Sunland SB200 37KW inverter does not show analysis

Create Date: 2024-8-30 12:03:23|Source: Hope Sunland

After inspection, the circuit board of the machine is composed of a fan switching power supply board, a control board with a switching power supply and a driving board, etc., the fan power supply and the control board working power supply are independent of each other, the fan power supply output is normal, and the control board working power supply has no output due to failure.

                               Sunland SB200 37KW inverter does not show analysis

1. Remove the control board, input the DC voltage separately, and find that the switching power supply can work normally and the voltage output is normal, which indicates that there is a short circuit in the load.

2. Check the driver board, and find that there is a driving power supply capacitor and transistor that have been short-circuited, causing the switching power supply to vibrate intermittently.

3. Replace the damaged components, check that the switching power supply of the control board is now working, the output voltage is normal, and the panel is visible.

4. Check that the drive output signal is normal.

Install the whole machine, do a good job of safety measures, power on the test machine, the inverter appears normal, the output three-phase balance, the load is normal, and the inverter is corrected.

More on that
Fault signal processing method of frequency converter Fault signal processing method of frequency converter

(1) Check whether the motor is hot. If the temperature rise of the motor is not high, you should first check whether the size of the load, the acceleration and deceleration time, and the running cycle time are reasonable, and correct the V/F characteristics, and check whether the electronic thermal protection function of the inverter is preset reasonably, such as the inverter.

Senlan SV1000 servo drive check before power-on Senlan SV1000 servo drive check before power-on

1) Oil circuit inspection: Open the safety valve to check whether there is any leakage in the oil circuit. 2) Line check: whether the R, S, T, PE on the input side of the driver, U, V, W, PE lines on the output side and the control line are corresponding. 3) Check whether the power supply voltage of the incoming terminal of the servo drive is normal ...

Repair and maintenance of Sunland inverter Repair and maintenance of Sunland inverter

The input and output currents of the inverter contain many higher harmonic components. In addition to the lower harmonics that can constitute the reactive power loss of the power supply, there are many harmonic components with high frequencies. They will transmit their own energy in various ways, forming a positive impact on the inverter itself and other equipment.

At the physical level, the stable operation of the inverter is guaranteed-Senlan inverter At the physical level, the stable operation of the inverter is guaranteed-Senlan inverter

For the most popular electrical control equipment inverter (Variable-frequency Drive, VFD), as a precision electronic industrial control equipment, in order to run smoothly for a long time, we, as professional and technical personnel, need to be on the VFD device or before the operation.

Inverter control motor speed method - Senlan Inverter control motor speed method - Senlan

1. Why can the rotation speed of the motor be changed freely? The unit of motor rotation speed: r/min the number of rotations per minute, can also be expressed as rpm. Example: 2-pole motor 50Hz3000 [r/min] 4-pole motor 50Hz1500[r/min] Conclusion: The rotation of the motor ...

How to carry out frequency conversion of frequency converter - Senlan How to carry out frequency conversion of frequency converter - Senlan

(1) Rectifier. As one of the most important components of the inverter, the rectifier can convert the AC power into direct current. Its working method is more common to that of a battery charger or arc welder. It uses a diode bridge to limit the communication sine wave to only one direction.

Inverter with no-load operation and debugging - Hope Sunland Inverter with no-load operation and debugging - Hope Sunland

The following four steps are very important for the commissioning of the inverter with the machine (i.e., connected to the motor) and no-load (i.e., the motor without load). (1) Set the power of the motor, the number of pole pairs, and check the operating current of the inverter. ( ...

PLC and inverter connection control method - Senlan inverter PLC and inverter connection control method - Senlan inverter

There are three connection control methods between PLC and inverter: 1. Use the analog output module of PLC to control the analog output module of the inverter The analog output module of the PLC outputs 0-5V voltage signal or 4-20mA current signal, which is used as the analog of the inverter.

Sunland inverter does not show fault repair Sunland inverter does not show fault repair

After inspection, the circuit board of the machine is composed of a fan switching power supply board, a control board with a switching power supply and a driving board, etc., the fan power supply and the control board operation power supply are independent of each other, the fan power supply output is normal, and the control board operation power supply is not output due to the problem. ...

