(1) When placing signal cables with different properties into the same conduit, they must be isolated

(2) Try to avoid accommodating multiple power cords in the same conduit. When it is necessary to set up, a partition should be placed inside the conduit and the partition should be grounded.

                               Schneider PLC control cabinet installation wiring method

(3) When wiring with conduit, do not place the wires of one circuit in different conduits due to the heating of the conduit.

(4) In order not to affect each other between the power cable and the signal cable, do not route them in parallel.

(5) If it is installed in a cabinet equipped with high-voltage equipment, it will induce noise, so try to stay away from the high-voltage and power system for wiring.

(6) Install a PLC at a distance of more than 200mm from the power line of the high-voltage line, or put the high-voltage line and the power line into the metal pipe for wiring, and thoroughly ground the metal pipe for class D.
More on that
Schneider servo motor advantages Schneider servo motor advantages

Schneider servo motor is one of the brands of servo motor, the performance is relatively good, is a brand made in Germany, in China ** degree is relatively high. Servo motor refers to the servo system, (servomechanism) in which the mechanical components are controlled.

Dual-fan inverter selection - Schneider Dual-fan inverter selection - Schneider

1. Qualified after inspection When selecting a double fan inverter, it must be strictly checked for its quality. The first requirement is that it must have relevant certificates of qualified inspection, and some qualified materials must be taken out. This is the only way to ensure that this change ...

Schneider appeared at the 5th China Power Distribution Technology Summit Forum Schneider appeared at the 5th China Power Distribution Technology Summit Forum

Beijing, China, September 14, 2020 – Today, the 5th China Power Distribution Technology Summit Forum 2021, held by China Electric Power Research Institute Co., Ltd. and the Science and Technology Development Service Center of China Electric Power Council, opened in Beijing. The theme of this forum is "Supporting the Strategic Policy of Carbon Peaking and Carbon Neutrality, Building a ...

Schneider ATV312 inverter failure Schneider ATV312 inverter failure

1. OLF is motor overload. Possible reasons: 1. Triggered by high motor current. 2. The value of the [cold stator resistance] (rSC) parameter is wrong. Corrective measures: 1. Check the [Motor Thermal Current] (ItH) setting of the motor thermal maintenance function and check the motor load. Wait...

Heat dissipation strategy for frequency converters – Schneider Heat dissipation strategy for frequency converters – Schneider

Drives power and operate commercial and industrial motors, and thermal protection is necessary in accordance with their planning and operating environment. The main advantages of the frequency converters are flexible handling, smooth start-up and shutdown functions, and significant energy savings due to centrifugal fans and pumps operating under variable loads. ...

Classification of Schneider molded case circuit breakers Classification of Schneider molded case circuit breakers

1. According to the device method, it is divided into: vertical installation and horizontal installation. 2. According to the use of circuit breakers: power distribution maintenance type, motor maintenance type. 3. According to the wiring method: board front wiring, board back wiring, plug-in wiring. ...

Schneider's method of improving the power factor of UPS power supplies Schneider's method of improving the power factor of UPS power supplies

One. The significance of the progressive power factor. 1. Make full use of the ability of power equipment. Each power supply unit has additional capacity, i.e. depending on the power. The total power output of the power supply equipment S, - part of the active power, the other part is the reactive power, the smaller the ...

Schneider UPS power supply common fault analysis Schneider UPS power supply common fault analysis

1. When there is mains power, the UPS output is normal, and when there is no mains power, the buzzer beeps for a long time and there is no output Fault analysis: From the phenomenon to identify some problems of the battery and inverter, you can view it according to the following procedures: 1. Check the battery voltage to see if the battery is undercharged.

Schneider diode selection experience and substitution method Schneider diode selection experience and substitution method

1. Selection of detection diode Point-contact germanium diodes are generally used for detection diodes, such as 2AP series. When selecting, the detection diode with high operating frequency, small reverse current and large forward current should be selected according to the specific requirements of the circuit. Although the detection and rectification of ...

Precautions for Schneider to use USP power supplies Precautions for Schneider to use USP power supplies

(1) When using Schneider UPS power supply, the relevant provisions of the manufacturer's product manual should be strictly adhered to ensure that the front and zero line sequences of the mains connected by Schneider UPS meet the requirements. (2) The main intention of equipping Schneider UPS is to prevent the computer from losing information due to a sudden power failure...

