Motor overload: There is no need to set overload maintenance parameters in frequency conversion.

The inverter generally acquiesces to the motor overload maintenance based on the motor power. Generally, it is 1.2 times 60 seconds to report the overload problem. The overload factor is not the same for different frequency converters.

                               How to adjust the parameters of the inverter starting overload-Xinjie

1. Maintenance action and motor type settingWhen an inverter only controls one motor, the overload maintenance action should be set, and the type of motor should be selected, whether it is a general motor or a special motor for frequency conversion. If one inverter controls multiple motors, overload maintenance should be set to be invalid, and maintenance measures should be taken according to the capacity of each motor.

2. The maintenance methods that can be selected when the maintenance method is overloaded:

(1) Motor deceleration and shutdown:

(2) The motor is immediately powered off and stopped freely;

(3) The motor continues to run and gives an alarm signal;

(4) The motor is operated with limited current.

3. The setting of the fixed value of the maintenance current sets the rated current of the motor to the inverter through the relevant parameters as the fixed value of overload maintenance. There are two methods: some inverters can directly set the "rated current of the motor".

4. Overload maintenance delay time: the time when the overload current reaches the maintenance fixed value, and the maintenance will be carried out if it is exceeded; If the current value returns to the normal value within the delay time, the maintenance will be withdrawn; When the overload current exceeds the maintenance fixed value, the maintenance is carried out according to the inverse time limit.

More on that
Inverter overhaul process - Xinjie inverter Inverter overhaul process - Xinjie inverter

1) Investigation and investigation of problem phenomena. There are many kinds of inverter problem phenomena, for example, the same type of problem may have different problem phenomena, and different types of problems may have the same problem phenomenon, which brings difficulties to find the problem. However, the problem phenomenon is the basic basis for overhauling the inverter ...

Application characteristics of PLC in the control of mixing plant Application characteristics of PLC in the control of mixing plant

1. High reliability The PLC adopts a series of anti-interference methods in hardware and software, so that it can be directly installed in the industrial site and operate safely and reliably, anti-magnetic, anti-seismic and dust-proof. 2. Programming is simple and easy to grasp ...

The main role and function of TP touch screen The main role and function of TP touch screen

The primary role of the TP contact screen Supervision: Reflect the internal bit status of the PLC in various ways such as data, curves, graphics, animations, etc., store the numerical value, and then intuitively reflect the process and direction of the industrial control system. Exercise...

Leakage analysis of inverter-controlled motor - Xinjie Leakage analysis of inverter-controlled motor - Xinjie

Because the current at the input and output ends of the inverter contains high-frequency components, the leakage current formed by the high-frequency components when the inverter is driven is greater than that when the grid power supply is supplied. Because there are many varieties of circuit breakers, in some cases, even the inverter wires and motors ...

The difference between motion controller and PLC - Xinjie The difference between motion controller and PLC - Xinjie

The motion control mainly touches the control of stepper motors and servo motors, and the control structure mode is generally: control equipment + driver + (stepper or servo) motor. The control equipment can be a PLC system, or a special automation device.

The main functions of the Xinjie touch screen and PLC control system The main functions of the Xinjie touch screen and PLC control system

(1) The entire control process works under the Chinese system, and the handling is completely Chinese (2) Realize the active control of batching, blanking, mixing and concrete displacement (3) The mixing time and blanking sequence can be adjusted immediately (4) Batching, blanking, mixing ...

Xinjie launched the wireless transparent transmission module S-BOX-T Xinjie launched the wireless transparent transmission module S-BOX-T

   Wireless module introduction: W-BOX-T: Wireless WIFI module, XC, XD series can be used, occupying RS232 port; S-BOX-T S-BOX: 433MHZ MODULE, XC AND XD SERIES CAN BE USED, OCCUPYING RS232 PORT; XD-E1WT-A ...

Xinjie inverter overload protection object Xinjie inverter overload protection object

Inverters are mainly divided into two categories according to the frequency conversion method: communication/DC/communication and communication/communication inverters. AC/DC/AC inverter, also known as direct inverter, refers to the operation, the first 50Hz power frequency communication power is converted into pulsating direct current through the rectifier module unit, ...

Xinjie inverter control mode Xinjie inverter control mode

The output voltage of low-voltage general frequency conversion is 380-650V, the output power is 0.75-400kW, and the working frequency is 0-400Hz. Its control methods have gone through the following four generations. 1U/f=C Sine Pulse Width Modulation (SPWM) Control Method ...

