1. Grounding problems

The grounding requirements of the PLC system are relatively strict, and it is best to have an independent dedicated grounding system, and it should also be noted that other equipment related to PLC should also be reliably grounded.

When multiple circuit grounding points are connected together, unexpected currents can be generated, causing logic errors or damaging circuits.

The reason for the different ground potentials is usually due to the fact that the ground points are separated too far from the physical area, when the devices that are very far apart are connected by communication cables or sensors, the current between the cable and the ground will flow through the entire circuit, even if it is a short distance, the load current of a large device can change between it and the ground potential, or an unpredictable current can be directly generated by electromagnetic action.

Between power supplies at incorrect grounding points, there is a risk of a devastating current being generated in the circuit to the point of destroying the device.

The PLC system generally uses a one-point grounding method. In order to improve the ability to resist common mode interference, the shielding floating technology can be used for analog signals, that is, the shielding layer of the signal cable is grounded at one point, the signal loop is floating, and the insulation resistance with the ground should not be less than 50MΩ.

2. Interference processing

The environment of the industrial site is relatively harsh, and there are many high and low frequency interference. These interferences are typically introduced into the PLC via cables connected to field devices.

In addition to grounding measures, some anti-interference measures should be taken in the design selection and laying of cables:

(1) The analog signal is a small signal, which is very susceptible to external interference, and a double-layer shielded cable should be selected;

(2) High-speed pulse signals (such as pulse sensors, digital disks, etc.) should be shielded cables, which not only prevent external interference, but also prevent the interference of high-speed pulse signals to low-level signals;

(3) The frequency of communication cables between PLCs is high, and the cables provided by the manufacturer should generally be selected, and in the case of low requirements, twisted pair cables with shielding can be selected;

(4) Analog signal lines and DC signal lines cannot be routed in the same trunking as AC signal lines;

(5) The shielded cable introduced and led out in the control cabinet must be grounded, and should be directly connected to the equipment without passing through the terminal;

(6) AC signals, DC signals and analog signals cannot share a single cable, and the power cable should be laid separately from the signal cable.

(7) In the on-site maintenance, the methods to solve the interference are: the interfered line adopts shielded cables and relays; Add anti-interference filtering code to the program.

3. Eliminate the capacitance between the lines to avoid malfunction

There is a capacitance between the wires of the cable, and a qualified cable can limit this capacitance to a certain range.

Even if the cable is qualified, when the cable length exceeds a certain length, the capacitance value between the wires will exceed the required value, and when the cable is used for PLC input, the capacitance between the lines may cause PLC malfunction, and many incomprehensible phenomena will occur.

These phenomena are mainly manifested as: the wiring is correct, but the PLC has no input; The input that the PLC should have is not, and the input that should not be there is, that is, the PLC input interferes with each other. To address this problem, it is necessary to:

(1) Cables twisted together using cable cores;

(2) Minimize the length of the cable used;

(3) Use cables separately for inputs that interfere with each other;

(4) Use shielded cables.

4. Selection of output module

The output modules are divided into transistors, triacs, and contact types:

(1) The switching speed of the transistor type is the fastest (generally 0.2ms), but the load capacity is the smallest, about 0.2-0.3A, 24VDC, suitable for fast switching, signal contact equipment, generally connected with frequency conversion, DC devices and other signals, should pay attention to the influence of transistor leakage current on the load.

(2) The advantages of the thyristor type are that there is no contact, it has the characteristics of AC load, and the load capacity is not large.

(3) The relay output has the characteristics of AC and DC load, and the load capacity is large. In conventional control, relay contact output is generally selected first, and the disadvantage is that the switching speed is slow, generally about 10ms, which is not suitable for high-frequency switching applications.

5. Overvoltage and overcurrent treatment of inverter

(1) When reducing the given motor to slow down the operation, the motor enters the regenerative power generation braking state, and the energy fed back by the motor to the inverter is also higher, and these energies are stored in the filter capacitor, so that the voltage on the capacitor rises, and soon reaches the setting value of DC overvoltage protection and trips the inverter.

The treatment method is to take measures to add a braking resistor outside the inverter, and use the resistor to consume the regenerative electrical energy fed back to the DC side of the motor.

(2) The inverter has a plurality of small motors, and when one of the small motors has an overcurrent fault, the inverter will alarm the overcurrent fault, causing the inverter to trip, which will cause other normal small motors to stop working.

Solution: Install a 1:1 isolation transformer on the output side of the inverter, when one or several small motors have an overcurrent fault, the fault current DC impact transformer instead of the inverter, so as to prevent the inverter from tripping. After the experiment, it worked well, and there was no failure that the previous normal motor was shut down.

