Schneider miniature circuit breaker code marking method
For example: 1-C65N-C20A/2P+VE+30mA+SD, the meaning of each item is:
1--------- identification number
C65 ------ serial code
N -------- breaking ability, N is 6000A, H is 10000A, L is 15kA
C -------- trip curve, B is electronic maintenance, C is power distribution maintenance, and D is power maintenance
20A------ rated current, 1, 2, 4, 6, 10, 16, 20, 25, 32, 40, 50, 63A
Schneider circuit breaker
2P ------- number of poles, there are 1, 2, 3, and 4 poles
VE ------- residual current accessories, including VE, VEG, VM, VEA, VM, VM is electromagnetic
30mA----- residual operating current, 30, 100, 300mA
SD ------- optional accessories, including MX, OF, MN, MV, SD, TM, ATm, of which SD is the auxiliary contact.
(Other brands of miniature circuit breakers are similar)
In addition, Schneider miniature circuit breakers also include new products C120, EA9, INT125 series products
Molded case circuit breaker
Schneider molded case circuit breakers are common NSX, NSE, EZD, NSC series products.
Example: NSX100N TMD100 3P3D
NSX --------- product family
100--------- rated current, 100, 250, 250, 400, 630A
N ------------ breaking ability, there are F is 36KA N is 50KA H is 70KA L is 100KA
TMD -------- trip actuator, with TMD-Thermomagnetic Trip MIC2.2 MIC5.2A 5.2E 6.2A 6.2E electronic tripper
100 --------- 16 25 32 40 50 63 80 100A at 100 A practice
There are 80 100 125 160A under 160A
There are 125 160 200 250A under 250A
There is 400A under 400A
There is 630A under 630A
The number of poles ------ 3P3D has 3P2D, 3P3D, 4P3D, 4P4D
Frame circuit breaker
Schneider frame circuit breakers are available in the MT MTE NW series
Frame circuit breaker (3 photos)
|
More on that
|
Electrical Control Line Fault Analysis Method - Schneider
1) Survey and research method. The investigation and research method is to "see", "listen", "smell", "touch" and "ask" to understand the significant faulty phenomena; After visiting the operator, understand the cause of the problem; A common way to help find faults after consulting others or consulting information ...
|
|
Schneider Electric Innovation Summit "The future is digital"
The name of a company's product was mentioned more than anyone could remember, but on the first day of the Schneider Electric North America Innovation Summit in Atlanta on Tuesday, another word appeared even more often ...
|
|
Schneider circuit breaker maintenance method
1. Insist that the air is moist or unclean, and the pipes are not clean, which may have the following consequences:
(1) The wet gas is decomposed into mixed gases such as hydrogen and oxygen under the effect of arcing, destroying the insulation between the fractures after the main contact is broken, which is difficult to arc or arc re-ignition, and in severe cases, arc extinguishing will be formed.
|
|
Schneider inverter debugging steps and brief description
Commissioning process of the Schneider 61 series
1. Preparations
1. Measure insulation. Connect the power supply side (R.S.T) and the motor side (U.V.W) of the inverter
Disconnect the cable, insulate the cable with a 500 megaohm or 1000 megaohm shake meter, and if it meets the requirements, restore it.
|
|
The difference between vector inverter and general-purpose inverter - Schneider
There are two main differences between vector inverters and general-purpose inverters. One is high control accuracy, and the other is high output torque at low speed.
Vector special inverter:
The operating principle of the vector special inverter is to carry out inverter after rectification, ...
|
|
For the first time, Schneider presents a new lightweight MES in packaging
Packaging Lightweight MES is a production line and workshop-level digital management and processing solution created by Schneider Electric based on more than 20 years of experience in packaging machine automation, combined with the digital transformation needs of the FMCG (Consumer Packaged Goods) profession, which can be widely used in food and beverage, life ...
|
|
The difference between Schneider UPS and EPS power supply
1. Different safety standards
UPS is mainly used to protect users' equipment or business from economic loss, and its product technical certification mainly includes Thiel certification, CQC certification, etc. The development of EPS power supply stems from the sudden failure of the power grid, in order to ensure the power safety and fire linkage needs, it can be supplied immediately.
