1. Rich networking and interface functions, easy to deploy
It supports 5G/4G/3G/WIFI/Ethernet, WAN/optical fiber and other network access modes, network port/serial port/IO port/CAN port and other equipment access, and supports LoRa wireless transmission, disconnection reconnection and multi-network mutual backup function.
2. Rich protocol analysis, intelligent collection and control
Built-in protocol analyzer, supporting mainstream industrial control protocols and customized unique protocols (such as PLC protocol, instrumentation protocol, power protocol, industrial robots, machine tools, etc.); The embedded patented algorithm of Tongbolian can efficiently and stably collect and control various industrial equipment data.
3. Data standardization and MQTT protocol access
The standardization of data is realized through the IoT model, and the data can be standardized into JSON data format only by entering variable points, and the docking with the cloud platform is realized through the standard protocol of the Internet of Things. Eliminate the differences between automation and informatization, and the differences in equipment, provide standardized data API interfaces, and develop Industry 4.0 systems conveniently, efficiently and conveniently.
|
More on that
|
Hollysys debuted at the XCon2022 Security Focus Information Security Technology Summit
On September 19, 2022, the XCon2022 Security Focus Information Security Technology Summit was successfully held in Beijing. More than 10 technical experts, heads of security departments, and front-line security experts from well-known domestic network security enterprises shared in-depth topics at the meeting.
|
|
Hollysys PLC – PLC programming advice
(1) When the PLC and the host computer (or touch screen) form a monitoring system, there are many times when there are "manual", "automatic" and other control modes on the screen (generally when there is only one multiple). You can use the "MOV" command in the program. For example, when "manual" is selected, the constant 1 MO ...
|
|
Hollysys PLC - Electrical troubleshooting of PLC control loop
In general, PLCs are extremely reliable devices with a very low failure rate. The probability of hardware damage such as the CPU of the PLC or software running errors is almost zero; If the PLC input point is not caused by strong current intrusion, it will hardly be damaged; The normally open point of the PLC output relay, if it is not a short circuit of the peripheral load ...
|
|
Hollysys PLC - the six application functions of PLC
1. It is used for switching control
The ability of PLC to manipulate switching quantities is very strong. The number of points in and out of the control, less than a dozen points, dozens of points, more can be hundreds, thousands, or even tens of thousands of points, because it can be networked, the number of points is almost unlimited, no matter how many points can be controlled, the control ...
|
|
Hollysys PLC - What are the three large quantities in PLC?
1. The switching quantity is also called the logical quantity, which means that there are only two values, 0 or 1, ON or OFF. It is the most commonly used control, and controlling it is the advantage of PLC, and it is also the most basic application of PLC.
The purpose of switching control is to follow the current input combination with the historical input according to the switching quantity.
|
|
and Lisi PLC - the difference between PLC and inverter
1. The role is different
A PLC (Programmable Logic Controller) is an electronic system designed for digital operations in an industrial environment.
The inverter is the application of frequency conversion technology and microelectronics technology to control the AC motor by changing the frequency of the motor working power supply.
|
|
Hollysys PLC - the importance of PLC industrial gateway
1. Realize remote control of industrial field equipment;
2. The PLC industrial gateway realizes remote upgrade of equipment firmware, downloads the program, and can flexibly access various equipment management platforms;
3. Realize remote control of industrial site touch screen and remote mapping of configuration screens;
4. PLC industry ...
|
|
Hollysys automation solutions
Hollysys Automation provides automation solutions for many fields.
Intelligent TCM solutions
In order to make the drug achieve the harmony and unity of the doctor's peace of mind, the pharmacist's formula, and the patient's peace of mind, higher requirements are put forward for the pharmacy environment and hospital management. But...
|
|
Troubleshooting steps of Hollysys DCS system
The steps of DCS system troubleshooting include:
(1) Check the fault caused by improper use.
Common types of operational faults include operator errors, terminal wiring faults, module installation faults, and power supply failures.
(2) Troubleshoot the improper operation of the DCS system ...
|
|
Hollysys DCS - DCS fault maintenance measures
Whether it is a new unit or an upgraded DCS, the equipment of the system and controller should focus on the reliability and load factor (including redundancy) objectives. The load rate planning of the communication bus must be controlled within a reasonable range, and the load rate of the controller should be balanced as much as possible.
|
|
Steps on how Hollysys DCS works on a computer
1. Confirm that the new computer has relevant interfaces and can be used normally, and Hollysys DCS software can run on the computer operating system
2. Device and Lisi DCS software, dongle, and related drivers (mainly redundant network cards, data hard disks, etc.)
3. Set up ...
|
|
Hollysys released a new DCS control system
Hollysys' safe and trustworthy DCS control system uses the controller K-CU11 for the K series large-capacity trusted controller module, which adopts advanced PowerPC architecture high-performance main processor and security components based on national cryptography algorithm, and has the security functions of static trusted start and dynamic trusted measurement. ...
|
|
Hollysys PLC - Precautions in the operation of PLC (1)
First, the working environment
(1) Temperature
The PLC requires that the ambient temperature is 0-55oC, and it cannot be placed under the components with large heat generation during installation, and the surrounding ventilation and heat dissipation space should be large enough.
(2) Humidity
In order to ensure the insulation performance of PLC, the relative humidity of the air ...
|
|
Hollysys PLC - Six Fault Types of PLC and Troubleshooting Methods (4-6)
Fourth, the fundamental sequence of repairing PLC.
1. Start first.
1) When repairing the PLC, do not start directly immediately, but first ask about the situation and the phenomenon of the problem before and after the problem;
2) If you repair an unfamiliar PLC, you should first understand its operating principle.
...
|
|
and Lisi DCS - the difference between DCS control and PLC control
1. PLC programmable logic controller (programmable controller).
2. DCS system pays more attention to the field of process control. Such as chemical, smelting, pharmaceutical, etc. It mainly monitors and controls some field parameters, while PLC focuses on logic control. machining). Of course, the PLC's ...
|
|
Hollysys PLC - the top ten comprehensive failure causes of PLC
1. Grounding problems
The grounding requirements of the PLC system are relatively strict, and it is best to have an independent dedicated grounding system, and it should also be noted that other equipment related to PLC should also be reliably grounded.
When multiple circuit grounding points are connected together, unexpected currents can be generated, resulting in logic errors or ...
|
|
Hollysys DCS - Introduction to DCS grounding classification
In general, DCS control systems require two types of grounding: protective ground and working ground (logical, shielded, etc.). For systems equipped with safety barrier explosion protection measures, such as those used in the chemical industry, intrinsically safe premises are also required.
2.1 Protected areas (CG, Cabinet Grounding...)
|
|
Hollysys PLC - maintenance steps of PLC control cabinet
1. Data backup
When carrying out maintenance, we must cut off the power, data backup between power outages is an important link, for the data that needs to be archived for a long time, you can back up the historical trend data to the mobile hard disk, and then turn off the Windows-based operating system (Note...
|
|
Hollysys DCS - What are the specific contents of the major and minor repair projects of the DCS system?
(1) Overhaul projects
DCS system overhaul is carried out in the random group of main equipment overhaul, and the overhaul project includes the following:
1) Conduct a comprehensive inspection of the control equipment and make a record.
2) Copy the configuration of all modules, and verify the marks and addresses of the modules.
3) Qing ...
|
|
Hollysys DCS - What are the four contents of DCS spare parts management?
DCS spare parts In the process of using the DCS control system, its management is more important. The requirements of general DCS spare parts management are summarized in four aspects: storage, inspection, preparation for use, and use.
1. Storage
DCS system, spare module storage should meet the requirements ...
|
|