(1) The ambient temperature exceeds the range of 0-50 °C;

(2) The relative humidity exceeds 85% or there is dew condensation (caused by sudden temperature changes or other factors);

(3) direct sunlight;

(4) Corrosive and flammable gases, such as hydrogen chloride, hydrogen sulfide, etc.;

(5) Measure iron filings and dust;

(6) Frequent or continuous vibration, the vibration frequency is 10-55Hz, and the amplitude is 0.5mm (peak-peak);

(7) Shocks exceeding 10g (acceleration due to gravity).
HollySys PLC - What places should be avoided when installing PLC?

More on that
Hollysys DCS - Introduction to the advantages and disadvantages of DCS Hollysys DCS - Introduction to the advantages and disadvantages of DCS

Merit: 1. High reliability: The DCS system has multiple redundancy, backup and recovery mechanisms, which can ensure the high reliability and stability of the system. 2. Sensitivity: The DCS system can be customized according to different industrial processes to meet different control requirements. 3. Efficiency: D...

Hollysys DCS——What should I pay attention to when cleaning the DCS system? Hollysys DCS——What should I pay attention to when cleaning the DCS system?

1. Power off 2. Cleaning the ash can not only clean the surface, but also clean the internal card key of the controller 3. If there is a supporting UPS, open the UPS and clean the ashes 4. After cleaning the ash, check whether the card and relay are loose, and tighten them if they are loose 5. The relays with frequent actions should be cleaned regularly.

Hollysys PLC - what are the application fields of PLC Hollysys PLC - what are the application fields of PLC

1. Logic control of switching quantity This is the most basic and most extensive application field of PLC, which replaces the traditional relay circuit to achieve logic control and sequence control, which can be used for the control of a single device, as well as for multi-machine group control and automatic assembly line. Such as injection molding machines, printing machines, ...

Hollysys PLC - nine precautions for the use of PLC Hollysys PLC - nine precautions for the use of PLC

1. PLCZ self-fault judgment In general, PLCs are extremely reliable devices with a very low failure rate. The probability of hardware damage such as the CPU of the PLC or software running errors is almost zero; If the PLC input point is not caused by strong current intrusion, it will hardly be damaged; PLC output relay ...

What should be paid attention to when cooperating with Lysys PLC-PLC and inverter? What should be paid attention to when cooperating with Lysys PLC-PLC and inverter?

1. Input of switch command signal The input signal of the inverter includes a switch-type command signal that controls the operating status such as operation/stop, forward/reverse, section speed, and joging. Frequency converters usually make use of relay contacts or components with relay contact switching characteristics (such as crystals).

Hollysys PLC - Six Fault Types of PLC and Troubleshooting Methods (4-6) Hollysys PLC - Six Fault Types of PLC and Troubleshooting Methods (4-6)

Fourth, the fundamental sequence of repairing PLC. 1. Start first. 1) When repairing the PLC, do not start directly immediately, but first ask about the situation and the phenomenon of the problem before and after the problem; 2) If you repair an unfamiliar PLC, you should first understand its operating principle. ...

Troubleshooting steps of Hollysys DCS system Troubleshooting steps of Hollysys DCS system

The steps of DCS system troubleshooting include: (1) Check the fault caused by improper use. Common types of operational faults include operator errors, terminal wiring faults, module installation faults, and power supply failures. (2) Troubleshoot the improper operation of the DCS system ...

Hollysys PLC - the design specification of PLC program Hollysys PLC - the design specification of PLC program

(1) Select the appropriate PLC model and I/O points, and select the special function module when there are special function requirements. (2) Familiar with the selected PLC programming instructions and compilation software. (3) Carry out soft component planning, including internal relays, holding relays, data registers, ...

Hollysys will make a blockbuster appearance at the first Shenzhen Nuclear Expo in 2022 Hollysys will make a blockbuster appearance at the first Shenzhen Nuclear Expo in 2022

From November 15th to 17th, the 2022 China Nuclear Energy High-Quality Development Conference and Shenzhen International Nuclear Energy Industry Innovation Expo (hereinafter referred to as the "2022 Shenzhen Nuclear Expo") will be grandly reopened at the Shenzhen World Convention and Exhibition Center.   The theme of this year's Nuclear Expo is "Nuclear Gathering in the Bay Area, Activating the World".

Hollysys PLC - Six Fault Types of PLC and Troubleshooting Methods (1-3) Hollysys PLC - Six Fault Types of PLC and Troubleshooting Methods (1-3)

First, the type of failure of the PLC. 1. External equipment failure. External equipment refers to various switches, sensors, actuators, loads, etc., which are directly connected with the PLC operation process. The failure of these equipment will directly affect the control function of the PLC system. Therefore...

