Schneider disconnector operation inspection content and requirements

Create Date: 2024-8-30 12:03:23|Source: Schneider/Schneider

(1) Whether the closing of the barrier switch is defective, whether there is no failure or dislocation;

(2) The porcelain insulation of the barrier switch should be free of cracks, discharge phenomena and flashover traces;

                                 Schneider disconnector operation inspection content and requirements

(3) Contact checking: a. Check whether the contact surface of the contact is dirty, deformed and corroded, and whether the contact is tilted; b. Check whether the contact tension spring or tension spring is broken; c. Check whether the contact has any heating and redness caused by poor contact.

(4) Whether there is rust or damage to the operating connecting rod and mechanism part, whether the parts are firm, and whether there are abnormal phenomena such as looseness, skewedness, and falling;

(5) For the grounding barrier switch, check whether the ground knife is tight, whether the grounding is outstanding, and whether the visible part of the grounding body is broken;

(6) Check whether the anti-mistaken locking device is outstanding.

More on that
Schneider ATV630 VFD series advantages Schneider ATV630 VFD series advantages

Depending on the customer's requirements, wall-mounted drives, built-in cabinets and floor-mounted free-standing solutions in protection classes IP 21, IP 23, IP 54 and IP 55 are available. Thanks to the built-in pump monitoring function, the device reacts immediately when pump efficiency drops, resulting in ...

Pay attention to the problem of false load connection method in inverter debugging - Schneider Pay attention to the problem of false load connection method in inverter debugging - Schneider

There are many novices who are not familiar with the fake load when repairing the inverter, and the repair of the inverter saves many of their modules with the false load, because the novice repairer generally does not know how to do this, and now the light is on to make it clear that the module is going to be broken. A false load is a resistor with a few hundred ohms ( ...

Advantages and disadvantages of closed busbars compared with open busbars - Schneider Advantages and disadvantages of closed busbars compared with open busbars - Schneider

The advantages of closed busbars over open busbars are: 1) Closing the bus duct can reduce the grounding fault, avoid the short circuit between phases, basically eliminate the grounding defect caused by external moisture, dust and foreign objects, and improve the continuity of generator operation. 2) Eliminate ...

Instrumentation mechanical equipment system - Schneider Instrumentation mechanical equipment system - Schneider

1. Power system: The wire and cable products selected in the power system mainly include overhead bare wires, busbars (busbars), power cables (plastic cables, oil-paper power cables (fundamentally replaced by plastic power cables), rubber cables, overhead insulated cables), branch cables (replacing part of the busbars), ...

Where the inverter filter is suitable - Schneider Where the inverter filter is suitable - Schneider

1. LC filter LC filter is suitable for occasions with low requirements for harmonic content, and a good LC filter can control the distortion rate at 8-10%; 2. Harmonic filter This filter is suitable for harmonic ...

Schneider instrumentation accuracy Schneider instrumentation accuracy

It refers to the degree to which the average value measured repeatedly under certain test conditions is consistent with the true value, which is indicated by error. It is used to indicate the magnitude of the error in the system. In practice, control tests are generally carried out with standardized substances or normative methods, and when there are no standardized substances or normative methods, it is often used to add ...

Causes of Schneider UPS power supply damage Causes of Schneider UPS power supply damage

1. Air conditioning: It is generally forbidden to use UPS power supply, because the air conditioning is very large and belongs to the rational load. Not suitable for belt loads 2. Motor: It is necessary to choose a large-capacity UPS power supply, because it is a rational load, and it is ...

Schneider circuit breaker maintenance method Schneider circuit breaker maintenance method

1. Insist that the air is moist or unclean, and the pipes are not clean, which may have the following consequences: (1) The wet gas is decomposed into mixed gases such as hydrogen and oxygen under the effect of arcing, destroying the insulation between the fractures after the main contact is broken, which is difficult to arc or arc re-ignition, and in severe cases, arc extinguishing will be formed.

Schneider inverter debugging steps and brief description Schneider inverter debugging steps and brief description

Commissioning process of the Schneider 61 series 1. Preparations 1. Measure insulation. Connect the power supply side (R.S.T) and the motor side (U.V.W) of the inverter Disconnect the cable, insulate the cable with a 500 megaohm or 1000 megaohm shake meter, and if it meets the requirements, restore it.