6. Mark the input and output for easy maintenance

The PLC controls a complex system, and what can be seen is the upper and lower rows of staggered input and output relay terminals, the corresponding indicator lights and PLC numbers, like an integrated circuit with dozens of legs. Anyone who doesn't look at the schematic diagram to troubleshoot faulty equipment will be helpless and will be particularly slow to find faults. In view of this situation, we draw a table according to the electrical schematic diagram, paste it on the console or control cabinet of the equipment, and indicate the electrical symbol corresponding to the number of each PLC input and output terminal, the Chinese name, that is, the functional description of each pin similar to the integrated circuit.

With this I/O table, it is time for an electrician who understands the operation process or is familiar with the ladder diagram of the equipment.

But for those electricians who are not familiar with the operation process and do not know how to read the ladder diagram, they need to draw another table: PLC input and output logic function table. The table actually illustrates the logical correspondence between the input loops (trigger elements, associated components) and output loops (actuators) during most operations.

Practice has proved that if you can skillfully use the input-output correspondence table and the input-output logical function table, you can troubleshoot electrical faults without drawings.

7. Infer faults through program logic

Nowadays, there are many kinds of PLCs often used in the industry, for low-end PLCs, ladder instructions are similar, for high-end machines, such as S7-300, many programs are programmed in language tables.

The practical ladder diagram must have Chinese symbol annotations, otherwise it is difficult to read, if you can roughly understand the equipment process or operation process before looking at the ladder diagram, it seems easier.

If the electrical fault analysis is carried out, the reverse check method or the reverse deduction method is generally applied, that is, according to the input and output corresponding tables, the output relay of the corresponding PLC is found from the fault point, and the logical relationship that satisfies its action is started to be reversed.

Experience shows that when a problem is found, the fault can basically be eliminated, because there are not many points of failure of the equipment with two or more failures at the same time.

  8

PLC fault judgment

Image

Generally speaking, PLC is an extremely reliable equipment, the failure rate is very low, the probability of hardware damage or software operation error such as PLC and CPU is almost zero, the PLC input point is almost not damaged if it is not caused by strong current intrusion, the normally open point of the PLC output relay, if it is not a short circuit of the peripheral load or the design is unreasonable, the load current exceeds the rated range, and the life of the contact is also very long.

Therefore, when we find electrical fault points, we should focus on the peripheral electrical components of the PLC, and do not always suspect that there is a problem with the PLC hardware or program, which is very important for quickly repairing the faulty equipment and resuming production quickly.

Therefore, the focus of the electrical troubleshooting of the PLC control loop that the author talks about is not on the PLC itself, but on the peripheral electrical components in the PLC control loop.

9. Make full and reasonable use of software and hardware resources

(1) Instructions that do not participate in the control cycle or have been put into the cycle before the cycle can not be connected to the PLC;

(2) When multiple instructions control a task, they can be connected in parallel outside the PLC and then connected to an input point;

(3) Try to make use of the internal functional soft components of the PLC, fully call the intermediate state, so that the program has complete coherence and is easy to develop. At the same time, it also reduces hardware investment and costs;

(4) If conditions permit, it is best to independently each output, which is convenient for control and inspection, and also protects other output circuits; When one output point fails, it only causes the corresponding output loop to get out of control;

(5) If the output is a load controlled by forward/reverse control, it is not only necessary to interlock from the internal program of the PLC, but also to take measures outside the PLC to prevent the load from moving in both directions;

(6) The PLC emergency stop should be cut off with an external switch to ensure safety.

10. Other precautions

(1) Do not connect the AC power cord to the input terminal, so as not to burn the PLC;

(2) The grounding terminal should be grounded independently, not connected in series with the grounding terminal of other equipment, and the cross-sectional area of the grounding wire should not be less than 2mm²;

(3) The auxiliary power supply is small and can only drive equipment with small power (photoelectric sensors, etc.);

(4) Some PLCs have a certain number of occupancy points (i.e., empty address terminals), do not connect the wires;

(5) When there is no protection in the PLC output circuit, fuses and other protection devices should be used in series in the external circuit to prevent damage caused by short circuit of the load.
Hollysys PLC - the top ten comprehensive failure causes of PLC

More on that
Hollysys assisted the successful construction and operation of the largest natural gas deep processing base in Xinjiang Hollysys assisted the successful construction and operation of the largest natural gas deep processing base in Xinjiang

On August 16, 2021, the Tarim Oilfield Natural Gas Ethane Recovery Project, the largest natural gas deep processing base in Xinjiang (1), a key project of PetroChina, was successfully completed and put into operation, with stable operation and the production of qualified ethane products. Tarim Oilfield Natural Gas Ethane Recovery Project ...

