The reason for the abnormal alarm in PLC - Xinjie

Create Date: 2024-8-30 12:03:23|Source: XINJE

With the continuous development of industrial automation, PLC is widely used in industrial control professions. No matter how strong the PLC product is, it often fails to work normally. All brands of PLC have the function of self-diagnosis, but the skill of PLC repair is that when the PLC is abnormal, it should be fully used to self-diagnose and analyze the cause of the problem, and then accurately find the problem.

                              The reason for the abnormal alarm in PLC - Xinjie

1. The CPU is abnormal

When the CPU is abnormally alarmed, you should check all the devices connected to the internal bus of the CPU unit. The specific method is to replace the units that may have problems sequentially, find out the problem units, and deal with them accordingly.

Second, the memory is abnormal

When the memory is abnormally alarmed, if it is a problem with the program memory, it is still not possible to solve the problem after reprogramming, which may be caused by noise disturbance and the program is changed, otherwise the memory should be replaced.

3. The input/output unit is abnormal, and the expansion unit is abnormal

When such an alarm is generated, you should first check the connection of the connector and cable connection between the input/output unit and the expansion unit, and then replace the unit after confirming the unit caused by the problem.

4. Non-performance of procedures

In general, you can check it according to the steps of input-program performance-output

(1) Input viewing is identified by the input LED indicator or by an input monitor consisting of a writer. When the input LED is not lit, it can be preliminarily determined that it is a problem with the external input system, and then cooperate with the multimeter to check. If the output voltage is abnormal, it can be determined that the input unit is a problem. When the LED is on but the internal monitor is not visible, it can be considered a problem with the input unit, CPU unit, or expansion unit.

(2) The program is viewed through the monitor on the writer. When the contact situation of the ladder diagram is inconsistent with the result, it is a program error (such as the use of two layers of internal relays, etc.), or the operation part is a problem.

(3) Output view: available output LED indicator identification. When the calculation effect is correct and the output LED indicates the error, it can be considered as a fault of the CPU unit and I/O interface unit. When the output LED is bright but there is no output, it can be determined that there is a problem with the output unit or an external load system.

Because of the different PLC models, the connection methods of I/O and LED are different (some are connected to the interface of the I/O unit, and some are connected to the I/O unit). Therefore, the scale of the problem judged by the LED is also different.

5. Some procedures are not performed

The viewing method is the same as the previous item, but if the input time of the counter, step controller, etc. is too short, there will be a problem of no photo, in this case, you should check whether the input time is large enough, and the verification can be carried out according to the connection of the input time (the maximum response time of the input unit + the calculation scan time multiplied by 2).

6. If the power supply is powered off for a short time, the program content will also disappear

(1) In this case, in addition to checking the battery, check as follows.

(2) Check by repeatedly turning on and off the PLC's own power supply. In order for the microprocessor to operate correctly, the PLC is equipped with a circuit for the initial reset point and a circuit for saving the program when the power supply is disconnected. If there is a problem with such a circuit, the program cannot be saved. Therefore, you can check the power supply on and off.

(3) If the battery abnormal alarm still appears after the battery is replaced, it can be determined that it is caused by the abnormal increase of the leakage current of the memory or external circuit.

(4) The on/off of the power supply always occurs synchronously with the machine system, and the noise impact of the machine system can be viewed. This is because the disconnection of the power supply is often associated with the operation of the machine system, and most of it is caused by the strong noise generated by the motor or winding.

7. PROM cannot be operated

First, check whether the PROM articulation is excellent, and then determine whether the chip needs to be replaced.

8. After the power supply is re-put into or reset, the action stops

This problem can be thought to be caused by noise disturbance or poor contact within the PLC. The cause of noise is generally caused by the reduction of the capacitor capacity of the small capacitor or the poor function of the component on the circuit board, and the cause of the poor contact can be viewed by gently tapping the PLC body, and the insertion of the cable and adapter can also be checked.

