Hollysys DCS – the steps for DCS to properly power off and power on

Create Date: 2024-8-30 12:03:23|Source: HollySys/HollySys

DCS is properly blacked out

When the DCS needs to be powered off for maintenance due to overhaul or other reasons, we often directly power off the DCS, but sometimes this non-standard operation will bring serious consequences, such as configuration loss, PID parameter loss, etc. Therefore, it is necessary to strictly check the important parameters before and after the power failure and re-powering, and operate carefully and standardly.

Step 1: Carry out various checks before the power is off

1. Open the cabinet door of the control station and observe whether the card is working properly and whether there is a fault display;

2. Observe whether there is a fault from the fault diagnosis of real-time monitoring of each operation station, and record it;

3. Check whether the power box is working normally, whether the power supply fan is working, whether the 5V and 24V indicators are normal, and measure and record the voltage values;

4. Back up configuration, PID parameters, drivers and other important data required;

5. Check the power supply redundancy, which includes AC power supply redundancy and DC power supply redundancy. AC power redundancy: By disconnecting the redundant AC - 220VAC incoming line separately, half of the AC power supply loop of the system loses power, but the system should still work normally. The DC power supply redundancy test method is as follows: (1) Break the power supply of one power box first, and measure the voltage of 5V and 24V on the power terminal of each cage motherboard;  (2) First turn on the power supply of the last power box, then disconnect the power supply of the other power box, and then measure the voltage of 5V and 24V on the power terminal of each cage motherboard. The 5V output voltage of the power box should be between 5.10V and 5.25V, and the output voltage of the 24V power box should be between 23.00V and 25.00V. If the voltage deviation is large, it needs to be checked and processed in time, otherwise it will affect the normal operation of the card.

6. Check the network cable and layout, check the on-off of the network cable, confirm whether the connection is in good contact, and replace the faulty cable in time;  7. UPS test: test the UPS battery power supply capacity by disconnecting the UPS AC incoming line. The UPS battery should be discharged regularly, it is generally recommended to discharge once a month, discharge method: disconnect the UPS AC power supply and use battery power supply until the battery is about to be released.

The above inspection is mainly to understand the operating status of the system in advance, and if there is any abnormal phenomenon, it can be solved in time when stopping.

Step 2: Cut off the power supply in order

1. After each operation station exits the real-time monitoring and operating system in turn, turn off the power supply of the industrial computer and display of the operation station;

2. Turn off the power supply of the power box of the control station one by one;

3. Turn off the power switch of each branch;

4. Turn off the power switch of uninterruptible power supply (UPS);

5. Turn off the main power switch.

DCS outage repairs

Step 3: Carry out DCS power outage maintenance

1. The operation station and control station are purged and overhauled in a power failure. Including dust cleaning inside the industrial computer, control station cage, power box and other components;

2. Maintain the faults detected before the power failure;

3. Overhaul of system power supply lines. Including distribution boxes, terminal strips, relays, safety barriers, etc. Ensure that all components work properly and the lines are reliably connected;

4. Grounding system overhaul. Including terminal inspection, grounding inspection of each operation station (industrial computer, display), grounding inspection of each control station (power supply, cage), and ground resistance test;

5. Check the connection lines and connection points of communication lines to ensure that all components work normally and the lines are connected reliably. Mark the dual network cables.

The DCS is powered on correctly

Step 4: After the on-site and DCS maintenance work is completed, check whether the re-power-on conditions are met. The person in charge of system maintenance can only power on after confirming that the conditions are met, and the overall power-on of the system is carried out according to the following steps:

1. First of all, close the main circuit breaker of the distribution box and check whether the output voltage meets the 220V±10%;

2. Close the circuit breakers of each branch in the distribution box and check the output voltage respectively;

3. If it is equipped with UPS or stabilized power supply, please check whether the output voltage of UPS or stabilized power supply is normal, find the cause if it is abnormal, and continue the following steps of powering on the control station and operating the station after recovery.