Hollys PLC - when the power supply is stable, what will cause the PLC to automatically restart? Hollys PLC - when the power supply is stable, what will cause the PLC to automatically restart?

1. The connection line is loose and the contact is poor When the run indicator of the PLC turns red, the position of the plug changes to green with a manual move, indicating that the plug is loose, and it is best to replace the new connecting wire, and the plug is frequently plugged and unplugged, which will also lead to poor contact. 2. Strong electrical interference (external)

Hollysys DCS - DCS common communication faults and solutions Hollysys DCS - DCS common communication faults and solutions

01 Node bus failure The node bus material is usually a coaxial cable, so as long as there is a cable disconnected, the communication of all devices on the bus will be paralyzed, which will cause serious phenomena such as data loss, equipment stoppage and operation interruption, and may eventually directly or indirectly cause huge ...

Hollysys assisted Qingdao Petrochemical DCS upgrade Hollysys assisted Qingdao Petrochemical DCS upgrade

In December 2020, the equipment of Sinopec Qingdao Petrochemical Co., Ltd. (hereinafter referred to as Qingdao Petrochemical) 5 million tons/year oil refining integration project, which was upgraded and transformed by Hollysys, was successfully operated, marking the successful completion of the DCS equipment upgrading task. This upgrade is a major development for Sinopec Industrial Holdings.

Bureau Veritas signed a strategic cooperation agreement with Hollysys Group and issued a ball valve functional safety certificate to it Bureau Veritas signed a strategic cooperation agreement with Hollysys Group and issued a ball valve functional safety certificate to it

Recently, the signing ceremony of the strategic cooperation between Bureau Veritas and Hollysys and the functional safety certification ceremony of Hollysys valves were held in the Hangzhou base of Hollysys. Mr. Ye Jiong, General Manager of Bureau Veritas Technology Center, Mr. Zhong Aimin, Director of Product Certification Center, Mr. Yang Yang, Sales Director of Eastern Region, and Mr. Yang Yang, Director of Functional Safety ...

Hollysys DCS - What are the characteristics of DCS? Hollysys DCS - What are the characteristics of DCS?

1. High reliability Because DCS disperses the system control function on each computer, and the system structure adopts a fault-tolerant design, the failure of one computer will not lead to the loss of other functions of the system. In addition, due to the fact that the tasks undertaken by the various computers in the system are comparatively ...

Hollysys DCS – the steps for DCS to properly power off and power on Hollysys DCS – the steps for DCS to properly power off and power on

DCS is properly blacked out When the DCS needs to be powered off for maintenance due to overhaul or other reasons, we often directly power off the DCS, but sometimes this non-standard operation will bring serious consequences, such as configuration loss, PID parameter loss, etc. So there is a need for blackouts and re-on...

Hollysys assisted the successful construction and operation of the largest natural gas deep processing base in Xinjiang Hollysys assisted the successful construction and operation of the largest natural gas deep processing base in Xinjiang

On August 16, 2021, the Tarim Oilfield Natural Gas Ethane Recovery Project, the largest natural gas deep processing base in Xinjiang (1), a key project of PetroChina, was successfully completed and put into operation, with stable operation and the production of qualified ethane products. Tarim Oilfield Natural Gas Ethane Recovery Project ...

Hollysys DCS - Introduction to DCS grounding classification Hollysys DCS - Introduction to DCS grounding classification

In general, DCS control systems require two types of grounding: protective ground and working ground (logical, shielded, etc.). For systems equipped with safety barrier explosion protection measures, such as those used in the chemical industry, intrinsically safe premises are also required. 2.1 Protected areas (CG, Cabinet Grounding...)

Hollysys DCS - Introduction to the main features of DCS Hollysys DCS - Introduction to the main features of DCS

(1) High reliability DCS is designed to be fault-tolerant, so that when a computer fails, it does not cause the system to lose other functions. In addition, because the tasks undertaken by the individual computers in the system are relatively simple, it is possible to adopt a specific structure and ...

and Lisi DCS - the difference between DCS control and PLC control and Lisi DCS - the difference between DCS control and PLC control

1. PLC programmable logic controller (programmable controller). 2. DCS system pays more attention to the field of process control. Such as chemical, smelting, pharmaceutical, etc. It mainly monitors and controls some field parameters, while PLC focuses on logic control. machining). Of course, the PLC's ...

CATEGORIES BYPASS
Customer Service Center

Online Consultation:QQ


ContactContact

Contact: Manager Huang

Contact QQ: 3271883383

Contact number: 13522565663


Scan the code to add WeChat (please save the picture first on the mobile phone)

working hoursworking hours

Weekdays: 9:00-17:00

Holidays: Only emergencies are handled

Contact us

Contact us

Contact number QQ consultation
QQ consultation

3271883383

Company address
Back to top