How to properly ground the PLC - Xinjie PLC How to properly ground the PLC - Xinjie PLC

The grounding policy is nothing more than to avoid disturbance for safety, and the policy of grounding to PLC must not be attached to the disturbance at the power supply and input and output terminals, so the accurate grounding system is one of the primary methods for the PLC control system to resist electromagnetic disturbance. There are floating and direct grounding formations.

Xinjie developed professional solutions for sealing lines Xinjie developed professional solutions for sealing lines

Introduction to the glass sealing industry As a relatively old industry, the vitality of the glass industry has further burst out in the modern society, due to the social development and the improvement of people's aesthetics, the demand for glass in all walks of life is also increasing, which is also more abundant.

The relationship between PLC and inverter - Xinjie The relationship between PLC and inverter - Xinjie

Programmable manipulators (PLCs) have always played an important role in industrial field control. With the increase of the state's investment in the water supply profession, the level of automation of water plant operation has been continuously improved, and the use of PLC in the water supply profession has gradually increased. The touch screen is used with the PLC, so that the operation of the PLC ...

Xinjie PLC inverter visual system Xinjie PLC inverter visual system

XC can be divided into multiple sub-series according to the incompatibility of functions, including XC1 (economy), XC2 (foundation), XC3 (standard), XC5 (enhanced) and their corresponding expansion modules, as well as special imitation ontology, activity control models, etc. Powerful function, complete variety, can be full ...

Common models of Xinjie PLC and their characteristics Common models of Xinjie PLC and their characteristics

Model introduction of Xinjie PLC   XC series Including XC1 (economy), XC2 (basic), XC3 (standard), XC5 (enhanced), XCM (sport), XCC (high-performance) and their corresponding expansion modules, as well as special analog bodies and other special models. XC series PLC can be ...

Xinjie fast positioning switching power supply method Xinjie fast positioning switching power supply method

Switch Mode Power Supply (SMPS) will cause the base of the switch tube to fail to get the switching pulse and intermittent operation due to the short circuit of the load, the failure of the vibration circuit itself and the loss of control of the protection circuit, which makes it difficult to locate the shortcomings of SMPS. Difficult to repair ...

Introduction of Xinjie PLC inverter visual system Introduction of Xinjie PLC inverter visual system

XC can be divided into multiple sub-series according to the incompatibility of functions, including XC1 (economy), XC2 (foundation), XC3 (standard), XC5 (enhanced) and their corresponding expansion modules, as well as special imitation ontology, activity control models, etc. Powerful function, complete variety, can be full ...

Advantages and opportunities of domestic PLC - Xinjie Advantages and opportunities of domestic PLC - Xinjie

At present, in the domestic PLC market, there are many kinds, but there are not many domestic PLC manufacturers with real strength, most of the domestic PLC is not an individual who does not have the qualification of a legal person, or a single-chip microcomputer enthusiast, from the domestic PLC factory to buy the underlying programming code or buy a domestic PLC chip (the domestic P that burns the underlying code...

The allowable length of the cable between the inverter and the motor - Xinjie The allowable length of the cable between the inverter and the motor - Xinjie

The voltage waveform output by the inverter is similar to a sine wave, but not a real sine wave. Its waveform contains a large number of harmonic components, especially the higher harmonics will increase the output current of the inverter, form the motor winding heating, produce vibration and noise, accelerate the aging of insulation, and even ...

The reason why the inverter damages the motor bearing - Xinjie The reason why the inverter damages the motor bearing - Xinjie

The damage of the inverter to the motor contains two aspects, the damage of the stator winding and the damage of the bearing, this damage usually occurs in a few weeks to more than ten months, the detailed moment and the inverter brand, the motor brand, the motor power, the inverter carrier frequency, the cable length between the inverter and the motor, the ring ...

PLc installation and wiring requirements - Xinjie PLc installation and wiring requirements - Xinjie

(1) The PLC shall be installed in an environment that meets the requirements of the rules. (2) In order to facilitate ventilation and disassembly, a space of more than 80mm should be left around the PLC. (3) PLC should be a vertical device and not a horizontal device, that is, the device universal is the direction in which the words on the unit panel can be read normally, otherwise the PLC ...

CATEGORIES BYPASS
Customer Service Center

Online Consultation:QQ


ContactContact

Contact: Manager Huang

Contact QQ: 3271883383

Contact number: 13522565663


Scan the code to add WeChat (please save the picture first on the mobile phone)

working hoursworking hours

Weekdays: 9:00-17:00

Holidays: Only emergencies are handled

Contact us

Contact us

Contact number QQ consultation
QQ consultation

3271883383

Company address
Back to top