When the FR-CS80 inverter detects an abnormality, it will display an error message or alarm in the operation panel according to the abnormal content, or maintain the function action and block the output of the inverter. When maintaining a function operation, please deal with the cause of its operation before resetting the inverter, and then start working. Restarting without proper treatment may result in problems or damage to the drive.
[Please pay attention to the following points when maintaining the function operation]
1. Abnormal output signal During the maintenance function, if the electromagnetic contactor (MC) set on the input side of the inverter is disconnected, the control power supply of the inverter will be lost, and the abnormal output cannot be maintained.
2. Abnormal appearance
After the maintenance function is performed, abnormal content will be displayed in the operation panel.
3. Re-launch method
After the maintenance function is activated, the inverter will continue to output the abort state. As long as the inverter is required to reset when it is restarted.
【Types of abnormal manifestations of inverters】
1. Fault information
Information is displayed for operating or setting errors on the control panel or parameter unit. The inverter does not block the output.
2. Call the police
Even if an alarm is displayed in the operation panel, the inverter will not block the output, but if it is not adopted, it may cause serious problems.
3. Minor problems
The inverter does not block the output. It can output a light bug (LF) signal after parameter setting.
4. Heavy problems
After the maintenance function is operated, the output of the inverter is intercepted, and the abnormal (ALM) signal is output.
[Recognition and eradication of the pre-police history]
It is possible to store the alarm display of abnormal content when the last 8 maintenance functions are performed in the operation panel. (Pre-alarm history)
1. Methods for acknowledging the history of the police
*1 When an overcurrent trips due to a short-term overcurrent, the current supervision value stored in the alarm history may be lower than the actual current value. *2 The cumulative energizing time and actual operating time are accumulated from 0 to 65,535 hours, and then from 0 again after clearing zero.
Second, the eradication process of the pre-alarm history
1. The screen when the power is turned on
The supervisor manifests.
2. Parameter setting form
Press the SET button to switch to the parameter setting format.
3. Parameter selection
. Press the SET button twice to display the next parameter.
|
More on that
|
Mitsubishi PLC product line analysis
FX1S Series:
Mitsubishi PLC is an integrated small unit type PLC. And it has intact functions and communication functions and other scalability. If you consider the space and cost of the installation, it is an ideal choice.
FX1N Series:
It is a popular PL with strong functions launched by Mitsubishi Electric ...
|
|
The choice of industrial tablet case – Mitsubishi
Tablet PC can often be seen in today's daily life, it can be brought stronger, but also more popular with us, industrial tablet PC is gradually widespread, because industrial use will cause Tablet PC is very simple damage, so generally will use maintenance covers, so ...
|
|
There is no self-locking reason for the Mitsubishi servo motor to be turned on
In some cases, when the user first touches the use of the Mitsubishi servo motor, it may appear that the Mitsubishi servo motor is not self-locking after it is ready! So, what is the reason for this? And how to deal with it?
...
|
|
Mitsubishi inverter fault detection method
1. The output side of the inverter is short-circuited, such as the connection line between the output end and the motor, or the short circuit inside the motor, etc.;
2. The inverter itself is not working properly, such as the two inverter equipment of the same bridge arm in the inverter bridge are constantly alternating in the working process ...
|
|
Introduction to Mitsubishi PLC network structure
1. The equipment layer/fieldbus CC-Link equipment layer is a field network that connects PLC and other control equipment, sensors and drive equipment, which is the lowest layer of the entire network system. The CC-Link fieldbus connection is adopted, and the number of wiring is greatly reduced, and the maintainability of the system is improved. Combine...
|
|
Maintenance method of Mitsubishi inverter
Electrical characteristics view
Mitsubishi inverters that have been running and placed for a long time, due to the influence of the environment and the aging of inverter equipment, it is necessary to check and maintain the electrical performance of Mitsubishi inverters regularly. A comprehensive review of the input, rectifier and inverter, DC input fuses found ...
|
|
Three common communication methods of PLC - Mitsubishi
A PLC network consists of multiple subnets. The communication process of each subnet is determined by the communication protocol. The communication method is the core content of the communication protocol. The means of communication include visit control and data transmission. What are the three common communication methods of PLC?