|
|
The difference between an inverter and a servo drive – Schneider
In terms of frequency converters:
The abbreviated inverter can only regulate the speed of the communication motor, and the open-loop or closed-loop can be determined depending on the control method and the inverter, which is the traditional V/F control method. Now many of the frequency conversion has been set up by mathematical models, which will communicate electricity ...
|
|
Schneider inverter maintenance power settings, waveform test problems
1. After the inverter is repaired, the power number needs to be modified, don't forget it
Generally, an inverter corresponds to a power number (also known as the number of horsepower), for example, a 75 kilowatt inverter is set under heavy load, and 100 kilowatts is set under light load. In this way, the customer will not use it to present ...
|
|
Analysis of the causes of frequent overcurrent alarms of inverters - Schneider
(1) Caused by incorrect parameter setting.
If the acceleration time of the inverter is set too short, the change of the output frequency of the inverter far exceeds the change of the motor frequency, and when the inverter is started, it will trip due to overcurrent. Adjusting the acceleration time accordingly to different load conditions can eliminate this problem.
|
|
Switching power supply circuit fault phenomenon - Schneider
1. The power supply voltage of the secondary load is 0V. There is no response after the inverter is powered on, there is no indication on the operation display panel, and the 24V and 10V voltages of the measurement and control terminals are 0V. Check that the charging resistance or pre-charging circuit of the main circuit is correct, which can be identified as a switching power supply fault. The overhaul process is as follows:
1 ...
|
|
Schneider servo drive fault code
1. AL001: overcurrent, the current value of the main 2113 circuit exceeds the motor instantaneous 5261*** high current value 1.5 times when the action is 4102.
2. AL002: overvoltage, the voltage value of the main return 1653 channel is higher than the standard value.
3. AL003: low voltage, the voltage value of the main circuit is lower than the standard.
|
|
Maintenance and overhaul of frequency converters and soft starters
The protection and viewing of inverters and soft starters is a useful means to prevent occasional equipment problems. In order to be useful for protection and inspection, inspection orders should be created to record and save the inherent characteristics of the equipment and the stability of the constituent parts, so as to prevent problems and problems that occur.
|
|
Inverter fault repair - Schneider
To repair the output board driven by the inverter, we must first investigate whether the components on the PCB board are burned out, replace them first, and then analyze what causes the burned out and deal with this problem.
And then...
|
|
Schneider UPS power supply common fault analysis
1. When there is mains power, the UPS output is normal, and when there is no mains power, the buzzer beeps for a long time and there is no output
Fault analysis: From the phenomenon to identify some problems of the battery and inverter, you can view it according to the following procedures:
1. Check the battery voltage to see if the battery is undercharged.
|
|
Schneider inverter ATV61 OPF failure analysis
Q: 250KW ATV61 with 250KW fan, when decelerating to low speed, OPF (motor missing three-phase) problem will be reported occasionally. There are no contactors or switches between the inverter and the motor.
Answer: This situation seems to be a problem with the inverter, which is a false alarm. Not really! The fan is decelerating ...
|
|
Instrumentation mechanical equipment system - Schneider
1. Power system:
The wire and cable products selected in the power system mainly include overhead bare wires, busbars (busbars), power cables (plastic cables, oil-paper power cables (fundamentally replaced by plastic power cables), rubber cables, overhead insulated cables), branch cables (replacing part of the busbars), ...
|
|
Schneider inverter series at a glance
1. ATV11 series
The Schneider ATV11 series is primarily used in three-phase asynchronous motor inverters with a power range of 0.18 to 2.2 kW.
2. ATV12 series
ATV12 Schneider inverter for power scale 0.18k...
|
|
The comprehensive utility of the inverter control circuit - Schneider
(1) The operation circuit compares the external speed, torque and other instructions with the current and voltage signals of the detection circuit to determine the output voltage and frequency of the inverter.
(2) The voltage and current detection circuit are the same as the main loop potential ...
|
|
AC-DC inverter composition and function - Schneider
The AC-DC inverter main circuit consists of three components: the rectifier main circuit, the center circuit and the inverter circuit.
1. The main circuit is the power replacement part that provides voltage regulation and frequency regulation power supply for the asynchronous motor, and the main circuit of the inverter can be roughly divided into two categories: the voltage type is the voltage source ...
|
|