More on that
Common problems with Xinjie touch screen Common problems with Xinjie touch screen

Common problems with Xinjie touch screen Poor contact Touch screen installation problemRemove the screen from the control cabinet and perform an operational test. If there is no problem with the operation, i.e. the installation problem causes the installation size to be re-measured, do not install it too tightly so as not to squeeze the touchpad. Correspondence...

The application field of PLC - Xinjie The application field of PLC - Xinjie

At present, PLC has been widely used in various industries such as steel, petroleum, chemical industry, electric power, building materials, machinery manufacturing, cars, textile, transportation, environmental protection and culture and entertainment at home and abroad. 1 ...

The difference between PLC, DCS and FCS - Xinjie The difference between PLC, DCS and FCS - Xinjie

The fundamental characteristics of the three major control systems of PLC, DCS and FCS At present, there are three major control systems in the operation of industrial processes in continuous process production, namely PLC, DCS and FCS. The fundamental characteristics of each of them are as follows: 1PLC (1) From the development of switching control to sequential operation...

Superheat treatment method of Xinjie inverter drive motor Superheat treatment method of Xinjie inverter drive motor

Why does the motor driven by the inverter overheat? This is due to the fact that the voltage of the inverter drive motor contains a rich high-frequency component. The voltage waveform of the inverter-driven motor is not a sine wave voltage, but a pulse-width modulation (PWM) voltage. According to Fu Liye's analysis, this waveform ...

The constituent department of PLC control cabinet - Xinjie PLc The constituent department of PLC control cabinet - Xinjie PLc

1. Air opening: a total air switch, which is the power control of the entire cabinet. I believe that every cabinet must have one thing. 2. PLC: This should be selected according to the needs of the project. For example, if the project is small, it can be an integrated PLC, but if the project is more ...

The difference between servo and frequency conversion motors - Xinjie The difference between servo and frequency conversion motors - Xinjie

The usual inverter motor (hereinafter referred to as VFD) can only regulate the speed of the communication motor, and it can be open-loop or closed-loop, depending on the control method and VFD. This is the traditional V/F mode. The basic concept of servo is accurate, precise and fast positioning. Frequency conversion is servo ...

Precautions for installation of Xinjie servo motor Precautions for installation of Xinjie servo motor

The MS series of servo motors can be installed in either the horizontal or vertical direction. However, if it is installed incorrectly, or in an unsuitable place, it can shorten the life of the motor or cause unexpected accidents.   Storage temperature In the unpowered state ...

Advantages and opportunities of domestic PLC - Xinjie PLC Advantages and opportunities of domestic PLC - Xinjie PLC

At present, in the domestic PLC market, there are many kinds, but there are not many domestic PLC manufacturers with real strength, most of the domestic PLC is not an individual without legal person qualifications, or a single-chip microcomputer enthusiast, from the domestic PLC factory to buy the underlying programming code or buy a domestic PLC chip (the domestic P ...

Xinjie in a nutshell! Xinjie in a nutshell!

As the only domestic brand among the top 10 small PLC shopping malls in China, Xinjie has broken through the core shopping malls dominated by international brands for more than ten years, and the unswerving commitment of the leader Li Xin to independent development can be seen. ...

Xinjie launched a new product - I2C intelligent industrial controller Xinjie launched a new product - I2C intelligent industrial controller

On April 21, with the theme of "I2C More Intelligent Industrial Control", the new product launch and brand promotion conference of Xinjie Intelligent Control was successfully held at Gusu Shangri-La Hotel. At the meeting, in addition to the release of new products, it also discussed the connotation of intelligent industrial control, application scenarios, and the outlook of shopping malls.

The inverter operates normally in a humid environment The inverter operates normally in a humid environment

1. Look inside the electrical cabinet, for example, to see if there are small animals and their droppings, and whether there are condensation or water marks. If the dust in the cabinet is large, please clear the external radiator of the inverter. 2. Assuming that the humidity is relatively large, there are condensation or water marks, please open the cabinet door first, ventilate and dehumidify, you can use electric fans, etc.