Step 5: The control station is powered on, and the DCS power supply is powered on sequentially

Step 6: The operation station is powered on, and the display, industrial computer and other equipment of the operation station are powered on

Step 7: Conduct a DCS re-commissioning inspection

1. Open the cabinet door of the control station and observe whether the card is working properly and whether there is a fault display;

2. Observe whether there is a fault from the fault diagnosis of real-time monitoring of each operation station, mainly including card failure and communication fault prompt;

3. Whether the power box is working normally, whether the power supply fan is working, whether the 5V and 24V indicators are normal, and whether the power supply voltage is measured is normal;

4. Check the network communication, configuration operation, PID parameters, etc. of each layer.
Hollysys DCS – the steps for DCS to properly power off and power on

More on that
Hollysys PLC - several common types of PLC control systems Hollysys PLC - several common types of PLC control systems

1. Stand-alone control system The stand-alone control system is controlled by one PLC to control one device or one simple production line, as shown in Figure 7-1. The composition of the stand-alone control system is simple, the number of I/O points required is less, the storage capacity is small, and when the model of PLC is selected, whether there is a communication network at present.

Hollysys was invited to participate in the 2023 China Petroleum and Chemical Industry Digital Transformation and Intelligent Development Conference and delivered a keynote speech Hollysys was invited to participate in the 2023 China Petroleum and Chemical Industry Digital Transformation and Intelligent Development Conference and delivered a keynote speech

On March 15, the 2023 China Petroleum and Chemical Industry Digital Transformation and Intelligent Development Conference was held in Tai'an, Shandong. The conference aims to strengthen the construction of "intelligent oil and gas fields, intelligent petrochemicals, intelligent chemicals and intelligent oil and gas pipeline networks", and lead China's petroleum and chemical industry to achieve intelligent transformation.

Hollysys DCS - the connection method between thermocouple and DCS Hollysys DCS - the connection method between thermocouple and DCS

1. The thermocouple uses a compensation wire, and there can be a node in the middle, but the corresponding compensation cable must be used to directly connect to the DCS thermocouple module, such as the LLMUX card in HONEYWELLTPS. Minimize nodes to reduce interference. In addition, in the DCS configuration, it is necessary to select the corresponding thermocouple model, and supplement the ...

Hollysys DCS - How to deal with DCS system failure? Hollysys DCS - How to deal with DCS system failure?

1. View the data on the monitoring screen When the following situations occur, it means that there is a problem with the control system, and the microcomputer maintenance personnel should be notified immediately for maintenance, and the operator should go to the site to deal with it. (1) Frequently changing data does not change for a long time, and several or all data do not ...

Hollysys PLC - the design specification of PLC program Hollysys PLC - the design specification of PLC program

(1) Select the appropriate PLC model and I/O points, and select the special function module when there are special function requirements. (2) Familiar with the selected PLC programming instructions and compilation software. (3) Carry out soft component planning, including internal relays, holding relays, data registers, ...

Hollysys DCS - Introduction to I/O in DCS control system Hollysys DCS - Introduction to I/O in DCS control system

The control system needs to establish the input and output channels of the signals, which is called I/O. The I/O in a DCS is generally modular, with one or more I/O channels on one I/O module for connecting sensors and actuators (control valves). The control unit of the DCS: a process control station is ...

and Lisi PLC - the difference between PLC and inverter and Lisi PLC - the difference between PLC and inverter

1. The role is different A PLC (Programmable Logic Controller) is an electronic system designed for digital operations in an industrial environment. The inverter is the application of frequency conversion technology and microelectronics technology to control the AC motor by changing the frequency of the motor working power supply.

Hollysys PLC - What are the applications of PLC in CNC machine tools? Hollysys PLC - What are the applications of PLC in CNC machine tools?

1. The application form of PLC in CNC machine tools PLC is used in CNC machine tools, and there are usually two forms: one is called built-in: the other is called free-standing. Built-in PLC is also known as integrated PLC, the CNC system in this way, at the beginning of the design of the NC and PLC combined ...

Hollysys DCS - What are the four contents of DCS spare parts management? Hollysys DCS - What are the four contents of DCS spare parts management?

DCS spare parts In the process of using the DCS control system, its management is more important. The requirements of general DCS spare parts management are summarized in four aspects: storage, inspection, preparation for use, and use. 1. Storage DCS system, spare module storage should meet the requirements ...

Hollysys will make a blockbuster appearance at the first Shenzhen Nuclear Expo in 2022 Hollysys will make a blockbuster appearance at the first Shenzhen Nuclear Expo in 2022

From November 15th to 17th, the 2022 China Nuclear Energy High-Quality Development Conference and Shenzhen International Nuclear Energy Industry Innovation Expo (hereinafter referred to as the "2022 Shenzhen Nuclear Expo") will be grandly reopened at the Shenzhen World Convention and Exhibition Center.   The theme of this year's Nuclear Expo is "Nuclear Gathering in the Bay Area, Activating the World".

