Hollysys PLC - common causes and treatment methods of PLC failures in operation

Create Date: 2024-8-30 12:03:23|Source: HollySys/HollySys

1. Peripheral circuit component failure

This type of failure often occurs in the failure of the PLC after a certain period of work. In the PLC control loop, if there is a component damage fault, the PLC control system will immediately and automatically stop working.

The input circuit is the port of the PLC to accept the input signals such as switching quantity and analog quantity, and the quality of its components, wiring mode and whether it is reliable are also important factors affecting the reliability of the control system.

For the switching output, the output of the PLC has three forms: relay output, thyristor output, transistor output, and the specific choice of which form of output should be decided according to the load requirements, and the improper selection will reduce the reliability of the system When it is serious, the system can not work normally.

In addition, the load capacity of the output terminal of the PLC is limited. If the stated maximum limit is exceeded. An external relay or contactor must be connected. to work properly.

The quality of actuators such as external relays, contactors, and solenoid valves is an important factor affecting the reliability of the system. Common faults include short circuits in the coil, mechanical failures that cause immobility of the contacts or poor contact.

2. Poor terminal wiring contact

This kind of fault occurs after the PLC has been working for a certain period of time with the increase in the frequency of equipment action. Due to the defects in the wiring of the control cabinet or the intensification of vibration in use and the mechanical life, the terminal posts of the terminals or components are easy to loosen and cause poor contact.

The method of troubleshooting this kind of fault is to use a multimeter, with the help of the control system schematic diagram or PLC logic ladder diagram for fault diagnosis and maintenance.

For the wiring of some important peripheral terminals, in order to ensure reliable connection, the method of soldering cold-pressed sheets or cold-pressed pins is generally used.

3. Functional failure caused by PLC interference

The various types of PLCs used in automation systems are control devices specially designed for industrial production environments. In the design and manufacturing process, multi-level anti-interference and selected component measures are adopted, so it has a strong ability to adapt to harsh industrial environments, operational stability and high reliability. Therefore, it can generally be used directly in an industrial environment without any special measures. The interference experienced by the PLC can be divided into external interference and internal interference.

In the actual production environment, external interference is random, independent of the system structure, and the source of interference cannot be eliminated and can only be limited on a case-by-case basis.

Internal interference is related to the structure of the system. It is mainly caused by the AC main circuit and analog input signal in the system, and the internal interference can be suppressed to the greatest extent through careful design of system circuits or system software filtering.

Anti-interference technical measures at PLC production site - usually from four aspects: power supply and grounding protection, wiring arrangement, shielding and noise resistance:

(1) Power supply and grounding protection

The anti-interference ability of the PLC itself is generally very strong. Usually. Separate the power supply of the PLC from the power supply of the system for the interference of the power line, which generally has a strong enough suppression ability.

However, the power supply interference is particularly serious, and a shielded isolation transformer can be added to reduce the interference between the equipment and the ground and improve the reliability of the system. If a system contains expansion units, their power supply must share a switch control with the base unit, i.e., they must be powered on and off at the same time.

In order to suppress the interference attached to the power supply and the input and output terminals, the PLC should be connected to the special ground wire The diameter of the ground wire should be thick enough. The ground resistance should be less than 4 Ω, the ground point should be as close to the PLC as possible, and the ground point should be separated from other equipment. For the strong current equipment in the power supply system, the metal components such as the shell, cabinet, frame, base and operating handle must be protected and grounded.

The internal circuitry of the PLC includes the CPU, memory and other interfaces that are connected to the digital ground. The external circuit includes A/D, D/A, etc., which are co-connected to analog ground, and the PLC base plate is connected with the central grounding point star with a thick copper wire to prevent dole interference. When the PLC is not grounded, the mounting bracket of the PLC should be capacitively grounded to suppress electromagnetic interference.

(2) Wiring arrangement

Routing of wiring in the electrical cabinet

(1) Only the shielded analog input signal line can be installed in the same line slot as the digital signal line, and the DC voltage digital signal line and the analog signal line cannot be in the same line slot as the AC voltage line.

(2) Only shielded 220V power cables can be installed in the same trunking as signal cables.

(3) The shielding of the cable plug of the electrical cabinet must be reliably grounded.

Electrical cabinet external wiring arrangement

(1) The digital signal line and analog signal line of DC and AC voltage must use independent cables and shielded cables.

(2) The signal cable can be installed in the first line slot together with the power cable, and it is recommended to ensure that the interval is more than 10cm in order to improve the noise immunity.

(3) Shielding

The shielding of the PLC shell should generally ensure that it floats with the electrical cabinet. Install an isometric shielding plate (generally use galvanized sheet) on the bottom plate of the PLC shell, and use a copper wire to maintain a point connection with the bottom plate, and its cross-sectional area should not be less than 1 0mm, so as to constitute an isometric shielding body and effectively eliminate the interference of external electromagnetic fields.

The shielded bus for the analog signal insulates and connects the central point to the reference potential or ground (GND). Grounding at both ends of the cable for the digital signal line ensures good rejection of high-frequency interference.