Hollysys DCS - DCS daily maintenance and fault analysis and troubleshooting methods Hollysys DCS - DCS daily maintenance and fault analysis and troubleshooting methods

01. Power supply The DCS power supply system is mostly a "dual backup hot redundant power supply", and the prevention and control of power failures is mainly reflected in the inspection and daily maintenance. Generally speaking, as long as the unit is normal ...

Hollysys DCS - How to deal with DCS system failure? Hollysys DCS - How to deal with DCS system failure?

1. View the data on the monitoring screen When the following situations occur, it means that there is a problem with the control system, and the microcomputer maintenance personnel should be notified immediately for maintenance, and the operator should go to the site to deal with it. (1) Frequently changing data does not change for a long time, and several or all data do not ...

Hollys PLC - when the power supply is stable, what will cause the PLC to automatically restart? Hollys PLC - when the power supply is stable, what will cause the PLC to automatically restart?

1. The connection line is loose and the contact is poor When the run indicator of the PLC turns red, the position of the plug changes to green with a manual move, indicating that the plug is loose, and it is best to replace the new connecting wire, and the plug is frequently plugged and unplugged, which will also lead to poor contact. 2. Strong electrical interference (external)

Hollysys HOLLiAS MACS IC helps the localization of large-scale thermal power units Hollysys HOLLiAS MACS IC helps the localization of large-scale thermal power units

At 15:05 on January 12, 2022, Datang Anhui Luoneng Power Generation Co., Ltd. (hereinafter referred to as Datang Luohe) successfully completed the full-load trial operation of Unit 5 after comprehensive upgrading, marking the smooth operation of Unit 5 of Datang Luohe Power Plant after the transformation. Hollysys HOLLiAS MACS IC completely ...

Hollysys will make a blockbuster appearance at the first Shenzhen Nuclear Expo in 2022 Hollysys will make a blockbuster appearance at the first Shenzhen Nuclear Expo in 2022

From November 15th to 17th, the 2022 China Nuclear Energy High-Quality Development Conference and Shenzhen International Nuclear Energy Industry Innovation Expo (hereinafter referred to as the "2022 Shenzhen Nuclear Expo") will be grandly reopened at the Shenzhen World Convention and Exhibition Center.   The theme of this year's Nuclear Expo is "Nuclear Gathering in the Bay Area, Activating the World".

What should be paid attention to when cooperating with Lysys PLC-PLC and inverter? What should be paid attention to when cooperating with Lysys PLC-PLC and inverter?

1. Input of switch command signal The input signal of the inverter includes a switch-type command signal that controls the operating status such as operation/stop, forward/reverse, section speed, and joging. Frequency converters usually make use of relay contacts or components with relay contact switching characteristics (such as crystals).

Bureau Veritas signed a strategic cooperation agreement with Hollysys Group and issued a ball valve functional safety certificate to it Bureau Veritas signed a strategic cooperation agreement with Hollysys Group and issued a ball valve functional safety certificate to it

Recently, the signing ceremony of the strategic cooperation between Bureau Veritas and Hollysys and the functional safety certification ceremony of Hollysys valves were held in the Hangzhou base of Hollysys. Mr. Ye Jiong, General Manager of Bureau Veritas Technology Center, Mr. Zhong Aimin, Director of Product Certification Center, Mr. Yang Yang, Sales Director of Eastern Region, and Mr. Yang Yang, Director of Functional Safety ...

What are the aspects of the configuration package of Hollysys DCS - DCS distributed control system? What are the aspects of the configuration package of Hollysys DCS - DCS distributed control system?

1. Configuration of the control loop The configuration of the control loop is essentially to use the various basic functional modules provided by the system to form a variety of actual control systems. At present, the configuration methods provided by various DCSs are different, and they can be summarized as having a specific computing module connected ...

What are the three layers of the network structure of Hollysys DCS - DCS? What are the three layers of the network structure of Hollysys DCS - DCS?

The bottom layer, the field control layer, that is, the field instrument and signal transmission, is mainly the collection of signals and the transmission of control signals. From field devices to control CPUs. The middle layer, the system management layer, that is, the internal network layer of the DCS system, including the control station, the operation station, the historical server...

