In December 2020, the equipment of Sinopec Qingdao Petrochemical Co., Ltd. (hereinafter referred to as Qingdao Petrochemical) 5 million tons/year oil refining integration project, which was upgraded and transformed by Hollysys, was successfully operated, marking the successful completion of the DCS equipment upgrading task. This upgrade provides a practical engineering demonstration of lower risk, shorter cycle and lower cost for the transformation of Sinopec's industrial control system.
Carefully plan and implement the transformation.
The DCS control system of Sinopec Qingdao Petrochemical Co., Ltd. processing high-acid crude oil adopts Lisi MACSV4.6.1 software products and MACS-SM hardware products. The system has been in operation for 11 years since it was put into operation in 2009. In order to better adapt to the technical requirements of the industry and improve work efficiency by using advanced technology applications, the customer has put forward the requirements of system upgrading.
After the on-site investigation of the operation of the system and the customized targeted transformation implementation plan and preparation, the refining and chemical industry department organized and coordinated, Hangzhou and the major project engineering department jointly service management department, Weifang Liaison Office, Jinan Liaison Office formed a project team, with the help of the maintenance period of the whole plant in 2020 for one month, focusing on upgrading the control system.
Efficient collaboration for successful delivery.
The renovation was a tight schedule and a heavy task. Relying on the full preparation work and detailed construction plan in the early stage, the Hollysys engineering service team completed the I/O card upgrade, controller replacement, and operation station replacement in just one month; system software upgrades; information security protection deployment; system testing; complex circuit and logic interlock testing; On-site commissioning; The DCS upgrade and transformation have been completed in many tasks such as array protection and transportation.
First-class quality and efficiency double promotion service.
The upgrade plan is mainly completed by replacing the new controller, operator station and system software upgrades, so that the field wiring remains unchanged and the original cabinet design remains unchanged. In addition, in response to the latest requirements of Sinopec Document 318, the deployment of information security protection has been added. The systematic transformation work improves the system performance, improves the operation safety, and prolongs the unified service life; Compared with the traditional sense of upgrading, it reduces the risk of upgrading, shortens the transformation cycle, reduces the transformation cost, and maximizes the customer's investment utilization.
Hollysys' engineering service team has won full recognition and high praise from users with its excellent technical capabilities. The client sent a letter of commendation and a pennant to express their high praise for the Hollysys project team. The successful delivery of the Qingdao petrochemical upgrading project provides a practical engineering reference for the transformation of the old system in the domestic petrochemical industry, which has typical demonstration significance.
|
More on that
|
Hollysys DCS - the debugging scheme of DCS system
1. Check before power-on
If the cable insulation resistance meets the requirements (greater than 5M ohms), check the cable insulation resistance test record, and spot check the actual measurement if necessary.
Check that all power cables, signal cables, and communication buses should be connected.
Control stations, operator stations, engineer stations, etc.
|
|
Hollysys DCS output module - K-AO02 advantages introduced
1. The output accuracy is as high as 0.05%, which greatly improves the operation efficiency of the system.
2. The full-scale output of the channel signal is 0-22.7mA, and the output range is wide;
3. It can be adapted to the enhanced base to achieve channel resistance to 220VAC;
4. It has a perfect channel signal diagnosis function, which can be realized.
|
|
Hollysys PLC - How to maintain the PLC control cabinet?
1. Data backup
When carrying out maintenance, we must cut off the power, data backup between power outages is an important link, for the data that needs to be archived for a long time, you can back up the historical trend data to the mobile hard disk, and then turn off the Windows-based operating system (Note...
|
|
Hollysys DCS——What should I pay attention to when cleaning the DCS system?
1. Power off
2. Cleaning the ash can not only clean the surface, but also clean the internal card key of the controller
3. If there is a supporting UPS, open the UPS and clean the ashes
4. After cleaning the ash, check whether the card and relay are loose, and tighten them if they are loose
5. The relays with frequent actions should be cleaned regularly.
|
|
Hollysys DCS - DCS daily maintenance and fault analysis and troubleshooting methods
01. Power supply
The DCS power supply system is mostly a "dual backup hot redundant power supply", and the prevention and control of power failures is mainly reflected in the inspection and daily maintenance.
