1. When there is mains power, the UPS output is normal, and when there is no mains power, the buzzer beeps for a long time and there is no output
Fault analysis: From the phenomenon to identify some problems of the battery and inverter, you can view it according to the following procedures:
1. Check the battery voltage to see if the battery is undercharged, if the battery is not charged enough, it is necessary to check whether it is the fault of the battery itself or the fault of the charging circuit.
2. If the battery operating voltage is normal, check whether the inverter drive circuit is working normally, and if the output of the driving circuit is normal, it means that the inverter is damaged.
3. If the inverter drive circuit is not working normally, check whether the waveform generation circuit has a PWM control signal output, and if there is a control signal output, it is clear that the fault is in the inverter drive circuit.
4. If the waveform generation circuit does not have PWM control signal output, check whether its output is blocked due to maintenance circuit operation, and if so, find out the maintenance reason;
5. If the maintenance circuit is not working and the operating voltage is normal, and the waveform generating circuit has no PWM waveform output, it is clear that the waveform generating circuit is damaged. The above troubleshooting order can also be reversed, which can sometimes detect problems more quickly.
Second, the battery voltage is low, but after more than ten hours of charging, the battery voltage still cannot be charged
Fault Analysis: To identify the phenomenon as a battery or charging circuit problem, you can view it as follows:
1. Check whether the input and output voltage of the charging circuit is normal;
2. If the input of the charging circuit is normal, the output is abnormal, disconnect the battery and retest, if it is still abnormal, it is a fault of the charging circuit;
3. If the input and output of the charging circuit are normal after disconnecting the battery, it is clear that the battery has been damaged due to long-term uncharged, over-discharged or expired.
3. A pair of power amplifier transistors in the power stage of the inverter are damaged, and after replacing the same type of transistor, the reason for the burning out after a period of operation is that the current is too large, and the reasons for the excessive current are:
1. Overcurrent maintenance failure. When the inverter output generates overcurrent, the overcurrent maintenance circuit does not work;
2. The pulse width modulation (PWM) component is faulty, the output of the two complementary waveforms is asymmetrical, one has a long on-time, and the other has a short on-time, which makes the operation of the two arms unbalanced, and even the two arms are turned on together, resulting in damage to the two tubes;
3. The parameters of the power tube are quite different, even if the symmetrical waveform is input, the output will be asymmetrical, and the waveform will be output through the transformer, resulting in bias magnetism, that is, the magnetic flux is unbalanced, and the accumulation leads to the transformer being full and the current increases suddenly, burning out the power tube, and one is burned out, and the other is also burned out.
|
More on that
|
Schneider frame circuit breaker MT circuit breaker does not close the brake problem
Schneider structural circuit breaker is not stored (check the power supply of the energy storage motor, if it is normal, check whether it can be manually stored for energy)
MX shunt coil live (disconnect MX coil power)
The MN coil is not charged or faulty (a voltage higher than 0.85Un is applied to the MN)
The circuit breaker is latched in ...
|
|
Schneider medium-voltage inverters focus on energy saving
Because the impact of foreign electrical products on domestic electrical equipment is relatively large, now Schneider inverter equipment occupation is facing a big technical promotion, taking inverter as an example, the national connotation of inverter shopping mall domestic brand and foreign brand, regardless of technology, processing and manufacturing, industrial design and other aspects are still ...
|
|
Schneider PLC failure steps
(1) If the signal is controlled on a counter, first look at the logic that controls the reset, then the counter signal. Follow steps 2 to 5 above.
(2) If Schneider PLC aborts in some places where the output is encouraged, generally in the middle of the situation, then look for the next step ...
|
|
Factors influencing the differential thermal analysis of instrumentation - Schneider
The operation of differential thermal analysis is simple, but in practical work, it is often found that the same sample is measured on different instruments, or different measurements are measured on the same instrument, and the results of the differential thermal curve of industrial electrical appliances are different. The high temperature, shape, area, and size of the peaks will all change. ...
|
|
Precautions for the selection of Schneider molded case circuit breaker
1. Shell current and rated current
The size of the shell current is 100 (rated current 16 25 32 40 63 80 100) 250 (rated current 160 250 400 (rated current 250 400) 630 (rated current 630A.)
...
|
|
Schneider ATV71 selection and letter meaning
The type of Schneider inverter generally reflects the rated voltage, rated power, and load requirements of the inverter (heavy or light load).