(4) Anti-noise measures

The part in the strong magnetic field (such as the transformer) should be shielded with metal, and fluorescent lamps should not be used for lighting in the electric control cabinet. The power supply of the PLC control system should also adopt corresponding anti-interference measures.

There are three methods of anti-interference of power supply of PLC control system: isolation transformer, low-pass filter and spectrum equalization method. Among them, the isolation transformer is the most commonly used, because the power supply of the I/O module of the PLC is usually DC24V, which must be stepped-down by the isolation transformer, and then rectified by the rectifier bridge, or directly supplied by switching power supply.

PLC crashes periodically

PLC periodic crash is characterized by the PLC crashing or chaotic program every certain amount of time of operation, or different interrupt fault displays, and everything is normal after restarting. According to practical experience, the most common cause of this phenomenon is caused by the long-term dust accumulation of the PLC body.

Therefore, the PLC rack slot interface should be purged regularly. When purging, you can first use compressed air or a soft brush to blow the dust on the control board and each slot, and then wipe the slots and control board plugs with 95% alcohol. After cleaning, check it carefully, and resume the boot to run normally.

The loss of PLC programs is usually caused by several reasons such as poor grounding, incorrect wiring, operation errors and interference:

1. The PLC host and module must have good grounding.

2. The phase wire and neutral wire of the main engine power cord must be wired correctly.

3. Prepare the package in advance for backup.

4. When using a handheld programmer to find faults, the locking switch should be placed in a vertical position, and pulling it out can play a role in protecting the memory.

5. PLC program is lost due to interference. The treatment method can refer to the handling of PLC interference caused by failure.
Hollysys PLC - common causes and treatment methods of PLC failures in operation

More on that
Hollysys DCS - Introduction to the advantages and disadvantages of DCS Hollysys DCS - Introduction to the advantages and disadvantages of DCS

Merit: 1. High reliability: The DCS system has multiple redundancy, backup and recovery mechanisms, which can ensure the high reliability and stability of the system. 2. Sensitivity: The DCS system can be customized according to different industrial processes to meet different control requirements. 3. Efficiency: D...

Hollysys released a new DCS control system Hollysys released a new DCS control system

Hollysys' safe and trustworthy DCS control system uses the controller K-CU11 for the K series large-capacity trusted controller module, which adopts advanced PowerPC architecture high-performance main processor and security components based on national cryptography algorithm, and has the security functions of static trusted start and dynamic trusted measurement. ...

and Nesbitt DCS - the difference between SCADA and DCS and PLC and Nesbitt DCS - the difference between SCADA and DCS and PLC

To put it simply, DCS is mainly used for process automation, PLC is mainly used for factory automation (production lines), and SCADA is mainly for wide-area needs, such as oil fields and pipelines that stretch for thousands of miles. If from the point of view of computers and networks, they are unified, and the reason for the difference is mainly in ...

Hollysys DCS - How to deal with DCS system failure? Hollysys DCS - How to deal with DCS system failure?

1. View the data on the monitoring screen When the following situations occur, it means that there is a problem with the control system, and the microcomputer maintenance personnel should be notified immediately for maintenance, and the operator should go to the site to deal with it. (1) Frequently changing data does not change for a long time, and several or all data do not ...

Hollysys' 100% domestic PLC has achieved breakthrough applications in the field of nuclear power Hollysys' 100% domestic PLC has achieved breakthrough applications in the field of nuclear power

Hollysys, as the PC general contractor, participated in the construction of the first smart water project in the domestic nuclear power industry (1) - Qin's No. 2 Plant Chengjing Water Intake Smart Operation and Transformation Project, which was recently completed and put into operation. The project is independently implemented by Hollysys, and Hollysys is independently controllable, safe and reliable, and deeply developed by the nuclear high-tech project.

Hollysys assisted Qingdao Petrochemical DCS upgrade Hollysys assisted Qingdao Petrochemical DCS upgrade

In December 2020, the equipment of Sinopec Qingdao Petrochemical Co., Ltd. (hereinafter referred to as Qingdao Petrochemical) 5 million tons/year oil refining integration project, which was upgraded and transformed by Hollysys, was successfully operated, marking the successful completion of the DCS equipment upgrading task. This upgrade is a major development for Sinopec Industrial Holdings.

Hollysys DCS control system configuration process Hollysys DCS control system configuration process

1. Preliminary preparations Engineering configuration is operated at the engineer station, and before engineering configuration, it is necessary to have the necessary tools and information, specifically: Tools: refers to the hardware environment and software environment used in engineering configuration, usually refers to the ...

Hollysys PLC - what are the commonly used networking methods of PLC? Hollysys PLC - what are the commonly used networking methods of PLC?

1 Universal serial port module Based on the serial port communication module to realize the network connection, the network structure is shown in Figure 1, the form of computer link is adopted, the corresponding settings are carried out in the configuration software of the host computer, and the communication can be carried out with multiple PLCs without programming, and the FXlS of Mitsubishi ...