Xinjie inverter maintenance method Xinjie inverter maintenance method

In the instruction manual of the inverter, there is a column that discusses in detail the fault code display of the inverter.   1. Short-circuit maintenanceIf there is short-circuit maintenance on the side of the inverter's operation, "0" means that the inverter has short-circuit elements inside or outside. There are several reasons for this ...

Why does the industry use PLC without single-chip microcomputer-Xinjie Why does the industry use PLC without single-chip microcomputer-Xinjie

First, let's talk about PLC first About PLC, don't just see the PLC module, but a variety of PLC modules + host computer channel software to form a well-structured control systemPLC module is composed of microprocessor + memory + firmware + programming to complete the modular function. PLC control system ...

Xinjie plc programming software XCPPro Xinjie plc programming software XCPPro

XCPPro is a professional XCPPl programming software, which is a new XC series PLC programming software, which can be used normally by making corresponding configurations in XCPPro. The software supports WindowsXP32-bit Win764-bit system. ...

Can the Xinjie touch screen software be installed or used normally? Can the Xinjie touch screen software be installed or used normally?

Why can't the touch screen software be installed or used properly? 1. Before the device, please close the antivirus software and system optimization things; 2. After the device is successful, double-click the software convenience icon on the desktop, "Please set the display to be true color" prompt ...

XLH Series 32-Axis EtherCAT Bus Controller - Xinjie XLH Series 32-Axis EtherCAT Bus Controller - Xinjie

Following the launch of XDH, XLH series 16-axis and other models, Xinjie has achieved good market feedback, and the XLH-30A32 low-profile controller to be launched today can be expanded by 32 bus nodes, and has better performance in basic performance and bus control ability. ...

Xinjie WIFI wireless communication module W-BOX Xinjie WIFI wireless communication module W-BOX

W-BOX is a 2.4GHzWifi-based wireless communication module independently developed and recently launched by Xinjie in line with the trend of wireless communication. W-BOX can be connected with wireless AP (hotspot) in various occasions to complete long-distance monitoring of PLC and overall control of PLC wireless networking in various environments.

The application of Xinjie PLC in central air conditioning The application of Xinjie PLC in central air conditioning

One. How the system works The fresh air blown in by the fresh fan enters the room through the heating exchanger, refrigeration exchanger, and humidifier. In the room, the signals measured by the temperature, humidity, and differential pressure detectors are reflected to the controller. The heating and refrigeration exchanger is controlled by a digital manipulator by a reaction signal ...

Troubleshooting methods for unsuccessful touch screen penetration Troubleshooting methods for unsuccessful touch screen penetration

A:a. Now only the TGM series touchscreen supports penetration as well as network connectivity b. At present, the penetration function only supports the PLC class of Xinjie that supports the Xnet protocol, and other models do not support it temporarily c. Check whether the computer has the latest version of config installed serial port equipment tool (soft ...

Anti-interference countermeasures for PLC and touch screen - Xinjie Anti-interference countermeasures for PLC and touch screen - Xinjie

1. Select the power supply with excellent performance and press the disturbance introduced by the power grid The power supply of the PLC controller is powered by a non-power line, and is powered by a special line directly led by the main bus of the low-voltage distribution room. Barrier transformer should be selected, the transformer capacity should be 1.2-1.5 times larger than the actual need, and can be used in the barrier...

CATEGORIES BYPASS
Customer Service Center

Online Consultation:QQ


ContactContact

Contact: Manager Huang

Contact QQ: 3271883383

Contact number: 13522565663


Scan the code to add WeChat (please save the picture first on the mobile phone)

working hoursworking hours

Weekdays: 9:00-17:00

Holidays: Only emergencies are handled

Contact us

Contact us

Contact number QQ consultation
QQ consultation

3271883383

Company address
Back to top