Hollysys PLC - the use of PLC serial port communication Hollysys PLC - the use of PLC serial port communication

Serial communication is done using 3 wires: (1) ground, (2) sending, and (3) receiving. Since serial communication is asynchronous, ports are capable of sending data on one wire and receiving data on the other. Other threads are used for handshakes, but are not required. Serial communication is the heaviest ...

Hollysys PLC - the characteristics of the working process of PLC Hollysys PLC - the characteristics of the working process of PLC

(1) The PLC adopts the working mode of centralized sampling and centralized output, which reduces the influence of external interference. (2) The working process of PLC is the process of cyclic scanning, and the length of cyclic scanning time depends on the speed of instruction execution, the length of the user program and other factors. (3) Output ...

Hollysys plc - the difference between DCS and PLC Hollysys plc - the difference between DCS and PLC

1. DCS is a "distributed control system", while PLC (programmable controller) is just a control "device", which is the difference between the two. The system can realize the function and coordination of any equipment, and the PLC equipment only realizes the function of this unit. 2. In terms of networking, the DCS network is ...

Hollysys DCS - Introduction to the hardware architecture of DCS distributed control system Hollysys DCS - Introduction to the hardware architecture of DCS distributed control system

DCS usually adopts a hierarchical and progressive structure, each level is composed of several subsystems, and each subsystem achieves a number of specific finite goals, forming a pyramid structure. Examining the hierarchical structure of DCS, DCS level and control management level are the two most basic links that make up DCS. Process control...

Hollysys signed a contract with Lysys for the integrated management platform project of smart tunnel of Linzhou-Changzhi Expressway in Henan Hollysys signed a contract with Lysys for the integrated management platform project of smart tunnel of Linzhou-Changzhi Expressway in Henan

Recently, Hollysys signed a contract for the comprehensive management platform project of smart tunnel of Linzhou-Changzhi Expressway in Henan Province. Linzhou to Changzhi Expressway is a traffic artery that crosses the Grand Canyon of Taihang Mountain, through Henan and Shanxi, with a total of 7 pairs (14) tunnels.

Hollysys PLC - PLC is classified by function Hollysys PLC - PLC is classified by function

According to the different functions of PLC, PLC can be divided into three categories: low-grade, mid-range and high-end. (1) Low-grade PLC Low-grade PLC has basic functions such as logic operation, timing, counting, shifting, self-diagnosis, monitoring, etc., and can also have a small amount of analog input/output, arithmetic operation, math...

Hollysys' 100% domestic PLC has achieved breakthrough applications in the field of nuclear power Hollysys' 100% domestic PLC has achieved breakthrough applications in the field of nuclear power

Hollysys, as the PC general contractor, participated in the construction of the first smart water project in the domestic nuclear power industry (1) - Qin's No. 2 Plant Chengjing Water Intake Smart Operation and Transformation Project, which was recently completed and put into operation. The project is independently implemented by Hollysys, and Hollysys is independently controllable, safe and reliable, and deeply developed by the nuclear high-tech project.

Hollysys released a new DCS control system Hollysys released a new DCS control system

Hollysys' safe and trustworthy DCS control system uses the controller K-CU11 for the K series large-capacity trusted controller module, which adopts advanced PowerPC architecture high-performance main processor and security components based on national cryptography algorithm, and has the security functions of static trusted start and dynamic trusted measurement. ...

Hollysys PLC - What are the selection methods of PLC? Hollysys PLC - What are the selection methods of PLC?

1. Budget for input and output (I/O) points When budgeting I/O points, the appropriate margin should be considered, usually based on the calculated number of input and output points, and then add 10%-20% of the expandable, and after the margin, it will be used as the budget data of input and output points. When ordering in practice, it is also necessary to rely on the manufacturer's ...

Century Qualcomm and Hollysys reached a strategic cooperation Century Qualcomm and Hollysys reached a strategic cooperation

With the inclusion of "exploring the construction of digital twin cities" in the 14th Five-Year Plan, the field of intelligent transportation is being endowed with more new business value. Recently, Century Qualcomm and Hollysys reached a strategic cooperation, based on the principle of "giving full play to advantages, mutual promotion, long-term cooperation, mutual benefit and win-win", ...

CATEGORIES BYPASS
Customer Service Center

Online Consultation:QQ


ContactContact

Contact: Manager Huang

Contact QQ: 3271883383

Contact number: 13522565663


Scan the code to add WeChat (please save the picture first on the mobile phone)

working hoursworking hours

Weekdays: 9:00-17:00

Holidays: Only emergencies are handled

Contact us

Contact us

Contact number QQ consultation
QQ consultation

3271883383

Company address
Back to top