First, press the "Cancel Recovery Button" 4 times in a row;
Then adjust the clock (the factory has been adjusted), if you need to adjust it again, press and hold the "clock key" together, and then press the "school week, time key, school minute key" to adjust the Beijing time.
5.2 Set the first opening time: press the "punctual" button to display the LCD display screen, and then press the "calibration key, calibration key" to enter the first opening time.
5.3 Set the first closed time: press the "punctual" button, enter the first open time when the LCD display screen presents the situation, and then press the "calibration key, calibration key" to enter the first closed time.
5.4 Continue to press the "punctual" button, the lower left of the LCD screen will display "2 on, 2 off, 3 on, 3 off、......、 10 on, 10 off", refer to the step 2, 3 set the future switch time, if only once a day, you must press the "cancel/restore" key, the "2 on, 2 off, 3 on, 3 off、......、10 on, 10 off" storage time elimination, so that the LCD screen shows the pattern of "-:-" (not 00:00).
5.5. After the punctuality setting is completed, the "Clock" button should be pressed so that the Beijing time is displayed on the LCD screen. If it is inconsistent, please press the "Calibration Time, Calibration, and Calibration Week" button to adjust or reset;
5.6 When the power supply is connected, the green light on the panel indicates that the circuit is electrified, and the traffic light is on together, indicating that the switch is turned on.
5.7. Press the "Active/Manual" button to directly control the circuit on or off. When you want to make the switch active, you should first press the "Active/Manual" button, adjust the "▼" symbol at the bottom of the display screen to the "off" position, and then press this key to adjust to the "active" position. For example, the controller is actively opened at 18:30 every night, according to the above 2nd setting, actively closed at 23:20 every day, according to the above 3rd setting, according to the 4th point of debugging, so that the LCD screen "2 on, 2 off, 3 on, 3 off、......、 10 on, 10 off" appears as the "-:-" pattern, and then press the 6th and 7th points to operate.
5.8 Press the "punctual" button, and then press (week) to set the same every day, different every day, the same from Monday to Friday, and the same from Saturday to Sunday
|
More on that
|
Delixi universal circuit breaker CDW9 series maintenance operation
Delixi intelligent all-round circuit breaker CDW9 series, should be checked regularly every year, first open and close and long-distance equipment, successively use a variety of additives, test operation program column, control unit test using a small test suite; Every two years or when the control unit repair target reaches 100, it should be ...
|
|
How to adjust the output voltage of Delixi voltage regulator
1. How to disassemble the voltage regulator
Generally, there are screws on the shell of the voltage regulator, please disconnect the power supply first, and then remove all the screws on both sides to take off the shell.
After the regulator shell is disassembled, the circuit, copper coil, carbon brush, etc. inside will be revealed.
|
|
Technical parameters of surge protective device - Delixi
Look at the quality of the surge protector, to see whether it can complete the fundamental specification for him, the primary specification related to the surge protector is whether the surge operating voltage can be limited to the required value below, the surge protector in the completion of this mission when it is necessary to discharge the lightning current, this specification is necessary to completely ...
|
|
Delixi inverter installation and wiring
1. The device of the inverter
1.1 The device environment requirements of the inverter
Ambient temperature - 10 °C - 40 °C;
Ambient humidity: The relative humidity does not exceed 90% (no condensation);
Other occasions requiring no direct sunlight, no corrosive gas and flammable gas, less dust, ...
|
|
The reason for the instability of the voltage regulator output - Delixi
It shows that the voltage regulator base is not voltage corrected, and the voltage regulator in this situation is like a transformer, the higher the input voltage, the higher the output voltage, the input decreases and the output voltage also decreases.
This...
|
|
Delixi frequency converter E series precautions
1. Before the inverter device is in place and debugged, please tighten the components, especially the connecting bolts of the wire part, if not tightened, the connection will be heated and cause fire.
2. The on-site planning of the installation should be reasonable, and the excellent ventilation environment should be maintained.
