Servo motor selection process – Schneider

Create Date: 2024-8-30 12:03:23|Source: Schneider/Schneider

1. Load organization (acknowledging the type of tissue and its specific data, such as ball screw length, ball screw diameter, stroke, pulley diameter, etc.)

                              Servo motor selection process – Schneider

2. Form of action (acknowledging the form of action of manipulating the target, the relationship between time and speed; Convert the motion form of the control target into the motion form on the motor shaft; Acknowledgment of operating forms, including parameters such as acceleration time (ta), constant speed time (tu), deceleration time (td), stop time (ts), cycle time (tc), distance of movement (L), etc.)

3. Positioning accuracy (admit whether the number of encoder pulses is satisfactory to the resolution required by the system)

Servo motor classification and selection process? The servo motor is driven by a brushed DC motor. DC motors are simpler to operate, smaller in size, and inexpensive than AC motors, so they were widely used in the past. However, with the reduction of prices and the development of motor control skills, there is less and less time to communicate and use motors

More on that
Schneider AC contactor precautions Schneider AC contactor precautions

There are many series of contactors: LC1-SK series: below 6ALC1-K series: 6A-16ALC1-D series: 9A-150ALC1-F series: 115A-800ALC1-B series: 750A-1800A When installing, it should be in accordance with the regulations...

Schneider inverter external potentiometer connection Schneider inverter external potentiometer connection

The two wires are connected to the resistor, and the other wire is connected to the conditioning terminal. The red thread is attached to the blackhead and inserted in a small hole. Connect both ends of the IR potentiometer to +10V and ACM, and slide the termination to the voltage input terminal AVI. ...

Precautions for the use and maintenance of instruments and meters - Schneider Precautions for the use and maintenance of instruments and meters - Schneider

Attention should be paid to the following matters during the use and maintenance of the appearance of the instrument: 1. Don't blindly knock and bump when overhauling, so as not to expand the problem, and the more you repair, the worse it will become. ​ 2. Do not plug and unplug various control boards and plugs with electricity. Due to the power-on ...

Introduction to Schneider inverter fault code and maintenance method Introduction to Schneider inverter fault code and maintenance method

1. If the fault code presented on the Schneider inverter is AnF, it means that the load of the inverter has slipped, that is, the speed of the encoder does not match the initial value. First of all, we need to check whether the parameters of the motor are stable and the size of the load, ...

The contents of the daily inspection of Schneider inverters The contents of the daily inspection of Schneider inverters

1) Whether the ambient temperature is normal or not, it is required to be in the range of -10-+40 °C, and it is better to be about 25 °C. whether the humidity meets the requirements, and whether the ventilation and heat dissipation of doors and windows are outstanding; Whether the lower air inlet and upper air outlet of the inverter are dusty or blocked due to excessive dust. ...

Schneider UPS Energy Saving Method Schneider UPS Energy Saving Method

1. Flexible planning for on-demand expansion Generally, the construction of data centers is not in one step, and the expansion of the next few years will be considered, and the UPS capacity is generally considered to be larger in the design.

Maintenance of Schneider circuit breakers Maintenance of Schneider circuit breakers

In order to keep the main Schneider circuit breaker in excellent operating condition, it is necessary to strengthen the maintenance management. 1. Insist that the air is moist or unclean, and the pipes are not clean, may have the following consequences: (1) The wet gas is decomposed into mixed gases such as hydrogen and oxygen under the action of electric arc, which damages the ...

Schneider molded case and miniature circuit breaker recommended models Schneider molded case and miniature circuit breaker recommended models

  Molded case circuit breaker recommendation Schneider EZD series Create a high-quality circuit breaker for secondary power distribution EZD molded case circuit breaker is a product series of molded case circuit breakers specially designed for secondary power distribution by Schneider Electric, which is especially suitable for ...

Circuit breaker failure protection - Schneider Circuit breaker failure protection - Schneider

Circuit breaker failure maintenance refers to the relay maintenance action of faulty electrical equipment when the trip command is announced and the circuit breaker refuses, the maintenance action information of the faulty equipment and the current information of the rejected circuit breaker constitute the judgment of circuit breaker failure, and other related problems in the same plant and station are cut off in a shorter time limit.

