1. Data backup

For the data that needs to be archived for a long time, you can back up the historical trend data to the mobile hard disk, and then turn off the Windows-based operating system (pay attention to saving) and record the internal parameters of the controller.

2. Turn off the power

After the data backup is completed, the operation of pulling the brake should be performed to close the protection switch of each subordinate controller first, and the order is reversed when the main switch is disconnected and powered on. It is best to add a safety lock to prevent someone from accidentally sending power and causing an accident.

3. Appearance and environmental inspection

Check whether the temperature and humidity of the surrounding environment are reasonable, whether there is a large amount of dust on the components, test the insulation of the system, and use the shake meter to test the insulation of the equipment.

4. Control cabinet cleaning

Before cleaning, it is best to cover the electronic components with heat dissipation holes such as PLC and inverter to prevent dust from entering and affecting the work of components. Only use a vacuum cleaner, not compressed air, which will blow dust and water vapor into the components, causing a short circuit.

5. Check whether each line is loose

Be sure to check the looseness of the line, once the line is loose, the controller will not work normally because of the poor contact, and it is very easy to burn out the line.

6. Component inspection

Check whether each component is working normally, and replace it in time if damaged.
Megmeet PLC – the maintenance steps of the PLC control cabinet


More on that
Analysis of the fault code of Megmeet welder Analysis of the fault code of Megmeet welder

1. E1: indicates sensor failure. In this case, it is necessary to check whether the sensors of Megmeet are damaged or whether the wiring is loose. 2. E2: Indicates overweight load. At this point, it is necessary to check whether the load of Megmeet exceeds the set maximum load. 3. E3: Indicates battery ...

Megmeet welding machine - introduction to the advantages and disadvantages of carbon dioxide gas shielded welding Megmeet welding machine - introduction to the advantages and disadvantages of carbon dioxide gas shielded welding

Carbon dioxide gas shielded welding (referred to as CO2 welding) is the use of CO2 gas as the maintenance medium, during welding, CO2 gas is sprayed out through the nozzle of the welding gun, along the perimeter of the welding wire, forming a gas maintenance layer around the arc, mechanically isolating the welding arc and the molten pool from the air, and then avoiding ...

What are the characteristics of Megmeet PLC - PLC working process? What are the characteristics of Megmeet PLC - PLC working process?

(1) The PLC adopts the working mode of centralized sampling and centralized output, which reduces the influence of external interference. (2) The working process of PLC is the process of cyclic scanning, and the length of cyclic scanning time depends on the speed of instruction execution, the length of the user program and other factors. (3) Output ...

Megmeet inverter – the inverter's protection of itself, the motor and the system Megmeet inverter – the inverter's protection of itself, the motor and the system

1. The inverter protects itself Instantaneous overcurrent, overvoltage, undervoltage, overload, short circuit to ground, abnormal control circuit, then for the protection of the inverter itself, the limit value of overcurrent, overvoltage, undervoltage, etc., when the inverter is running, if it exceeds ...

Megmeet PLC – the three basic process contents of PLC work Megmeet PLC – the three basic process contents of PLC work

1. Input processing Input processing is also called input sampling. In this phase, the through-end state of all input terminals is read sequentially, and the read information is stored in the corresponding image register in memory. Here the input image register is flushed. Then the program execution phase begins. In the execution of the procedure ...

Megmeet drive common fault repair methods Megmeet drive common fault repair methods

When the oscilloscope looks at the current monitoring output of the driver, it is all noisy and cannot be read Cause: The current monitoring output is not blocked from the AC power supply (transformer). Solution: You can use a DC voltmeter to detect and investigate. Servo motor high-speed rotation ...

Megmeet drives – what are the components of a drive? Megmeet drives – what are the components of a drive?

The inverter is composed of a main circuit, a rectifier, a flat wave circuit, and an inverter. 1) Main circuit: The main circuit is the power conversion part that provides voltage regulation and frequency regulation power supply for the asynchronous motor, and the main circuit of the inverter can be roughly divided into two categories: the voltage type is the DC ...

Megmeet inverter - maintenance precautions for high-voltage inverter Megmeet inverter - maintenance precautions for high-voltage inverter

1. Carefully monitor and record the display parameters on the man-machine interface of the inverter, and reflect the abnormality immediately 2. Carefully monitor and record the ambient temperature of the frequency conversion room, and the ambient temperature should be between -5 °C and 40 °C. The temperature rise of the phase-shifting transformer should not exceed 130°C 3. Summer temperature ...

Hollysys edge intelligent controller and edge intelligent all-in-one machine launched new products Hollysys edge intelligent controller and edge intelligent all-in-one machine launched new products

Transportation power, urban rail responsibility. With the vigorous development of emerging technologies such as 5G, cloud computing, big data, and artificial intelligence, more innovative technologies are accelerating the empowerment of urban rail transit, and smart urban rail is ushering in a "golden age" of development. As a deep cultivator in the field of smart urban rail, Hollysys adheres to technological innovation.