Generally speaking, as long as the unit is normal ...
|
|
The characteristics of Hollysys LK series PLC are introduced in detail
LK is a programmable controller (PLC) product launched by Hollysys for medium and high-performance control fields. It fully integrates the advantages of DCS and PLC, adopts high-performance analog processing technology, miniaturized structural design, open industry standards, and a universal system platform, so that ...
|
|
Hollysys PLC - Classification and application of PLC
1. Switch logic control
Switching logic control is the basis of PLC. It is the first use case and the most extensive of all. Replace the previous relay circuit control and realize logic sequence control; It can be used for the control of stand-alone equipment, and can also be used for group control and ...
|
|
Common fault parts and maintenance of Hollysys PLC
1. Lack of motivation
It may sound simple, but it's good to check the simple stuff first. Thoroughly inspect all power connections and cables for damage that could cause a short circuit. Make sure your power supply is functioning properly. Use a voltmeter to check if the grounding and voltage are correct.
2. Bad ...
|
|
Hollysys PLC - maintenance steps of PLC control cabinet
1. Data backup
When carrying out maintenance, we must cut off the power, data backup between power outages is an important link, for the data that needs to be archived for a long time, you can back up the historical trend data to the mobile hard disk, and then turn off the Windows-based operating system (Note...
|
|
Hollysys DCS - DCS fault maintenance measures
Whether it is a new unit or an upgraded DCS, the equipment of the system and controller should focus on the reliability and load factor (including redundancy) objectives. The load rate planning of the communication bus must be controlled within a reasonable range, and the load rate of the controller should be balanced as much as possible.
|
|
Hollysys PLC - What is the use of the PLC interrupt function?
PLC understands the interrupt function in this way, when understanding the interrupt, we must first understand the PLC operation cycle or the scanning cycle, it is necessary to say that the PLC sequential control cycle execution process, which is the premise of understanding the interrupt, must be mastered, divided into three parts, input processing, program processing, output ...
|
|
Hollysys delivered a keynote speech at CAIMRS 2023 and won a number of awards
The "2023 China Automation + Digital Industry Annual Conference", "The 19th CAIMRS and Digital Leaders Forum" and the "Annual Award Ceremony" were successfully held in Suzhou. The theme of this summit is "Powerful Digital Intelligence, Junfa New Industry", combined with post-epidemic recovery, digital intelligence, and new industrialization.
|
|
Hollysys assisted the successful construction and operation of the largest natural gas deep processing base in Xinjiang
On August 16, 2021, the Tarim Oilfield Natural Gas Ethane Recovery Project, the largest natural gas deep processing base in Xinjiang (1), a key project of PetroChina, was successfully completed and put into operation, with stable operation and the production of qualified ethane products.
Tarim Oilfield Natural Gas Ethane Recovery Project ...
|
|
Hollysys DCS—— Selection, design and debugging of DCS system
1. Configuration of the system and controller
The configuration of systems and controllers focuses on reliability and load factor (including redundancy). The communication load rate must be controlled within a reasonable range, and the load rate of the controller must be balanced as much as possible to avoid the occurrence of "high load" problems.
2 ...
|
|
Hollysys DCS – the steps for DCS to properly power off and power on
DCS is properly blacked out
When the DCS needs to be powered off for maintenance due to overhaul or other reasons, we often directly power off the DCS, but sometimes this non-standard operation will bring serious consequences, such as configuration loss, PID parameter loss, etc. So there is a need for blackouts and re-on...
|
|
Hollys PLC - when the power supply is stable, what will cause the PLC to automatically restart?
1. The connection line is loose and the contact is poor
When the run indicator of the PLC turns red, the position of the plug changes to green with a manual move, indicating that the plug is loose, and it is best to replace the new connecting wire, and the plug is frequently plugged and unplugged, which will also lead to poor contact.
2. Strong electrical interference (external)
|
|
Hollysys DCS - Introduction to DCS grounding classification
In general, DCS control systems require two types of grounding: protective ground and working ground (logical, shielded, etc.). For systems equipped with safety barrier explosion protection measures, such as those used in the chemical industry, intrinsically safe premises are also required.
2.1 Protected areas (CG, Cabinet Grounding...)
|
|
Hollysys PLC - several common types of PLC control systems
1. Stand-alone control system
The stand-alone control system is controlled by one PLC to control one device or one simple production line, as shown in Figure 7-1. The composition of the stand-alone control system is simple, the number of I/O points required is less, the storage capacity is small, and when the model of PLC is selected, whether there is a communication network at present.
|
|
Hollysys PLC - a component of the PLC control cabinet
1. Open empty
A master air switch that is the power control for the entire cabinet.
2. Power supply
A 24VDC switching power supply.
3、PLC
This should be chosen according to the needs of the project. If the scale of the project is small, the integrated PLC can be used directly; If the item ...
|
|
Hollysys PLC - PLC should be noted in operation (2)
2. Interference in the control system and its sources
On-site electromagnetic interference is one of the most common factors in PLC control system and most likely to affect the reliability of the system. It is therefore essential to know the source of on-site disturbances ...
|
|