Although many names such as relays, timers and counters are often used in the ladder diagram programs used by LS PLC, LS PLC does not have these hardware physically, but uses memory and program programming to do logic control and editing, and connects the output components to external mechanical devices for physical control. As a result, the hardware space required for the controller can be greatly reduced. In fact, the PLC fulfillment ladder diagram program works line by line, first reading the ladder diagram code into the CPU in the form of scanning, and then performing the control operation.
In the whole scanning process, there are three major processes, "Input Status View", "Program Fulfillment", and "Output Status Update" are described as follows:
Process 1 "Input Status View" first checks the status of each point switch or sensor connected to the input element (1 or 0 represents on or off), and writes its status into the corresponding position Xn in memory.
Process 2 "Program Fulfillment": Extract the ladder diagram program into the CPU line by line for calculation, if the program fulfillment needs to input the contact status, the CPU will directly query and take it out from the memory. The calculation results of the output coil are stored in the corresponding direction in the memory, and will not be reflected to the output Yn for the time being.
Process 3 "Output Status Update": Update the output status of Process 2 to the PLC output contact, and return to Process 1. These three processes are called the PLC scanning cycle, and the time required to complete is called the PLC response time, if the PLC input signal time is less than this response time, there is a possibility of misreading. After each program execution and before the next program execution, the output and input status will be updated once, so this mode of operation is called "program completion regeneration" at the output and input terminals.
|
More on that
|
Summer maintenance and maintenance of inverter method - LS power generation
1. Check the running status of the inverter, whether the voltage and current value during operation are within the normal range.
2. Carefully monitor and record the ambient temperature of the frequency conversion chamber, which is generally between -5 °C and 40 °C. The temperature rise of the phase-shifting transformer should not exceed 130°C.
3. Prevent ...
|
|
Reasonable selection of LS inverter
The selection of the inverter should be considered according to the type of controlled object, speed regulation scale, static speed accuracy, starting torque, etc., so that it is easy to use and economical together with the satisfaction of process and production requirements.
1. Inverter and the motor to be operated
(1) The number of poles of the motor. General motor ...
|
|
How to use the installation wiring of the LS inverter
1. Circuit wiring
(1) The input (R, S, T) and output (U, V, W) of the inverter cannot be connected incorrectly;
(2) Wire diameter selection
(1) The wiring of the power supply and the inverter and the wire diameter selection method of the motor of the same capacity are the same;
(2) The wiring between the inverter and the motor should consider the line electricity.
|
|
The principle and function of the power production contactor
The working principle of the power production contact is: when the contact coil is energized, the coil current generates a magnetic field, and the generated magnetic field leads the static iron core to produce electromagnetic attraction to the iron core, and drives the AC contact action, the normally closed contact is disconnected, the normally open contact is closed, and the two are connected to each other. When the coil is de-energized, the electric ...
|
|
The size of the contactor is selected by the type of contactor - LS produces electricity
1. Select the corresponding category of contactor according to the control object, operation times and application category of the contactor.
2. Select according to the rated voltage of the line at the application location.
3. Select the rated current of the main contact of the contactor according to the load capacity.
4. About the voltage level of the lead coil ...
|
|
Introduction to electrical equipment - LS Electricity
According to the requirements of safe, high-quality, reliable and economical operation of the production, transforming, transportation, distribution and use of electric energy in power plants and substations, the following electrical equipment is mainly included.
1. Primary equipment
Directly involved in production, ...
|
|
LS Electric reached a strategic cooperation with Nandu Power Supply and Changzhou Kunlan
Due to the "new infrastructure" policy, the Chinese government has vigorously promoted the new energy and ESS markets, and according to CNESA, the cumulative electrochemical energy storage scale in China will reach 19.3GW in 2023, which is expected to exceed 20% of the global market.