...
|
|
Mitsubishi PLC writes the holding circuit
There is a very common kind of circuit in Mitsubishi PLC - the persistence circuit. The insistence circuit means that when the external input switch is a button, it can be pressed through the insistence circuit to press the button to insist on the output, similar to the self-locking in the electrical diagram. Let's take Mitsubishi PLC as an example to write a sticking circuit.
...
|
|
Ground leakage current of Mitsubishi inverter and countermeasures thereof
There is electrostatic capacitance between the input and output wiring of Mitsubishi inverters and other wires, between the ground and the motor, and there is a leakage current flow. The leakage current value is affected by factors such as electrostatic capacitance and carrier frequency, and the leakage current is high when the carrier frequency of the inverter is set high and the leakage current is operated under low noise conditions.
|
|
Built-in time adjustment in Mitsubishi PLC
You can use two commands: TWR (Time Write) command and TRD (FNC166) TRD(P) command to adjust the built-in time.
1. TWR (Time Write) command
Instructions to write time presets to the built-in real-time clock: Clock ...
|
|
The method of Mitsubishi PLC to control the Mitsubishi inverter
The switching quantity control inverter of PLC is selected (that is, the switching output terminal of PLC is directly connected to the switching input terminal of the inverter, and the PLC can control the start, stop, forward and reverse rotation of the inverter and high, medium and low speed multi-stage speed operation through the program).
...
|
|
Mitsubishi PLC Programming FAQs
1. Can the PLC of FX1N be extended to connect with FX2N's input and output modules, positioning modules, analog modules, etc.?
The PLC of the FX1N is fully capable of expanding the expansion modules connected to the FX2N. Such as FX2N-16EX, FX2N-16EYR, FX2N-4A...
|
|
Mitsubishi Electric CNC numerical control system grounding specification
What is the effect of machine tool grounding?
1. Insist that the machine shell and the ground insist on the same voltage.
2. In the event of abnormal external voltage or leakage, the maintenance personnel and the machine tool will not be damaged electrically.
3. Avoid damage to CNC equipment caused by external voltages such as surges.
4. ...
|
|
Mitsubishi inverter FR-A800 operating environment
Comfortable operating environment for Mitsubishi inverter FR-A800
|
|
Mitsubishi Electric develops satellites for greenhouse gas and water cycle observations
TOKYO, March 30, 2020 – Mitsubishi Electric Corporation (Tokyo: 6503) announced today that it has been appointed by the Japan Aerospace Agency (JAXA) as the contractor for the Global Satellite Observing Satellite for the Greenhouse Gas and Water Cycle (GOSAT-GW), the third satellite in the GOSAT series, ...
|
|
Performance comparison of Mitsubishi servo motors
First, the control accuracy is different
The step angle of the two-phase hybrid Mitsubishi servo motor is generally 1.8 ° and 0.9 °, and the step angle of the five-phase hybrid Mitsubishi servo motor is generally 0.72 ° and 0.36 °. Mitsubishi servo motors, which are also some functions, have a smaller step angle after segmentation.
...
|
|
Find PLC fault method – Mitsubishi PLC
PLC is an industrial small computer, it has a problem, the first thing to clean up is the PLC ontology problem is still a peripheral problem, if there is a problem with the PLC ontology, often the ERR light is on, maybe the red light is flashing, the normal situation is generally RUN running green light, if it is the ontology to produce this kind of problem, ...
|
|
Introduction to Mitsubishi PLC memory classification
Mitsubishi PLC's Memory is a memory device in the measurement muscle system that is used to store processes and data. The overall information in the measuring machine, including the output of the original data, the measuring machine process, the central operating cut-off and the final operating cut-off are stored in the memory. It is based on the controller ...
|
|
Mitsubishi PLC login password setting operation
Method 1
1. Hit the PLC from RUN to STOP
Mitsubishi's PLC has a special method of setting landing keywords, and it is necessary to ensure that the PLC is in a state of shutdown in order to successfully write the landing keywords.
In the run running condition, the performance of the write will appear "Unable to ...
|
|
Mitsubishi 5uplc monitors modbusTCP disconnect methods
First, Mitsubishi uses FX5U series PLC with serial port and built-in modbus communication protocol, so that we can easily communicate with third-party equipment. If it is a communication between Mitsubishi PLC and the inverter, the focus is on designing the parameters. The inverter is heavy, set the address, baud rate, check, etc., ...
|
|