Schneider AC contactor precautions Schneider AC contactor precautions

There are many series of contactors: LC1-SK series: below 6ALC1-K series: 6A-16ALC1-D series: 9A-150ALC1-F series: 115A-800ALC1-B series: 750A-1800A When installing, it should be in accordance with the regulations...

The difference between Schneider verification, calibration, and calibration The difference between Schneider verification, calibration, and calibration

What is the difference and contact between the instrument, external work verification, calibration, and calibration? Verification, calibration, and calibration are all static measurement processes that are carried out in cycles. The meanings are: The verification ---- shall be arranged by the legal metrology department or the statutory authorization in accordance with the verification procedures, after ...

Pressure Reducing Valve in Instrumentation – Schneider Pressure Reducing Valve in Instrumentation – Schneider

A kind of pressure reducing valve in instrumentation refers to a kind of equipment used to control the pressure value. Pressure reducing valves are usually used in water-related categories, because from the perspective of the transmission medium, the transmission medium of the equipment is mainly water, but we all know that water is a thing that will ...

The role of Schneider instrumentation in the air separation process The role of Schneider instrumentation in the air separation process

The appearance of the instrument plays a very important role in the air separation equipment and gas purification process, and it is indispensable for the adjustment of the air separation process and the detection of product quality. Because there are different types of on-line profiles for monitoring targets in different gaseous media at each stage of the ASU process, the ...

Schneider Compact NSX series molded case circuit breaker selection recommendation Schneider Compact NSX series molded case circuit breaker selection recommendation

The molded case circuit breaker is an important part of the maintenance of the low-voltage distribution system and the motor, and maintains the safety of the distribution system and electrical equipment. As an important application scenario of molded case circuit breakers, these key occupations of new infrastructure such as new energy and telecommunications have extremely important equipment performance, stability and adaptability.

Introduction to Schneider inverter inverter Introduction to Schneider inverter inverter

The inch movement in Schneider inverter means that the control signal can drive the motor intermittently according to a certain law, and the motor strictly follows the dynamic and stop command action of the control signal, and the motor does not roll by inertia during the shutdown. It's like moving an inch and then stopping. The full name of Schneider inverter is "...

Analysis of the causes of frequent overcurrent alarms of inverters - Schneider Analysis of the causes of frequent overcurrent alarms of inverters - Schneider

(1) Caused by incorrect parameter setting. If the acceleration time of the inverter is set too short, the change of the output frequency of the inverter far exceeds the change of the motor frequency, and when the inverter is started, it will trip due to overcurrent. Adjusting the acceleration time accordingly to different load conditions can eliminate this problem.

How to identify the quality of an inverter – Schneider How to identify the quality of an inverter – Schneider

Nowadays, the function of domestic inverters is becoming more and more mature, with a wide variety and dazzling. Many brands have been tested by the market, but there are also some brands that have been imitated and counterfeited to disrupt the market. One of the major characteristics of domestic brands is that they are both like domestic brands and imported brands. The brand's ...

Diode selection and substitution method - Schneider Diode selection and substitution method - Schneider

1. Selection of detection diode Point-contact germanium diodes are generally used for detection diodes, such as 2AP series. When selecting, the detection diode with high operating frequency, small reverse current and large forward current should be selected according to the specific requirements of the circuit. Despite the ...

Frequency converter and PLC connection problems - Schneider Frequency converter and PLC connection problems - Schneider

When the inverter is used to form an automatic control system for control, in many cases, the PLC and the inverter are used together, and how to correctly connect the PLC and the inverter together has become the key to the success of the system. 1.PLC switch ...

Precautions for false load connection in Schneider inverter debugging Precautions for false load connection in Schneider inverter debugging

There are many novices who are not familiar with the fake load when repairing the inverter, and the repair of the inverter saves many of their modules with the false load, because the novice repairer generally does not know how to do this, and now the light is on to make it clear that the module is going to be broken. A false load is a resistor with a few hundred ohms ( ...

CATEGORIES BYPASS
Customer Service Center

Online Consultation:QQ


ContactContact

Contact: Manager Huang

Contact QQ: 3271883383

Contact number: 13522565663


Scan the code to add WeChat (please save the picture first on the mobile phone)

working hoursworking hours

Weekdays: 9:00-17:00

Holidays: Only emergencies are handled

Contact us

Contact us

Contact number QQ consultation
QQ consultation

3271883383

Company address
Back to top