1. The output accuracy is as high as 0.05%, which greatly improves the operation efficiency of the system.
2. The full-scale output of the channel signal is 0-22.7mA, and the output range is wide;
3. It can be adapted to the enhanced base to achieve channel resistance to 220VAC;
4. It has perfect channel signal diagnosis function, which can realize signal break, under-range, over-range, and short-circuit diagnosis functions;
5. The channel signal diagnosis function has a dead zone function, which effectively reduces the phenomenon of misdiagnosis;
6. The module supports full-channel non-disturbance switching, and automatic switching when a single device fails;
7. Support output hold and output safety preset, module communication fault steering safety.
The high-precision DCS system can not only ensure the safe and efficient operation of the industrial control system, but also save raw materials, reduce equipment adjustment actions, improve the quality and purity of the output products, and reduce the production cost of the production line.
|
More on that
|
Hollysys DCS – the steps for DCS to properly power off and power on
DCS is properly blacked out
When the DCS needs to be powered off for maintenance due to overhaul or other reasons, we often directly power off the DCS, but sometimes this non-standard operation will bring serious consequences, such as configuration loss, PID parameter loss, etc. So there is a need for blackouts and re-on...
|
|
Hollysys PLC - What are the applications of PLC in CNC machine tools?
1. The application form of PLC in CNC machine tools
PLC is used in CNC machine tools, and there are usually two forms: one is called built-in: the other is called free-standing. Built-in PLC is also known as integrated PLC, the CNC system in this way, at the beginning of the design of the NC and PLC combined ...
|
|
Hollysys PLC - maintenance steps of PLC control cabinet
1. Data backup
When carrying out maintenance, we must cut off the power, data backup between power outages is an important link, for the data that needs to be archived for a long time, you can back up the historical trend data to the mobile hard disk, and then turn off the Windows-based operating system (Note...
|
|
Hollysys DCS - DCS fault maintenance measures
Whether it is a new unit or an upgraded DCS, the equipment of the system and controller should focus on the reliability and load factor (including redundancy) objectives. The load rate planning of the communication bus must be controlled within a reasonable range, and the load rate of the controller should be balanced as much as possible.
|
|
Hollysys PLC - what are the application fields of PLC
1. Logic control of switching quantity
This is the most basic and most extensive application field of PLC, which replaces the traditional relay circuit to achieve logic control and sequence control, which can be used for the control of a single device, as well as for multi-machine group control and automatic assembly line. Such as injection molding machines, printing machines, ...
|
|
Common fault parts and maintenance of Hollysys PLC
1. Lack of motivation
It may sound simple, but it's good to check the simple stuff first. Thoroughly inspect all power connections and cables for damage that could cause a short circuit. Make sure your power supply is functioning properly. Use a voltmeter to check if the grounding and voltage are correct.
2. Bad ...
|
|
Hollysys DCS - Introduction to the hardware architecture of DCS
Examining the hierarchical structure of DCS, DCS level and control management level are the two most basic links that make up DCS.
The process control stage specifically realizes the decentralized control functions such as signal input, conversion, operation and output. The controls at the process control level vary in different DCS, ...
|
|
HollySys PLC - the usage and principle of PLC programming interrupts
When the PLC understands the interrupt function, it needs to understand the PLC's operating cycle or scan cycle. It is necessary to talk about the process of PLC sequential control loop execution, which is a prerequisite for understanding interruptions and must be mastered. It is divided into three parts, input processing, program processing, and output processing.
1、 ...
|
|
Hollysys successfully signed a contract with Luxi Chemical for a 1.2 million tons/year bisphenol A plant project
Recently, Hollysys successfully signed a contract with Luxi Chemical Group Co., Ltd. (hereinafter referred to as Luxi Chemical) for a 1.2 million tons/year bisphenol A equipment project. The project is a key project in Shandong Province in 2021, which will not only greatly improve the competitiveness of Luxi Chemical polycarbonate in the industry, but also have a significant impact on China's phenol ...
|
|
Hollysys DCS—— Selection, design and debugging of DCS system
1. Configuration of the system and controller
The configuration of systems and controllers focuses on reliability and load factor (including redundancy). The communication load rate must be controlled within a reasonable range, and the load rate of the controller must be balanced as much as possible to avoid the occurrence of "high load" problems.
