When LS PLC is put into operation, its operation process is generally divided into three stages: input sampling, user program fulfillment and output rewriting. The completion of these three phases is called a scan cycle. Throughout the entire run, the PLC's CPU repeats the above three phases at a certain scanning speed.
(1) Input sampling stage In the input sampling stage, the PLC reads all input conditions and data in turn by scanning method, and stores them in the corresponding unit in the I/O image area. After the input sampling is complete, it moves to the user program fulfillment and output rewriting phase. In both phases, even if the input status and data change, the condition and data of the corresponding cells in the I/O image area will not change. Therefore, if the input is a pulsed signal, the width of the pulse signal must be greater than one scan period to ensure that the input can be read in any case.
(ii) User program fulfillment phase
During the user program fulfillment stage, LS PLC always scans the user program in a top-down order (ladder diagram). When scanning each ladder diagram, the control circuit composed of each contact on the left side of the ladder diagram is always scanned first, and the control circuit composed of the contacts is logically operated according to the order of first left and then right, first up and then down, and then according to the results of logical operation, the condition of the corresponding position of the logic coil in the system RAM storage area is rewritten; Perhaps override the position of the output coil in the I/O image; It may be determined whether or not the special functional instructions specified in the ladder diagram are to be fulfilled.
That is, in the process of user program fulfillment, only the status and data of the input points in the I/O image area will not change, while the conditions and data of other output points and soft devices in the I/O image area or the system RAM storage area may change, and the ladder diagram ranked above, the program performance results will play a role in the ladder diagram of those coils or data that are used in the lower section; Conversely, the condition or data of the overwritten logic coils in the ladder diagram below can only be used for the program above it until the next scan cycle.
During the execution of the program, if the immediate I/O command is used, the I/O point can be accessed directly. Even if the I/O command is used, the value of the input process impression register will not be updated, the program will take the value directly from the I/O module, and the output process impression register will be updated immediately, which is a bit different from the immediate input.
(iii) Output rewriting phase
When the user program is scanned, the LS PLC enters the output rewriting stage. During this period, the CPU overrides all the output latch circuits according to the corresponding conditions and data in the I/O image area, and then drives the corresponding peripherals through the output circuits. At this time, it is the real output of the PLC.
|
More on that
|
The production power takes you to read the PLC ladder diagram
1. Trapezoidal stairs start from the horizontal line and end up with a vertical line (generally you can omit not to draw, only draw the left busbar). On the left side of each row is the junction combination, indicating the conditions that drive the logic coil, while the logic coil indicating the effect can only be connected to the bus on the right. The contact can not appear in the coil right ...
|
|
The five stages of mastery of PLC technology
One. Logical stage
The so-called logical stage is to be able to complete the general logical planning in the relay system, since it is a relay system, so the knowledge of power drag is the foundation of this stage. I personally summarize that the root of learning the relay system lies in the word "grab", the relay system ...
|
|
The difference between servo drive and frequency converter - LS produces electricity
Servo drives and frequency converters are defined differently
The driver, also known as servo manipulator and servo amplifier, is a kind of manipulator used to control servo motors, and its function is similar to that of a frequency converter acting on a general communication motor. It is part of the servo system, mainly used for high-precision positioning ...
|
|
Introduction to wiring problems - LS power generation
1. Wiring of fire emergency lighting
Generally, the flame retardant wire is used to wear the metal pipe and the thickness of the protective layer is ≥ 30mm.
|
|
LS power converter interference phenomenon
1. As soon as the inverter of the heat exchange station is opened, the pressure transmitter jumps randomly;
2. Use the inverter to control the water supply, the pressure transformer is used as the signal to collect the pressure, and the pressure transformer is disturbed by the inverter;
3. When the inverter starts the motor, the voltage converter signal is unstable and beats violently;
4. Pressure transformer (4-20 ...
|
|
The given way of the inverter - LS generates electricity
Frequency given meaning and given method
The speed of the motor can be changed by changing the output frequency of the inverter. In order to adjust the output frequency of the inverter, the inverter must supply the signal of the changed frequency, which is called the frequency given signal.
|
|
LS produces common sense of electroplastic case circuit breaker
Now in the process of using molded case circuit breakers, it is necessary to understand the rated current of molded case circuit breakers, and the rated current of molded case circuit breakers generally has more than a dozen, mainly 16A, 25 A, 30A, and the height may reach 630A.