3. The incoming and outgoing power lines of the inverter are not ...
|
|
The inverter is changed to a servo to consider the key points
There are substantial differences between servos and inverters in terms of application intention and function. Which one to choose depends on factors such as operating mode, load conditions, price, etc. Basically, the performance of the servo is superior to that of the inverter. Therefore, when changing from an inverter to a servo, there are generally no operational problems ...
|
|
Advantages of Delixi parameter voltage regulator
1. Its overall induction skills are the best, its design does not use electronic devices, and the environmental adaptability and stability are the highest. When the capacity of most power grids is sufficient, the voltage is relatively stable, but with the improvement of electrification and informatization, the pollution of some power grids, ...
|
|
Delixi EM60 series inverter to factory settings
First, the process of inverter rehabilitation factory value
1. Study the manual and find the corresponding function number, or key combination.
2. Confirm that the parameters can be corrected (sometimes the inverter will set the parameter to write the protection function in order to prevent the parameters from being changed randomly, and the password must be guaranteed to enter the correction) ...
|
|
An integral part of the electrical control system - Delixi
The electrical control system is generally called the secondary control loop of electrical equipment, different equipment has different control loops, and the control methods of high-voltage electrical equipment and low-voltage electrical equipment are also different. Specifically, an electrical control system refers to a combination of several electrical components that are used to complete the operation of a certain ...
|
|
The advantages of Delixi inverter
1. Good stability: Delixi inverter has high-quality internal planning, the speed can be gradually increased, and then the motor is not impacted, which improves the stability of the inverter.
2. Excellent control function: Delixi inverter adopts the best skills, has a super control function, can ensure the electric ...
|
|
The principle and operation method of Delixi inverter operation
The principle and operation method of Delixi inverter:
1. No-load energizing test of inverter
1. Ground the grounding terminal of the inverter.
2. Pass the power input terminal of the inverter through the leakage maintenance switch.
|
|
Analysis of common problems of inverter - Delixi
1. Why does the maintenance function of the inverter operate when the clutch is connected to the load?
When the load is connected with a clutch, at the moment of connection, the motor changes sharply from the no-load condition to the area with a large slip rate, and the large current flowing through causes the inverter to trip over the current and cannot work.
...
|
|
Precautions for the use of Delixi stabilized power supply
1. The use environment of regulated power supply requires good ventilation, no moisture, no corrosive gas, explosive substances, conductive dust Egypt steam, etc., and it is required to be installed in places without intense oscillation.
2. The voltage regulator is used according to the function of the electrical equipment.
|
|
Delixi parameter voltage regulator performance and advantages
1. Its overall inductive skills function is the best, its design does not use electronic equipment, and the environmental adaptability and stability and reliability function are the highest. When the capacity of most power grids is sufficient, the voltage is relatively stable, but with the improvement of electrification and informatization, the pollution of some power grids, ...
|
|
Delixi air switch is connected to the reverse hazard
If the zero line of Delixi's air switch is reversed to the front, there is not much obstacle to the 2P circuit breaker and 2P leakage circuit breaker. The only effect is that it looks irregular, and you need to find the zero line from scratch when repairing, which brings a little inconvenience.
...
|
|
The role of Delixi inverter on the motor
1. Frequency conversion speed regulation and energy saving. The inverter frequency conversion speed regulation and energy saving are mainly manifested in the application of fans and pumps. In order to ensure reliability in actual production, all kinds of production machinery are designed with power drives, and there is a certain margin. After turning down the motor rotation when there is no need to run at full speed in production, ...
|
|
Delixi participated in the 4th China Electrical Appliance Culture Festival
On January 27, the "4th China Electrical Appliance Culture Festival and World Electrical Products Expo" was grandly opened in Liushi, Wenzhou, the capital of China's electrical appliances. More than 500 companies from home and abroad showed their faces on more than 1,400 booths. The largest Delixi exhibition hall with a booth area of more than 1,800 square meters ...
|
|
Inverter application skills - Delixi
1. Shielded wires should be used for signal lines and control lines, which is beneficial to avoid disturbance. When the line is long, for example the distance jumps 100m, the conductor cross-section should be enlarged. The signal line and the control line should not be placed in the same cable trench or tray with the power line, so as not to disturb each other, it is best to place it through the pipe, ...
|
|
Regularly inspect the inverter steps and methods - Delixi
When the VFD is viewed regularly, the power supply should be blocked, the operation of the VFD should be stopped, and the cover of the VFD should be removed. The first thing is to check the places that cannot be seen without downtime, or the places where it is difficult to find problems on a daily basis, as well as the inspection and adjustment of electrical characteristics.
After blocking the VFD power supply, the main power ...
|
|