2 ...
|
|
Hollysys PLC - the basic structure of PLC controller is introduced
PLC is essentially a kind of computer dedicated to industrial control, and its hardware structure is basically the same as that of a microcomputer, and its basic composition is as follows:
1. Power supply
The power supply of the PLC plays a very important role in the whole system. If you don't have a good, reliable power system that is ...
|
|
Hollysys will make a blockbuster appearance at the first Shenzhen Nuclear Expo in 2022
From November 15th to 17th, the 2022 China Nuclear Energy High-Quality Development Conference and Shenzhen International Nuclear Energy Industry Innovation Expo (hereinafter referred to as the "2022 Shenzhen Nuclear Expo") will be grandly reopened at the Shenzhen World Convention and Exhibition Center.
The theme of this year's Nuclear Expo is "Nuclear Gathering in the Bay Area, Activating the World".
|
|
Hollysys PLC - the use of PLC serial port communication
Serial communication is done using 3 wires: (1) ground, (2) sending, and (3) receiving. Since serial communication is asynchronous, ports are capable of sending data on one wire and receiving data on the other. Other threads are used for handshakes, but are not required.
Serial communication is the heaviest ...
|
|
Bureau Veritas signed a strategic cooperation agreement with Hollysys Group and issued a ball valve functional safety certificate to it
Recently, the signing ceremony of the strategic cooperation between Bureau Veritas and Hollysys and the functional safety certification ceremony of Hollysys valves were held in the Hangzhou base of Hollysys. Mr. Ye Jiong, General Manager of Bureau Veritas Technology Center, Mr. Zhong Aimin, Director of Product Certification Center, Mr. Yang Yang, Sales Director of Eastern Region, and Mr. Yang Yang, Director of Functional Safety ...
|
|
Hollysys DCS——What should I pay attention to when cleaning the DCS system?
1. Power off
2. Cleaning the ash can not only clean the surface, but also clean the internal card key of the controller
3. If there is a supporting UPS, open the UPS and clean the ashes
4. After cleaning the ash, check whether the card and relay are loose, and tighten them if they are loose
5. The relays with frequent actions should be cleaned regularly.
|
|
Hollysys signed a contract with Lysys for the integrated management platform project of smart tunnel of Linzhou-Changzhi Expressway in Henan
Recently, Hollysys signed a contract for the comprehensive management platform project of smart tunnel of Linzhou-Changzhi Expressway in Henan Province. Linzhou to Changzhi Expressway is a traffic artery that crosses the Grand Canyon of Taihang Mountain, through Henan and Shanxi, with a total of 7 pairs (14) tunnels.
|
|
Hollysys HOLLiAS MACS IC helps the localization of large-scale thermal power units
At 15:05 on January 12, 2022, Datang Anhui Luoneng Power Generation Co., Ltd. (hereinafter referred to as Datang Luohe) successfully completed the full-load trial operation of Unit 5 after comprehensive upgrading, marking the smooth operation of Unit 5 of Datang Luohe Power Plant after the transformation. Hollysys HOLLiAS MACS IC completely ...
|
|
Hollysys helped China's first 20,000-ton green electricity to green hydrogen demonstration project be fully put into operation
On August 30, Sinopec announced that China's largest photovoltaic power generation direct production green hydrogen project, Xinjiang Kuqa Green Hydrogen Demonstration Project (hereinafter referred to as the Green Hydrogen Demonstration Project), was fully completed and put into operation, marking a breakthrough in the large-scale industrial application of green hydrogen in China. In this project, and ...
|
|
Hollysys PLC - Introduction to the classification of PLC according to the structure and form
According to the structural form of PLC, PLC can be divided into two categories: integral type and modular type.
(1) Integral PLC
The integral PLC is a centralized power, CPU, I/O interface and other components in a chassis, which has the characteristics of compact structure, small size and low price. Small PLC ...
|
|
and Nesbitt DCS - the difference between SCADA and DCS and PLC
To put it simply, DCS is mainly used for process automation, PLC is mainly used for factory automation (production lines), and SCADA is mainly for wide-area needs, such as oil fields and pipelines that stretch for thousands of miles. If from the point of view of computers and networks, they are unified, and the reason for the difference is mainly in ...
|
|