L ...
|
|
LS power terminal is faulty
From the perspective of application, the function of the terminal block should be achieved: the contact part should be conducted, and the contact should be reliable. The insulating parts should not be conducted, and it is necessary to insulate them firmly. There are three common forms of fatal failure of terminal blocks:
...
|
|
LS Electric helps Cisco Smart City build an industry benchmark
In March 2019, LS Group signed a strategic cooperation agreement with Country Garden to build Cisco Smart City into an innovative model for smart cities. LS Electric will provide power distribution system solutions for Cisco (Guangzhou) Smart City, providing frame circuit breakers, molded case circuit breakers, vacuum circuit breakers, miniature circuit breakers, and micro circuit breakers.
|
|
Fault solution for three-phase asynchronous motor - LS power generation
1. The motor cannot roll after being energized, but there is no abnormal noise, no peculiar smell and smoke.
1. Cause of the problem: (1) The power supply is not connected (at least two phases are not connected); (2) Fuse blowing (at least two-phase blowing); (3) The overcurrent relay is adjusted too small; (4) The wiring of the control equipment is faulty.
2. Question ...
|
|
Advantages and disadvantages of LS inverter non-sensing vector control
The first generation of LS inverter selects the voltage frequency ratio scalar control method, which carries out frequency conversion speed regulation according to the linear ratio determined by the equivalent circuit of the asynchronous motor. Voltage refers to the effective value of the fundamental wave, and changing U/f can only regulate the steady-state magnetic flux and torque of the motor, not to mention dynamic control. In order to improve the low ...
|
|
Analysis of the working principle of the inverter - LS power generation
The rectified DC voltage of the rectifier contains the pulsating voltage of the power supply 6 times the frequency, and the pulsating current generated by the inverter also changes the DC voltage.
The main power is the power replacement part of the power supply for the asynchronous motor voltage regulation and frequency modulation power supply, and the main power of the inverter can be roughly divided into two ...
|
|
LS Electric reached a strategic cooperation with Nandu Power Supply and Changzhou Kunlan
Due to the "new infrastructure" policy, the Chinese government has vigorously promoted the new energy and ESS markets, and according to CNESA, the cumulative electrochemical energy storage scale in China will reach 19.3GW in 2023, which is expected to exceed 20% of the global market.
June 3 ...
|
|
Quickly locate the fault method of switching power supply - LS power generation
Due to the short circuit of the load, the failure of the self-oscillation circuit and the loss of control of the protection circuit, the switching power supply will cause the base of the switch tube to be unable to get the switching pulse and intermittent operation, which makes it difficult to locate the shortcomings of SMPS. The difficulty of the repair operation and the improper method will expand the shortcomings, constituting the phenomenon of continuous burning of the switch pipe, etc., ...
|
|
LS power generation installs the switching power supply step
The basic method of switching the power supply of the device requires us to carry out the corresponding installation and debugging according to the specific model and the device environment. And in the process of installation, we need to pay more attention to safety and stability to ensure the normal operation of the switching power supply.
...
|
|
Introduction of LS power products
1. Power-related products: medium, low and high voltage electrical products;
(1) Low Voltage Products: Molded Case Circuit Breaker, Air Circuit Breaker, LS Contactor & Overload Relay, Miniature Circuit Breaker, Dual Power Automatic Transfer Switch, Intelligent Motor Protector, Manual Motor Starter, Surge Protection ...
|
|
The protection measures of the power generator inverter for the motor
The protection of the motor by the power converter mainly includes the following aspects: overvoltage protection, undervoltage protection, overcurrent protection, phase loss protection, inverter protection, overload protection, grounding protection, short circuit protection, overfrequency protection and stall protection.
...
|
|
The choice of inverter power - LS produces electricity
1. The power value of the inverter is the most suitable for the power value of the motor, so as to facilitate the operation of the inverter at a high power value.
2. When the power classification of the inverter is not the same as the power classification of the motor, the power of the inverter should be as much as possible.
|
|
The cause of the failure of low-voltage electrical appliances - LS power generation
In the control circuit of low-voltage electrical appliances, there are simple low-voltage components such as: buttons, safe, etc.; There are also slightly messy low-voltage electrical control components, such as circuit breakers, touch devices, time relays, thermal relays and other simple components, which makes it necessary to diagnose and analyze the cause of the problem.
...
|
|
What are the determinants of the performance of LS inverters?
The quality of the control circuit determines the function of the LS inverter.
The function of the DC central circuit is to smooth the output of the rectifier circuit to ensure that the inverter circuit and the control power supply can obtain a high-quality DC power supply. When the whole ...
|
|