Application characteristics of PLC in the control of mixing plant

Create Date: 2024-8-30 12:03:23|Source: XINJE

1. High reliability

The PLC adopts a series of anti-interference methods in hardware and software, so that it can be directly installed in the industrial site and operate safely and reliably, anti-magnetic, anti-seismic and dust-proof.

                                 Application characteristics of PLC in the control of mixing plant

2. Programming is simple and easy to grasp.

3. Strong adaptability and sensitive application.

The PLC system in the control room of the mixing plant center can control the auxiliary equipment of the mixing building, such as the aggregate feeding belt of the mixing plant, the pulse control system of cement and fly ash.

4. The design, correction and debugging of the control system are convenient and the amount of work is small.

5. Powerful.

The PLC has switching input/output, analog input/output, a large number of internal intermediate relays, time relays, special relays, data registers, logic control, data processing, and analog processing.
More on that
How to adjust the parameters of the inverter starting overload-Xinjie How to adjust the parameters of the inverter starting overload-Xinjie

Motor overload: There is no need to set overload maintenance parameters in frequency conversion. The inverter generally acquiesces to the motor overload maintenance based on the motor power. Generally, it is 1.2 times 60 seconds to report the overload problem. The overload factor is not the same for different frequency converters. ...

False load connection method in the debugging of the inverter - Xinjie False load connection method in the debugging of the inverter - Xinjie

There are many novices who are not familiar with the false load about the maintenance inverter, and the maintenance inverter uses the false load to keep many of their modules, because the maintenance novice generally does not know how to do this, and now the electric light is on to clarify that the module is going to be broken. A dummy load is a load with a resistor of several hundred ohms ( ...

Diagram of the wiring of the servo motor of Xinjie Diagram of the wiring of the servo motor of Xinjie

A common source of interference in the servo control system - Xinjie A common source of interference in the servo control system - Xinjie

Radiative disturbance from space The most useful method for radiation disturbance is metal shielding. Space radiated electromagnetic fields are mainly caused by power networks, lightning, radio broadcasting, radar, etc., and are generally referred to as radiation disturbances. Its impact mainly goes through two paths: one is ...

The difference between servo and frequency conversion motors - Xinjie The difference between servo and frequency conversion motors - Xinjie

The usual inverter motor (hereinafter referred to as VFD) can only regulate the speed of the communication motor, and it can be open-loop or closed-loop, depending on the control method and VFD. This is the traditional V/F mode. The basic concept of servo is accurate, precise and fast positioning. Frequency conversion is servo ...

Inverter interference mode and treatment method - Xinjie Inverter interference mode and treatment method - Xinjie

Communication: (1) Radiation disturbance; (2) Conduction disturbance Anti-disturbing method: Regarding the disturbance signal transmitted by the radiation method, it is mainly weakened by wiring and shielding the radioactive source and the disturbed line. With regard to the disturbance signal transmitted through the line, ...

Introduction of Xinjie PLC inverter visual system Introduction of Xinjie PLC inverter visual system

XC can be divided into multiple sub-series according to the incompatibility of functions, including XC1 (economy), XC2 (foundation), XC3 (standard), XC5 (enhanced) and their corresponding expansion modules, as well as special imitation ontology, activity control models, etc. Powerful function, complete variety, can be full ...

The steps of the system put into operation after PLC overhaul - Xinjie The steps of the system put into operation after PLC overhaul - Xinjie

After overhauling and confirming that all connections of the system are correct, power on the relevant modules until the card indicator shows normal. The initiation process of the system after the scheduled repair is as follows: (1) Power supply. Turn on the power supply equipment (including the UPS...)

Xinjie six-station stator internal winding system solution Xinjie six-station stator internal winding system solution

As one of the important equipment for manufacturing motors, the six-station high-speed inner winding machine is widely used in electric fans, range hoods, purifiers, automobiles and other occupations. Now there are single station, double station, four station and six station winding machine types, and the six-station inner winding machine launched by Xinjie can reach up to 1200 times/i ...

The difference between motion controller and PLC - Xinjie The difference between motion controller and PLC - Xinjie

The motion control mainly touches the control of stepper motors and servo motors, and the control structure mode is generally: control equipment + driver + (stepper or servo) motor. The control equipment can be a PLC system, or a special automation device.