Here are two examples:
Example 1:
Schneider Inverter Type: ATV71HD11N ...
|
|
Measures to reduce the interference of Schneider inverters themselves
(1) Add inductance and capacitance on the input side of Schneider inverter to form an LC filtering network
(2) The power cord of the Schneider inverter is supplied directly from the transformer side.
(3) If conditions permit, a separate ...
|
|
Schneider soft starter fault alarm maintenance method
1. Question-F 05 (frequency error):
This problem is caused by a problem with the soft starter processing the internal power signal, which is causing errors in the power supply frequency. This situation needs to be handled by the company's product development software design engineer. Mainly start the power supply circuit design ...
|
|
Schneider Electric Innovation Summit "The future is digital"
The name of a company's product was mentioned more than anyone could remember, but on the first day of the Schneider Electric North America Innovation Summit in Atlanta on Tuesday, another word appeared even more often ...
|
|
How to choose a Schneider circuit breaker?
First, calculate the value of the current of each branch
(1) Purely resistive loads, such as bulbs, electric heaters, etc., are directly divided by the indicated power by voltage, that is, the formula I = power/220v; For example, a 20w bulb, branch current I=20W/220=0.09A electric air ...
|
|
Classification of Schneider molded case circuit breakers
1. According to the device method, it is divided into: vertical installation and horizontal installation.
2. According to the use of circuit breakers: power distribution maintenance type, motor maintenance type.
3. According to the wiring method: board front wiring, board back wiring, plug-in wiring.
...
|
|
How Schneider contactors work
How it works
Contactor refers to an electrical appliance that uses a coil to flow through an electric current to generate a magnetic field, so that the contact is closed, and then the load can be controlled. Because it can quickly block the main circuit and frequently connect with the equipment of the high-current control circuit, it has been used in electrical engineering.
|
|
"Five Ways" to Solve Life Sciences Industry Challenges – Schneider
In life sciences careers, equipment performance is critical to ensuring business continuity and useful production time. The main challenges faced by the industry include: maintaining the positive impact of environmental parameters on product quality, managing multiple systems in a "siloed" state, and using existing infrastructure sensitively and efficiently.
|
|
Schneider touch screen touch deviation causes
(1) Problem--: Contact deviation
Phenomenon 1: The direction of the finger does not coincide with the mouse arrow.
Reason 1: After installing the driver, there is no vertical contact with the bullseye center when calibrating the alignment. Deal 1: Correct the position from the beginning.
Phenomenon 2: Some districts ...
|
|
Steps for wiring and installation of rotary encoders – Schneider
Rotary encoder to roll the output pulse, through the counting equipment to know its position (PLC) we usually use incremental encoders, the incremental encoder output pulse signal can be directly input to the PLC, the high-speed counter of the PLC to count its pulse signal, in order to obtain the ...
|
|
Safety PLC is different from ordinary PLC
A safety PLC differs from conventional PLCs in that it needs to be certified for safety by a third-party professional organization and meet stringent international standards for safety and reliability. There is a need for a thorough systematic approach to the planning and testing of safety PLCs. TUV*** in Germany and FM*** in United States ...
|
|
Suppression of higher harmonics of inverter - Schneider
1. About the management of higher harmonics on the output side of the inverter
The magnetic noise skills brought about by the communication harmonic components contained in the output waveform controlled by PWM control have been increasingly used in various inverters, such as the selection of higher frequency switching components, the installation of filter devices at the output end of the inverter, etc.
|
|
Automatic control instrument construction content and procedures - Schneider
1. Construction preparation. Including the preparation of operating conditions (construction skills documents and detailed planning documents), construction organization planning, equipment list, data budget, and list of machined parts;
2. Cooperate with civil engineering majors to do a good job of embedding, ...
|
|
Frequency converters and their control – Schneider
AC inverter is the result of the high development of microcomputer and modern power electronics technology. The microcomputer is the center of the inverter, and the power electronics form the main circuit of the inverter. As we all know, the frequency of communication electricity sent from power plants is stable and constant, in our country it is 50 weeks per second ...
|
|
Schneider ATS48 soft starter issue
1. What type of ATS48 power supply is?
The control power supply of ATS48 selects communication input, and supplies power to the controller, input and output ports through internal power processing;
The control power supply of Q series products is 220V-415V;
Handling of the Y-Series ...
|
|