Megmeet Inverter - Precautions for the Use of Inverter (11-21) Megmeet Inverter - Precautions for the Use of Inverter (11-21)

11. For the occasion when the inverter drives the ordinary motor for constant torque operation, long-term low-speed operation should be avoided as much as possible, otherwise the heat dissipation effect of the motor will become worse and the heating will be serious. If long-term operation at low speed constant torque is required, a variable frequency motor must be selected. 12. For the promotion of negative ...

Megmeet drives – safety precautions for the installation of drives Megmeet drives – safety precautions for the installation of drives

When the inverter is installed and wired; Note: When more than two inverters are installed in the same cabinet, please pay attention to the installation position and spacing to ensure the heat dissipation effect. Dangerous: 1. It should be operated by professional electrical engineering personnel, otherwise there is a risk of electric shock. 2. Please make sure before wiring...

Megmeet inverter maintenance and testing method Megmeet inverter maintenance and testing method

Megmeet inverter maintenance and testing method   1. The Megmeet rectifier module is damaged It is usually caused by grid voltage or internal short circuit. In the case of sweeping internal short circuits, the rectifier bridge is replaced. When dealing with shortcomings on site, the user power grid should be checked. Such as electricity ...

Megmeet drives – the replacement steps for high-voltage drive power units Megmeet drives – the replacement steps for high-voltage drive power units

1) Shut down, so that the inverter out of the operating state; 2) Cut off the high-voltage power supply and push out the high-voltage cabinet trolley (when there is a bypass cabinet. The inverter can be isolated by the disconnecting switch of the bypass cabinet), the local or remote high-voltage disconnect switch can be locked, and the high-voltage cabinet grounding switch can be grounded; 3) Hit ...

Megmeet PLC maintenance and processing methods Megmeet PLC maintenance and processing methods

1. CPU abnormality: When the CPU is abnormally alarmed, check the device connected to the internal line of the CPU unit. The specific method is to replace the units that may cause failures in turn, find out the faulty units, and deal with them accordingly. 2. Memory abnormality: When the memory is abnormal alarm, if it is a program ...

Megmeet welding machine - resistance welding or laser soldering who is more suitable for electronics industry applications Megmeet welding machine - resistance welding or laser soldering who is more suitable for electronics industry applications

Today's electronics industry revolves around high-speed communication and supercomputing on the Internet, and the requirements for electronic products are getting higher and higher. A large number of micro-precision electronic products are constantly testing the response speed and level of major enterprises in the market. Electronics manufacturers perform real-time, accurate ...

Megmeet PLC - What are the main components of PLC control cabinet? Megmeet PLC - What are the main components of PLC control cabinet?

1. Air switch Air switch is also called air circuit breaker, referred to as air open, is an indispensable component of the control cabinet, usually from the outside into the cabinet of power supply, must go through the air open, in order to reach the inside, the function of air open in addition to the power supply, more as short circuit protection and overload protection...

Megmeet PLC - common causes and treatment methods of PLC failures Megmeet PLC - common causes and treatment methods of PLC failures

Peripheral circuit component failure This type of failure often occurs in the failure of the PLC after a certain period of work. In the PLC control loop, if there is a component damage fault, the PLC control system will immediately and automatically stop working. The input circuit is PLC to accept switching quantities, analog quantities, etc.

Megmeet PLC – the three programming languages of PLC Megmeet PLC – the three programming languages of PLC

1. The ladder diagram language is the most commonly used programming language in PLC programming. The CPU reads physical input into a memory table, often referred to as an "input table". The form is evaluated for use in the procedure. Different platforms, using different types of registers; In each scan cycle, follow from left to right, ...

Megmeet Inverter - Summary of Common Faults of High Voltage Inverter (21-32) Megmeet Inverter - Summary of Common Faults of High Voltage Inverter (21-32)

21。 The unit is overheating The radiator in the unit is equipped with a temperature switch (normally closed point), and when the temperature exceeds 85°C, the normally closed point of the temperature relay is disconnected, and the unit is overheated and faulty. Check whether the cabinet top fan is working properly, whether the unit cabinet fan switch is tripped, and whether the filter screen is blocked.

Megmeet PLC – What are the advantages of PLC compared to relays? Megmeet PLC – What are the advantages of PLC compared to relays?

(1) In terms of control method: PLC adopts a program to achieve control, which is easy to change or increase the control requirements, and the contact points of PLC are unlimited; (2) In terms of working mode: PLC adopts serial working mode to improve the anti-interference ability of the system; (3) Control speed: PLC ...

CATEGORIES BYPASS
Customer Service Center

Online Consultation:QQ


ContactContact

Contact: Manager Huang

Contact QQ: 3271883383

Contact number: 13522565663


Scan the code to add WeChat (please save the picture first on the mobile phone)

working hoursworking hours

Weekdays: 9:00-17:00

Holidays: Only emergencies are handled

Contact us

Contact us

Contact number QQ consultation
QQ consultation

3271883383

Company address
Back to top