Schneider Electric inverter applications Schneider Electric inverter applications

Schneider inverter, the full name of "Schneider communication inverter governor", is a well-known inverter brand developed, manufactured and sold by Schneider Electric Group in France. It is mainly used to control and regulate the speed of three-phase communication asynchronous motor, with its stable performance, rich combination functions, outstanding ...

The control mode of low-voltage inverter - Schneider The control mode of low-voltage inverter - Schneider

From the perspective of skills alone, the control method of the low-voltage inverter also indicates its skill portal to a certain extent. Here, we've broken down the following manipulation methods: 1. Sinusoidal pulse width modulation Sinusoidal Pulse Width Modulation (SPWM) is characterized by the simple structure of the control circuit, the cost of ...

Selection and control of the inverter installation - Schneider Selection and control of the inverter installation - Schneider

Frequency converters are widely used equipment in modern industry. If you want to complete the functions of soft stop, soft start, stepless speed regulation or special requirements for speed rise and fall, you need the more advanced speed control equipment in modern asynchronous motors - frequency converters. The main circuit of the equipment is selected to communicate - DC - communication ...

The difference between Schneider miniature circuit breaker and leakage switch The difference between Schneider miniature circuit breaker and leakage switch

1. Definition of miniature circuit breaker The electrical occupation is referred to as MCB, which is suitable for communicating 50/60Hz additional voltage 230/400V, additional current to 63A line overload and short circuit maintenance, and can also be used as infrequent operation conversion of the line under normal circumstances. ...

Schneider introduces the new Lexium28S servo Schneider introduces the new Lexium28S servo

The newly launched Lexium28S Sercos III bus servo with BCH2 servo motor is available as a pre-order product portfolio to meet the needs of motion control and optimize the function of the machine. Lexium28S servo drives, available in 4 sizes, 10 models, power mask 0.05KW to 4 ...

Common analysis method for electrical control line faults - Schneider Common analysis method for electrical control line faults - Schneider

1) Survey and research method. The investigation and research method is to understand the obvious problem phenomena through "seeing", "listening", "smelling", "touching" and "asking"; After visiting the operator, understand the cause of the failure; A common way to help find the fault point after asking others or consulting information ...

The UPS boot panel does not show that the UPS is not working - Schneider The UPS boot panel does not show that the UPS is not working - Schneider

Problem: After the UPS is turned on, there is no display on the panel, and the UPS does not work Problem analysis: Judging from the problem phenomenon, the problem lies in the mains input, the battery and the mains detection part and the battery voltage detection loop: 1. Check ...

Schneider soft starter fault alarm maintenance method Schneider soft starter fault alarm maintenance method

1. Question-F 05 (frequency error): This problem is caused by a problem with the soft starter processing the internal power signal, which is causing errors in the power supply frequency. This situation needs to be handled by the company's product development software design engineer. Mainly start the power supply circuit design ...

The role of Schneider instrumentation in the air separation process The role of Schneider instrumentation in the air separation process

The appearance of the instrument plays a very important role in the air separation equipment and gas purification process, and it is indispensable for the adjustment of the air separation process and the detection of product quality. Because there are different types of on-line profiles for monitoring targets in different gaseous media at each stage of the ASU process, the ...

"Five Ways" to Solve Life Sciences Industry Challenges – Schneider "Five Ways" to Solve Life Sciences Industry Challenges – Schneider

In life sciences careers, equipment performance is critical to ensuring business continuity and useful production time. The main challenges faced by the industry include: maintaining the positive impact of environmental parameters on product quality, managing multiple systems in a "siloed" state, and using existing infrastructure sensitively and efficiently.

Schneider servo drive fault code Schneider servo drive fault code

1. AL001: overcurrent, the current value of the main 2113 circuit exceeds the motor instantaneous 5261*** high current value 1.5 times when the action is 4102. 2. AL002: overvoltage, the voltage value of the main return 1653 channel is higher than the standard value. 3. AL003: low voltage, the voltage value of the main circuit is lower than the standard.

CATEGORIES BYPASS
Customer Service Center

Online Consultation:QQ


ContactContact

Contact: Manager Huang

Contact QQ: 3271883383

Contact number: 13522565663


Scan the code to add WeChat (please save the picture first on the mobile phone)

working hoursworking hours

Weekdays: 9:00-17:00

Holidays: Only emergencies are handled

Contact us

Contact us

Contact number QQ consultation
QQ consultation

3271883383

Company address
Back to top