In the process of long-term use of KUKA robots, with the increase of operation time, various parts and parts will present various problems due to the influence of many factors such as friction, corrosion, vibration, impact, bump, etc., so only by dealing with these problems and insisting on the normal operation of the robot can we ensure the smooth progress of production. Xiaobian summarizes the top ten common problems and treatment solutions of KUKA robots.
1 The boot coordinate system is invalid
The world coordinate system is based on the gun head, in which all the actions of the robot are completed according to the gun head as the vertex, and the XYZ direction does not change the direction of the gun. If the robot moves in the world coordinate system and the gun head changes direction with it, it means that we didn't pick anything after turning it on.
Solution: Configure the current east/west coordinates → → east-west number →1
2 Expert Login
In general, when we want to edit the program after booting, we must first log in to the expert level, which will help us operate.
Solution: Configure → user group → expert → login → password KUKA → login
3 Set END
We found that there is no end to the new program, so we need to set the end.
Solution: Configure → Miscellaneous → Editor → a line of DEF
4 The first section of the program is set to the home direction
When editing the program, the first instruction should be set to the home orientation, which is the standard for us to directly find the home orientation at the end, which can save the operation time of the manual mobile robot.
5 Manually enclose the output signal
When we are testing that the program may be used normally (the output signal has been turned on), sometimes we will encounter unexpected situations, such as the risk of collision in the program path, or the failure of the warm-up, the program error, etc., at this time, we have to manually close the output signal.
After the problem is solved, we can use the KCP to turn on the output signal again. (In the meantime, our output signal is 3 is low-pressure oxygen, 4 is high-pressure oxygen, and 5 is propane)
Solution: Display → input/output → digital output→ hold down the number of drive → (closed or open)
6 6D mouse failure
The system indicates that the 6D mouse still has a voltage or other prompts, the mouse fails, we can release the driver at this time, press it from the beginning and wait for the driver indication I to turn green.
7 Copy the program from your computer
Copy the program in the computer, so that after the program in the C drive is lost, we can copy and use it from the D drive or the external mobile U disk.
Solution: After the expert logs in→ press Num (Num is gray on the display at this moment, and then press it to convert back) → CTRL(2)+Esc→ computer C disk →KRC→ROBOTER→KRC→R1→Program
8 Robot Maintenance
When the robot crashes, it will start automatic maintenance, that is, the robot has a maintenance system at the A6 axis, when the tension spring is bent and deformed after the crash, the system will stop all operations after receiving the signal, we can't operate the robot at this moment, at this time we have to turn off the maintenance switch first.
Processing scheme: configure → input/output terminal→ external automatic → promise movement→ change 5 to 1025→ at this moment the robot is not subject to system maintenance constraints to move, pay attention to adjust the direction of movement of the robot, adjust the speed of movement, get out of the collision point, and adjust the value of "promise movement" to 5 after arriving at the safety all-round.
9 In the following cases, KUKA robots need to calibrate the zero point from scratch
If the robot is not completely enclosed, the zero point will be lost when the battery is depleted.
When the robot hits a hard limit, it loses the zero point. Manually remove the zero point.
The boot fails, and the zero point is lost when the time is turned off directly.
10 Program Data Parameters
The cutting speed is 0.005m/s for both straight and circular arcs, and the acceleration is 1%
The robot movement speed PTP is 20% or 10%
Linear moving speed (non-incision) 0.05m/s, acceleration 70%
Output signal: 3 is low-pressure oxygen, 4 is high-pressure oxygen, 5 is propane
|
More on that
|
Explanation of the BAS program of the KUKA robot
There is a program called BAS.SRC under the R1System in the KUKA robot program directory, which is mainly used to set the number of parameters related to the robot motion, such as coordinate system, velocity, acceleration, etc.
One. Online forms
Let's take a look at how to use the commonly used online form.
|
|
The difference between collaborative robots and traditional robots is KUKA robots
Collaborative robots are only a very important subcategory in the entire industrial chain of industrial robots, which has its best advantages, but the disadvantages are also obvious: in order to control the force and bump ability, the operation speed of collaborative robots is relatively slow, generally only one-third to one-half of traditional robots. ...
|
|
Structure of the KUKA robot vision system
1. Optical imaging module.
The module can be divided into two parts: lighting system planning and lens optical system planning.
Lighting planning is to study the optical characteristics, distance, object size, scenery characteristics, etc. of the measured object, and reasonably plan the intensity, color, and ...
|
|
KUKA robot Win10 installation wv compatible method
One. Outline:
With win10 system, after installing WoV4.0.X or WoV5.0.x, WoV will stop working when the bus configuration is turned over:
When I was ready to connect to the bus online, I found that there was no network card adapter to choose from:
And there is an error message in the information window:
...
|
|
Analysis and solution of vibration fault of KUKA AC servo motor
(1) If the rotor of a KUKA motor is unbalanced, and the dynamic balance of the motor rotor is defective or deteriorates after use, an oscillation source similar to an oscillating motor may occur.