Inverter selection according to capacity matching - Senlan Inverter selection according to capacity matching - Senlan

We need to ensure that the capacity of the inverter is matched. First of all, according to the nature of the load, the correct type of inverter is selected. The general principle is what nature of the load characteristics with what characteristics of the inverter. (1) Constant torque production equipment - in the speed regulation range ...

Frequency conversion speed regulation of several special motors - Senlan frequency converter Frequency conversion speed regulation of several special motors - Senlan frequency converter

A. Wound rotor asynchronous motor The rotor winding of the wound rotor asynchronous motor is a set of three-phase windings with star connection. The end points of the three-phase winding are connected to the three collector rings, which are connected to the brushes and the external resistor (for starting or speed regulation) through the collector rings. Select inverter ...

The output side of the inverter is equipped with a contactor - Sunland inverter The output side of the inverter is equipped with a contactor - Sunland inverter

When the power supply and the inverter are replaced, for example, if the inverter has a problem, in order to make an emergency, let the motor be directly changed to be driven by the power frequency power supply; Perhaps the inverter is used for soft starting, and after the motor is accelerated to the power frequency speed, it is changed to be driven by the power frequency power supply. ...

Hope Sunland inverter fault code Hope Sunland inverter fault code

Er.ocb (1) Overcurrent at the moment of starting: There is a short circuit inside the motor There is a short circuit in the motor wiring The starting voltage is too high Check the motor and wiring Check the motor wiring Seek service Check the torque boost settings ...

Anti-interference measures in the application of Sunland inverter Anti-interference measures in the application of Sunland inverter

The main manifestations of the disturbance of the inverter in the application are: higher harmonics, noise and oscillation, load matching, heat generation and other problems. These disturbances are unavoidable, because the input part of the inverter is a rectifier circuit and the output part is an inverter circuit, both of which are made up of nonlinear components that play a switching effect.

Whether the front end of the inverter can be installed with a motor protector - Senlan Whether the front end of the inverter can be installed with a motor protector - Senlan

Frequency conversion speed regulation motor is generally selected 4-level motor, the fundamental frequency operation point is planned at 50Hz, the frequency 0-50Hz (speed 0-1480r/min) scale of the motor for constant torque work, the frequency of 50-100Hz (speed 1480-2800r/min) scale of the motor for constant power work, the whole speed regulation scale of (0 ...

The difference between "braking" and "parking" of the inverter - Senlan The difference between "braking" and "parking" of the inverter - Senlan

There are two ways to park a drive. One way is called "free parking". It is to quickly "power off" the motor, so that the motor can slide and park by its own inertia force (OFF2 parking); The other way is called "braking parking". So this "brake parking ...

Senlan inverter motor failure analysis Senlan inverter motor failure analysis

1. The motor slows down too slowly 1) If the deceleration time is set too long, reduce the deceleration time 2) Install a braking resistor 3) Add DC braking 2. The motor is overheated 1) The load is too large, and the practical moment has exceeded the ...

Can the lower end of the leakage switch be connected to the inverter - Senlan Can the lower end of the leakage switch be connected to the inverter - Senlan

To be able to connect, you must use larger special specifications, the inverter outputs higher harmonics, and the leakage current is larger than that of conventional leakage switches, which simply trip, and requires the use of large-scale or special types of leakage switches. Many VFD manuals have instructions on the installation and selection of leakage switches.

Inverter with no-load operation debugging steps - Sunland inverter Inverter with no-load operation debugging steps - Sunland inverter

The following four steps are very important for the commissioning of the inverter with the machine (i.e., connected to the motor) and no-load (i.e., the motor without load). (1) Set the power of the motor, the number of pole pairs, and determine the working current of the inverter. ( ...

Inverter device inspection and maintenance work steps Inverter device inspection and maintenance work steps

1. Preparation process: Abort the device and admit that the motor is completely aborted. Press the stop button on the operator panel to stop the operation. Disconnect the external mains power supply (low-voltage cabinet drawer). Adequate security treatment should be carried out to ensure that it is indeed disconnected and that it does not ...

CATEGORIES BYPASS
Customer Service Center

Online Consultation:QQ


ContactContact

Contact: Manager Huang

Contact QQ: 3271883383

Contact number: 13522565663


Scan the code to add WeChat (please save the picture first on the mobile phone)

working hoursworking hours

Weekdays: 9:00-17:00

Holidays: Only emergencies are handled

Contact us

Contact us

Contact number QQ consultation
QQ consultation

3271883383

Company address
Back to top