Hollysys DCS - the connection method between thermocouple and DCS Hollysys DCS - the connection method between thermocouple and DCS

1. The thermocouple uses a compensation wire, and there can be a node in the middle, but the corresponding compensation cable must be used to directly connect to the DCS thermocouple module, such as the LLMUX card in HONEYWELLTPS. Minimize nodes to reduce interference. In addition, in the DCS configuration, it is necessary to select the corresponding thermocouple model, and supplement the ...

Hollysys PLC - PLC should be noted in operation (three, four, five) Hollysys PLC - PLC should be noted in operation (three, four, five)

3. Main anti-interference measures (1) Reasonable treatment of power supply to suppress the interference introduced by the power grid For grid disturbances introduced by the power supply, an isolation transformer with a shielded ratio of 1:1 can be installed to reduce the interference between the equipment and the ground.

Hollysys PLC - Introduction to the composition of PLC control cabinet Hollysys PLC - Introduction to the composition of PLC control cabinet

1. Open empty A master air switch that is the power control for the entire cabinet. 2. Power supply A 24VDC switching power supply. 3、PLC This should be chosen according to the needs of the project. If the scale of the project is small, the integrated PLC can be used directly; If the item ...

Hollysys DCS - What are the specific contents of the major and minor repair projects of the DCS system? Hollysys DCS - What are the specific contents of the major and minor repair projects of the DCS system?

(1) Overhaul projects DCS system overhaul is carried out in the random group of main equipment overhaul, and the overhaul project includes the following: 1) Conduct a comprehensive inspection of the control equipment and make a record. 2) Copy the configuration of all modules, and verify the marks and addresses of the modules. 3) Qing ...

Hollysys PLC – How to calculate the analog quantity in PLC Hollysys PLC – How to calculate the analog quantity in PLC

1、-10—10V。 When the voltage of -10V-10V is converted to F448-0BB8Hex (-3000-3000) at 6000 resolution; At 12000 resolution, it is converted to E890—1770Hex (-6000—6000). 2、0—10V。 At a voltage of 0-10V, at a resolution of 12000 ...

Hollysys DCS—— Selection, design and debugging of DCS system Hollysys DCS—— Selection, design and debugging of DCS system

1. Configuration of the system and controller The configuration of systems and controllers focuses on reliability and load factor (including redundancy). The communication load rate must be controlled within a reasonable range, and the load rate of the controller must be balanced as much as possible to avoid the occurrence of "high load" problems. 2 ...

What should be paid attention to when cooperating with Lysys PLC-PLC and inverter? What should be paid attention to when cooperating with Lysys PLC-PLC and inverter?

1. Input of switch command signal The input signal of the inverter includes a switch-type command signal that controls the operating status such as operation/stop, forward/reverse, section speed, and joging. Frequency converters usually make use of relay contacts or components with relay contact switching characteristics (such as crystals).

Hollysys automation solutions Hollysys automation solutions

Hollysys Automation provides automation solutions for many fields.   Intelligent TCM solutions In order to make the drug achieve the harmony and unity of the doctor's peace of mind, the pharmacist's formula, and the patient's peace of mind, higher requirements are put forward for the pharmacy environment and hospital management. But...

Hollysys DCS - Introduction to the main features of DCS Hollysys DCS - Introduction to the main features of DCS

(1) High reliability DCS is designed to be fault-tolerant, so that when a computer fails, it does not cause the system to lose other functions. In addition, because the tasks undertaken by the individual computers in the system are relatively simple, it is possible to adopt a specific structure and ...

Hollysys PLC - the output wiring of PLC Hollysys PLC - the output wiring of PLC

(1) There are three forms of programmable controller: relay output, thyristor output, and transistor output. (2) The wiring of the output terminal is divided into independent output and common output. When the output relay or thyristor of the PLC is activated, the two output terminals of the same number are turned on. In different groups, you can ...

Hollysys PLC - several common types of PLC control systems Hollysys PLC - several common types of PLC control systems

1. Stand-alone control system The stand-alone control system is controlled by one PLC to control one device or one simple production line, as shown in Figure 7-1. The composition of the stand-alone control system is simple, the number of I/O points required is less, the storage capacity is small, and when the model of PLC is selected, whether there is a communication network at present.

HollySys PLC - What places should be avoided when installing PLC? HollySys PLC - What places should be avoided when installing PLC?

(1) The ambient temperature exceeds the range of 0-50 °C; (2) The relative humidity exceeds 85% or there is dew condensation (caused by sudden temperature changes or other factors); (3) direct sunlight; (4) There are corrosive and flammable gases, such as hydrogen chloride, ...

CATEGORIES BYPASS
Customer Service Center

Online Consultation:QQ


ContactContact

Contact: Manager Huang

Contact QQ: 3271883383

Contact number: 13522565663


Scan the code to add WeChat (please save the picture first on the mobile phone)

working hoursworking hours

Weekdays: 9:00-17:00

Holidays: Only emergencies are handled

Contact us

Contact us

Contact number QQ consultation
QQ consultation

3271883383

Company address
Back to top