(2) Twists and turns of the hinge, the condition of the twists and turns of the hinge ...
|
|
Precautions for long-term robot downtime – KUKA robots
1. Acknowledgment before booting
1.1 There may be water stains on the site after 5S cleaning, please check whether the inside and outside of the controller and the robot body are boring to prevent the formation of a short circuit.
1.2 Determine whether the input voltage of the control cabinet is correct before powering on. R-30iA、R-30iB、R-30iB PLUS ...
|
|
Functional characteristics of industrial robots - KUKA robots
The functional characteristics of industrial robots affect the operating power and reliability of robots, and the following functional policies should be considered in the planning and selection of robots:
(1) Leisure: Leisure: Leisure is the primary policy to measure the skill level of robots.
|
|
KUKA Robot Alternative Package Addition Method
How to use alternative software packages for KUKA robots
Teach Pendant Device Method Login Administrator
Click Get Operational > Auxiliary Software
Click New Software
Click Configure
Click Path Picking
Select the corresponding folder in the USB flash drive and click Save
...
|
|
How the KUAK robot CIRC operates
1. Auxiliary points
Type: POS, E6POS, FRAME If all the weights of the auxiliary points are not given, the controller will apply the value of the previous azimuth to the short weight. The postural angle within an auxiliary point, as well as the condition and data, are in principle overlooked. The track is not approaching the auxiliary point. ...
|
|
Advantages of KUKA Robot's standard four-axis industrial handling robot
Advantage:
Reasonable mechanical structure and compact design
4 degrees of freedom AC servo motors
Absolute position encoders
All shafts are equipped with holding brakes
Specific loads and inertia are designed to optimize speed and motion characteristics
The arm of the ...
|
|
Structural features of industrial robots - KUKA robots
1. Programming
More advanced automation is sensitive from the start. Industrial robots can be programmed to respond to changes in the environment. As a result, they can play a very good role in small groups, in different parts of the production system, in equal and efficient processes.
...
|
|
Advantages and disadvantages of two programming methods for robots – KUKA robots
Teach-in programming methods
At present, a considerable number of robots still use the teach-in programming method. The robot can be applied immediately after the teach-in, and at the time of reproduction, the robot repeats the tracks and various operations stored in the memory during the teach-in, and the process can be repeated several times if required.
Forte:...
|
|
The payload setting method for the KUKA robot
1. Problems in the load setting of KUKA robots
In fact, there is only one purpose, the appropriate load, under the appropriate driving force, the manipulator can withstand the inertia moment that satisfies both static and dynamic, so as to ensure that the electrical control system controls the manipulator.
and other machines ...
|
|
KUKA welding robot operation specifications
Routine safe operation and maintenance of KUKA welding robots.
KUKA welding robot operation I must go through professional training, master the use of system indicators and buttons, and be familiar with the most basic equipment knowledge, safety knowledge and precautions before being able to take up the post.
Before booting up KUKA ...
|
|
Advantages of robotic welding – KUKA robots
Very experienced welders are able to meet the requirements of the welding process precisely and the welding interface is very beautiful. However, welding can actually be done better by using robots. Because even the best welders can't match the consistency, speed and power of a machine. Machine...
|
|
Frequently Asked Questions for Industrial Welding – KUKA Robots
What is Robotic Welding?
Robotic welding is the process of using machines to perform industrial welding tasks. The idea of using welding robots in the robotics industry began in the 1980s, when welding robots found their place on the production line. Nowadays, the role of robotics in welding ...
|
|
Zero-point failure analysis of KUKA robots
1. Reasons for zero point failure:
Before analyzing the cause of zero-point failure, let's first clarify a problem.
For a long time, we have been calling this fault "zero point drop", which is an inaccurate depiction. The zero point parameter of the KUKA robot will not be "lost", it is remembered ...
|
|
Robot welding speed – KUKA robots
1. Robot welding can improve the output power
The six-axis welding robot has a short response time and fast action. The welding speed is 50-160cm/min, which is much higher than that of manual welding (40-60cm/min). The bot does not abort during operation. As long as external hydroelectric conditions are ensured, ...
|
|
Coordinate conversion criteria for KUKA robots
Those who have used KUKA robots should know that to indicate the orientation of a robot's Cartesian coordinate system, FRAME/POS/E3POS/E6POS data will be used, where:
-X/Y/Z: indicates the rectilinear coordinates of the Cartesian coordinate system;
-A/B/C: indicates Cartesian coordinates ...
|
|
The KUKA robot adjusts the bias operation procedure
If the initial adjustment is lost (e.g. after a motor replacement or a bump), the initial adjustment is reverted. Since the learned error persists after the adjustment is lost, the KUKA robot calculates the initial adjustment. Before checking an axis, it is necessary to complete the ...
|
|