Circuit breaker failure protection - Schneider Circuit breaker failure protection - Schneider

Circuit breaker failure maintenance refers to the relay maintenance action of faulty electrical equipment when the trip command is announced and the circuit breaker refuses, the maintenance action information of the faulty equipment and the current information of the rejected circuit breaker constitute the judgment of circuit breaker failure, and other related problems in the same plant and station are cut off in a shorter time limit.

The difference between Schneider PLC and Siemens PLC The difference between Schneider PLC and Siemens PLC

There are three main differences, namely: different applications, different products, and different characteristics. 1. The application situation is different: the programmable manipulator produced by Siemens in Germany is also widely used in China.

Causes of Schneider UPS power supply damage Causes of Schneider UPS power supply damage

1. Air conditioning: It is generally forbidden to use UPS power supply, because the air conditioning is very large and belongs to the rational load. Not suitable for belt loads 2. Motor: It is necessary to choose a large-capacity UPS power supply, because it is a rational load, and it is ...

Electrical Control Line Fault Analysis Method - Schneider Electrical Control Line Fault Analysis Method - Schneider

1) Survey and research method. The investigation and research method is to "see", "listen", "smell", "touch" and "ask" to understand the significant faulty phenomena; After visiting the operator, understand the cause of the problem; A common way to help find faults after consulting others or consulting information ...

Is there a restriction on the installation direction when Schneider installs the inverter? Is there a restriction on the installation direction when Schneider installs the inverter?

It should be basically stored in the plate, the problem is that the plate with a fully enclosed structure is large, takes up a lot of space, and the cost is relatively high. This can be done by: (1) The planning of the disc should be based on the heat dissipation required by the actual device; (2) Profit ...

Detailed explanation of the steps of Schneider inverter inverter setup Detailed explanation of the steps of Schneider inverter inverter setup

1. Macro equipment: In view of the control requirements of different loads, Schneider inverters have talked about the macro equipment in advance and the initial function of the I/O terminals. Changes to the macro rig can be corrected under the Abbreviated Boot Menu. If required, it is also possible to re-equip the end separately ...

Is there a restriction on the installation direction when Schneider installs the inverter? Is there a restriction on the installation direction when Schneider installs the inverter?

It should be basically stored in the plate, the problem is that the plate with a fully enclosed structure is large in size, takes up a lot of space, and the cost is higher. This can be done by: (1) The planning of the disc should be based on the heat dissipation required by the actual device; (2) Profit ...

Schneider Compact NSX series molded case circuit breaker selection recommendation Schneider Compact NSX series molded case circuit breaker selection recommendation

The molded case circuit breaker is an important part of the maintenance of the low-voltage distribution system and the motor, and maintains the safety of the distribution system and electrical equipment. As an important application scenario of molded case circuit breakers, these key occupations of new infrastructure such as new energy and telecommunications have extremely important equipment performance, stability and adaptability.

Analysis of 10 reasons for frequent tripping of Schneider leakage switches Analysis of 10 reasons for frequent tripping of Schneider leakage switches

1. Defective device If the lead wire of each pile head is not firmly connected and loosened for a long time, it will cause the pile to heat and oxidize, burn out the outer insulation of the wire, and announce sparks and burnt smell, resulting in undervoltage of the line and air switch action. 2. Leakage switch with ...

Schneider frame circuit breaker MT circuit breaker does not close the brake problem Schneider frame circuit breaker MT circuit breaker does not close the brake problem

Schneider structural circuit breaker is not stored (check the power supply of the energy storage motor, if it is normal, check whether it can be manually stored for energy) MX shunt coil live (disconnect MX coil power) The MN coil is not charged or faulty (a voltage higher than 0.85Un is applied to the MN) The circuit breaker is latched in ...

CATEGORIES BYPASS
Customer Service Center

Online Consultation:QQ


ContactContact

Contact: Manager Huang

Contact QQ: 3271883383

Contact number: 13522565663


Scan the code to add WeChat (please save the picture first on the mobile phone)

working hoursworking hours

Weekdays: 9:00-17:00

Holidays: Only emergencies are handled

Contact us

Contact us

Contact number QQ consultation
QQ consultation

3271883383

Company address
Back to top