June 3 ...
|
|
LS power converter interference phenomenon
1. As soon as the inverter of the heat exchange station is opened, the pressure transmitter jumps randomly;
2. Use the inverter to control the water supply, the pressure transformer is used as the signal to collect the pressure, and the pressure transformer is disturbed by the inverter;
3. When the inverter starts the motor, the voltage converter signal is unstable and beats violently;
4. Pressure transformer (4-20 ...
|
|
The given way of the inverter - LS generates electricity
Frequency given meaning and given method
The speed of the motor can be changed by changing the output frequency of the inverter. In order to adjust the output frequency of the inverter, the inverter must supply the signal of the changed frequency, which is called the frequency given signal.
|
|
Inverter harmonic suppression method - LS power generation
1. Install an appropriate reactor
The input side and the output side of the inverter are connected in series with suitable reactors to absorb harmonics and increase the impedance of the power supply or load, so as to achieve the purpose of pressing harmonics to reduce electromagnetic radiation in the transmission process. After pressing the harmonic current, the power factor is changed from the original ...
|
|
LS Electric helps Cisco Smart City build an industry benchmark
In March 2019, LS Group signed a strategic cooperation agreement with Country Garden to build Cisco Smart City into an innovative model for smart cities. LS Electric will provide power distribution system solutions for Cisco (Guangzhou) Smart City, providing frame circuit breakers, molded case circuit breakers, vacuum circuit breakers, miniature circuit breakers, and micro circuit breakers.
|
|
How LS produces power PLC operation
Although many relays, timers and counters are often used in the ladder diagram programs used by LS PLC, LS PLC does not have these hardware physically, but uses memory and program programming methods to make logic control modifications, and connects external machines through output components.
|
|
LS has reached agreements with Doosan and Hanwha in Korea on a business model for vacuum power generation
LS Electric recently signed an MOU agreement with Doosan Fuel Cell, Hanwha Power Systems, and Hanwha Asset Management in Seoul, Korea, to establish a business partnership for city gas companies to develop a fuel cell-vacuum power generation business model. Through this agreement, the two sides will expand the scope of cooperation ...
|
|
The difference between multi-function and general-purpose inverters
Multi-function inverters need to meet the following two conditions:
First, it can be driven by constant torque load, regardless of the type of machine, and can ensure continuous operation even if the load fluctuates greatly. If the above conditions are not satisfied, the inverter will be easy to stop, difficult to start again, and resistant to ...
|
|
Electricity-producing permanent magnet AC contactor structure
The contactor is mainly composed of a drive system, a contact system, an arc extinguishing system and other parts.
1. Drive system: The drive system includes electronic modules, soft iron, and permanent magnets, which is an important part of the permanent magnet contactor.
|
|
Inverter harmonic calculation method - LS power generation
1. Method 1
Method 1: Fourier transform to obtain the amplitude and phase of each harmonic of voltage and current, calculate the active power of each harmonic according to P=√3UIcosφ, and add the active power of all harmonics to obtain the harmonic power.
Method 2: Measure the total active work ...
|
|
Faulty failure with soft starter - LS generates electricity
In the use of soft starters, some users often have some wrong concepts:
1. It is believed that whether the motor can be started successfully is related to the function of the soft starter, and a good brand or even a foreign brand should be selected under heavy load.
2. When the motor is not ...
|
|
Inverter overvoltage fault analysis method - LS power generation
The overvoltage of the inverter is manifested in the tributary voltage of the DC bus. Under normal conditions, the direct current of the inverter is the average value of the three-phase full-wave rectification. If calculated by 380V line voltage, the average DC voltage Ud=1.35U line=513V.
|
|
Types and characteristics of PLC digital output modules for power production
The main functions and functions of PLC:
1. For sequential control: sequential control is based on the current and pre-historical situation of the input switch, and produces the required switching output, so that the system can operate in a certain order. ...
|
|
Introduction of LS electric power contactors
How LS Contactor Works:
Generally, after the contactor coil is energized, the entire coil current will generate a magnetic field, which will make the core inside have electromagnetic attraction to attract the core, and let their communication contactor point action normally closed contact disconnect, or close, which ...
|
|