Hollyps PLC - the control method of PLC and frequency converter connection Hollyps PLC - the control method of PLC and frequency converter connection

1. Use the analog output module of the PLC to control the analog output module of the inverter The analog output module of the PLC outputs a 0-5V voltage signal or a 4-20mA current signal, which is used as the analog input signal of the inverter to control the output frequency of the inverter. This control method is simple to wiring, but it needs to be selected and changed.

HollySys PLC - What are the design requirements that need to be met for PLC programs? HollySys PLC - What are the design requirements that need to be met for PLC programs?

Simplicity Make the PLC program as simple as possible. Simplicity means using a standardized procedural framework as much as possible and using simple instructions as much as possible. If you want the program to be simple, in a big way, you should optimize the program structure, simplify the program with process control instructions, and ...

Hollysys PLC - common causes and treatment methods of PLC failures in operation Hollysys PLC - common causes and treatment methods of PLC failures in operation

1. Peripheral circuit component failure This type of failure often occurs in the failure of the PLC after a certain period of work. In the PLC control loop, if there is a component damage fault, the PLC control system will immediately and automatically stop working. The input circuit is a PLC that accepts switching quantities, analog ...

What should be paid attention to when cooperating with Lysys PLC-PLC and inverter? What should be paid attention to when cooperating with Lysys PLC-PLC and inverter?

1. Input of switch command signal The input signal of the inverter includes a switch-type command signal that controls the operating status such as operation/stop, forward/reverse, section speed, and joging. Frequency converters usually make use of relay contacts or components with relay contact switching characteristics (such as crystals).

Hollysys PLC - the control function of PLC Hollysys PLC - the control function of PLC

(1) Computing function The computing functions of a simple PLC include logic operation, timing and counting functions; The operation functions of ordinary PLC also include data shift, comparison and other calculation functions; More complex arithmetic functions include algebraic operations, data transmission, etc.; There are also analog PIDs in large PLCs.

Hollysys PLC - How to maintain the PLC control cabinet? Hollysys PLC - How to maintain the PLC control cabinet?

1. Data backup When carrying out maintenance, we must cut off the power, data backup between power outages is an important link, for the data that needs to be archived for a long time, you can back up the historical trend data to the mobile hard disk, and then turn off the Windows-based operating system (Note...

Hollysys PLC - Calculation of the amount of pulses in PLC Hollysys PLC - Calculation of the amount of pulses in PLC

The control of pulse amount is mostly used for angle control, distance control, position control and so on of stepper motor and servo motor. The following is an example of a stepper motor to illustrate each control mode. 1. Angle control of stepper motor. First of all, it is necessary to clarify the number of subdivisions of the stepper motor, and then determine the stepper ...

Hollysys won the 2022 China Intelligent Transportation Association Science and Technology Award" Hollysys won the 2022 China Intelligent Transportation Association Science and Technology Award"

On October 18, 2022, the China Intelligent Transportation Association released the list of winners of the "2022 China Intelligent Transportation Association Science and Technology Award", which includes the Science and Technology Progress Award, the Technology Invention Award, and the Outstanding Innovative Talent Award. Among them, Beijing Hollysys System Engineering Co., Ltd. ...

Troubleshooting steps of Hollysys DCS system Troubleshooting steps of Hollysys DCS system

The steps of DCS system troubleshooting include: (1) Check the fault caused by improper use. Common types of operational faults include operator errors, terminal wiring faults, module installation faults, and power supply failures. (2) Troubleshoot the improper operation of the DCS system ...

Hollysys DCS control system configuration process Hollysys DCS control system configuration process

1. Preliminary preparations Engineering configuration is operated at the engineer station, and before engineering configuration, it is necessary to have the necessary tools and information, specifically: Tools: refers to the hardware environment and software environment used in engineering configuration, usually refers to the ...

CATEGORIES BYPASS
Customer Service Center

Online Consultation:QQ


ContactContact

Contact: Manager Huang

Contact QQ: 3271883383

Contact number: 13522565663


Scan the code to add WeChat (please save the picture first on the mobile phone)

working hoursworking hours

Weekdays: 9:00-17:00

Holidays: Only emergencies are handled

Contact us

Contact us

Contact number QQ consultation
QQ consultation

3271883383

Company address
Back to top