Xinjie proposes professional solutions for thermal transfer Xinjie proposes professional solutions for thermal transfer

Introduction to Thermal Transfer Transfer printing refers to a printing method that selects the corresponding pressure to transfer the graphics and text on the intermediate carrier film to the substrate, and according to the different selection pressures, transfer printing can be divided into water transfer printing, heat transfer printing, air transfer printing, screen transfer printing, low temperature transfer printing and so on. In the meantime, the heat ...

Common problems with Xinjie touch screen Common problems with Xinjie touch screen

Common problems with Xinjie touch screen Poor contact Touch screen installation problemRemove the screen from the control cabinet and perform an operational test. If there is no problem with the operation, i.e. the installation problem causes the installation size to be re-measured, do not install it too tightly so as not to squeeze the touchpad. Correspondence...

The range of use of Xinjie general inverter The range of use of Xinjie general inverter

A universal inverter is an electronic device used to control the speed of an electric motor, which can change the speed of the motor according to the demand, and then achieve higher output power and power savings. Universal inverters have a wide range of application scales and can be used for various types of electric motors, including communication motors, direct ...

PLc installation and wiring requirements - Xinjie PLc installation and wiring requirements - Xinjie

(1) The PLC shall be installed in an environment that meets the requirements of the rules. (2) In order to facilitate ventilation and disassembly, a space of more than 80mm should be left around the PLC. (3) PLC should be a vertical device and not a horizontal device, that is, the device universal is the direction in which the words on the unit panel can be read normally, otherwise the PLC ...

New models such as IoT industrial controllers and smart cameras have been launched New models such as IoT industrial controllers and smart cameras have been launched

From 14:00 to 15:20 on May 14 last year, the X-SIGHT visual brand conference with the theme of "Vision, Light Up Intelligent Manufacturing" was held online, officially announcing that Wuxi Xinjie and Intel will join hands to create a new era of intelligent manufacturing. X-SIGHT unveiled a new Intel chip-based ...

Differential amplifier overhaul method of Xinjie inverter Differential amplifier overhaul method of Xinjie inverter

Problem example 1 On the telegram OC problem, measure the 5, 6, and 7 pins of N1 to be 2V. Pin 7 is not 0V for the alarm reason. 1. The "imaginary short" rule of the amplifier is still established, and the N1 chip is good to judge, but the fault is in the bias circuit. 2. Further analysis, at this moment the differential amplifier has ...

How to choose an industrial display touch screen - Xinjie How to choose an industrial display touch screen - Xinjie

  1. Four-wire resistive touch screen: It is not afraid of dust, oil and photoelectric disturbance, and is afraid of scratches is its main defect. It is suitable for public places with fixed users, such as industrial control sites, offices, homes, etc.; 2. Five-wire resistor ...

Explanation of some common fields of inverter - Xinjie inverter Explanation of some common fields of inverter - Xinjie inverter

1. The inverter is used in the air conditioning load class Office buildings, shopping malls and some supermarkets and factories have central air conditioning, and the electricity consumption of air conditioning is very large at the peak of electricity consumption in summer. In the hot climate, Beijing, Shanghai, Shenzhen air conditioning ...

Precautions when connecting the servo and the PLC Precautions when connecting the servo and the PLC

(1) The PLC itself should be grounded according to the specified wiring specifications and grounding conditions, and attention should be paid to prevent the use of common grounding wires with Xinjie servo, and the two should be separated as much as possible when grounding. (2) When the power supply condition ...

Application of PLC programming in CNC maintenance - Xinjie Application of PLC programming in CNC maintenance - Xinjie

CNC machine tool is the abbreviation of digital control machine tool, which is an automatic machine tool equipped with a program control system. The control system is the numerical control system, the numerical control system can logically process the program with the control code or other symbolic instruction rules, and decode it, so that the machine tool action and add ...

CATEGORIES BYPASS
Customer Service Center

Online Consultation:QQ


ContactContact

Contact: Manager Huang

Contact QQ: 3271883383

Contact number: 13522565663


Scan the code to add WeChat (please save the picture first on the mobile phone)

working hoursworking hours

Weekdays: 9:00-17:00

Holidays: Only emergencies are handled

Contact us

Contact us

Contact number QQ consultation
QQ consultation

3271883383

Company address
Back to top