. The instrument test has a total of YN winding three-phase test, YN winding three-phase phase-by-phase test, low-voltage winding magnetization method test of iron-core five-column low-voltage angular transformer, low-voltage winding phase selection test and general four-terminal method of ironcore three-column low-voltage angular transformer. ...

CATEGORIES BYPASS
Customer Service Center

Online Consultation:QQ


ContactContact

Contact: Manager Huang

Contact QQ: 3271883383

Contact number: 13522565663


Scan the code to add WeChat (please save the picture first on the mobile phone)

working hoursworking hours

Weekdays: 9:00-17:00

Holidays: Only emergencies are handled

Contact us

Contact us

Contact number QQ consultation
QQ consultation

3271883383

Company address
Back to top